Permit #2019051274
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00510-0020 |
| CONDITIONED SPACE: 2306 sqft |
| GARAGE: 466 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| OPENED PORCH (WITH ROOF) : 138 sqft |
| Total Square Footage: 2942 sqft |
| Block: 00510 |
| Subdivision: 2123 - SECTION 57-ULYSSES TREES |
| Job Phone: 407-807-0656 |
| Location Address: 10 UNITY CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/12/2019 |
| NOC: RECORDED |
| Applicant name: NAVIN SUGRIM |
| Owner: WATSON HAZEL P |
|
Address 23 1/2 HAZEL STREET MORRISTOWN, NJ 07960 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤148,359.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DLP BUILDERS LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
CBC1263567 (Exp: 08/31/2022) | 407-807-0656 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/17/2020 | FINAL APPROVED | FWILLIS |
| U -UTILITY RESIDENTIAL FINAL | 04/17/2020 | APPROVED | AHALL |
| ROW - STORMWATER FINAL | 04/16/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: SPOKE WITH CONTRACTOR. DUMPSTER ON SITE WILL BE PICKED UP LATER IN THE DAY | |||
| ROW - FINAL APRON (AFTER POUR) | 04/16/2020 | APPROVED | MMAJEWSKI |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/31/2020 | APPROVED | MMAJEWSKI |
| FINAL SURVEY (OFFICE USE ONLY) | 03/31/2020 | APPROVED | MMAJEWSKI |
| ELECTRIC - EARLY POWER | 03/03/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:00 am | |||
| ROW- PRE-APRON (PRE-POUR) | 02/12/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION. It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/11/2020 | Disapproved - NO FEE | MMAJEWSKI |
| Note: THIS IS A REINSPECTION. CONCRETE DEBRIS FROM OVER POUR WILL NEDD TO BE REMOVED WASHOUTS NEED TO BE FIXED, MATERIAL SHOULD ONLY BE HALF WAY UP THE PIPE | |||
| ROW- PRE-APRON (PRE-POUR) | 02/05/2020 | Disapproved - NO FEE | MMAJEWSKI |
| Note: FLARED ENDS ARE UNEVEN, LEFT SIDE IS ABOUT A FOOT AND AHALF LONGER THAN THE RIGHT SIDE | |||
| GRAVITY SEWER TEST | 01/07/2020 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 01/07/2020 | APPROVED - AS NOTED | JGIBSON |
| Note: UTILITY DEPARTMENT INSTALLED DOUBLE WYE AND MADE TAP | |||
| LATH/BRICK/ WATER BARRIER | 12/20/2019 | APPROVED | FWILLIS |
| INSULATION | 12/17/2019 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 12/16/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. FIREBLOCKING R302.11 (4) Plumbing VTRs at common bath and laundry areas Aslo the following was requested by insulatiion and has not been resolved... 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1) | |||
| ELECTRIC-TUG | 12/16/2019 | APPROVED - AS NOTED | RMARTIN |
| ALL ROUGH | 12/12/2019 | APPROVED - AS NOTED | FWILLIS |
| Note: Need 5' of head pressure as required. Will Inspect on next Inspection. P2503.5.1 (1) | |||
| ROOF VALLEY & METAL | 11/15/2019 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/13/2019 | APPROVED | JDELBONIS |
| TIE BEAM / LINTEL | 11/04/2019 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 11/01/2019 | APPROVED | JMUNSON |
| MONOLITHIC SLAB | 10/25/2019 | APPROVED | JDELBONIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/22/2019 | APPROVED | MWILLIAMS |
| WATER METER INSTALLATION REQUEST | 08/21/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 11/01/2019 | 11/01/2019 |
| Note: Released By: JMUNSON | |||
| ZON | COMPLETE | 06/21/2019 | 06/24/2019 |
| Note: Released By: AMOBLEY | |||
| SWALE | COMPLETE | 06/04/2019 | 06/14/2019 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 05/30/2019 | 06/05/2019 |
| Note: Released By: RLEE | |||
| CUSVC | COMPLETE | 05/30/2019 | 05/30/2019 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 05/30/2019 | 06/05/2019 |
| Note: Released By: RLEE | |||
| ENGIN1 | COMPLETE | 05/30/2019 | 06/04/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 05/30/2019 | 05/31/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 05/30/2019 | 06/05/2019 |
| Note: Released By: RLEE | |||
| PLUM | COMPLETE | 05/30/2019 | 06/05/2019 |
| Note: Released By: RLEE | |||
| SW1 | COMPLETE | 05/30/2019 | 06/04/2019 |
| Note: Released By: JMUNSON | |||
| UD1 | COMPLETE | 05/30/2019 | 06/05/2019 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 05/30/2019 | 05/31/2019 |
| Note: Held By: AMOBLEY Please specify the driveway material on site plan/survey Please list the color manufacturer and correct lrv for exterior and garage colors |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 05/04/2020 |
| REINSPECTION FEE | ¤40.00 | 02/21/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 02/21/2020 |
| METER - DEPOSIT | ¤60.00 | 07/12/2019 |
| WATER- TURN ON | ¤25.00 | 07/12/2019 |
| ADMIN FEE | ¤20.00 | 07/12/2019 |
| CONNECTION FEES | ¤985.25 | 07/12/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤564.00 | 07/12/2019 |
| SITE PLAN 20 | ¤20.00 | 07/12/2019 |
| SURCHARGE FS 533.721 | ¤12.92 | 07/12/2019 |
| SURCHARGE - FS 468.631 | ¤19.37 | 07/12/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/12/2019 |
| SEWER INSPECTION | ¤25.00 | 07/12/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 07/12/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 07/12/2019 |
| ELECTRIC FEE | ¤229.20 | 07/12/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 07/12/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 07/12/2019 |
| IMPACT FEE FIRE | ¤223.38 | 07/12/2019 |
| IMPACT FEE PARKS | ¤849.24 | 07/12/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/12/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 07/12/2019 |
| MECHANICAL FEE | ¤229.20 | 07/12/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/12/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 07/12/2019 |
| PLAN CHECK FEE | ¤112.80 | 07/12/2019 |
| PLUMBING FEE | ¤229.20 | 07/12/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,852.77 |