I want to search for...
Permit #2019051300
Permit Details
Status: COED
| Parcel Id: 07-11-31-7027-00440-0050 |
| CONDITIONED SPACE: 2252 sqft |
| GARAGE: 757 sqft |
| OPENED PORCH (WITH ROOF) : 62 sqft |
| OPENED PORCH (WITH ROOF) : 335 sqft |
| Total Square Footage: 3406 sqft |
| Block: 00440 |
| Subdivision: 2128 - SECTION 27-WYNNFIELD |
| Job Phone: (386)445-2012 |
| Location Address: 6 WOOD CREST LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/17/2019 |
| NOC: RECORDED |
| Applicant name: JOHN DONALD GORDON |
| Owner: GORDON DON |
|
Address 3305 WESTMEATH DRIVE ORMOND BEACH, FL 32174 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤180,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. Box 354786 Palm Coast, FL 32137 |
CGC062646 (Exp: 08/31/2020) | (386)445-2012 | (386)446-7928 |
Sub Contractors
JOSEPH JOHN VERRECHIO
| Status | Location Address | State License Number | Phone |
| CANCEL |
1325 WEST STATE RD. 100 BUNNELL, FL 32110 |
EC13004254 (Exp: 08/31/2024) | 386-447-9644 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/21/2020 | FINAL APPROVED | WMILLER |
| U -UTILITY RESIDENTIAL FINAL | 01/21/2020 | APPROVED - AS NOTED | LFITZGERALD |
| Note: soke with Don and requested a full wrap of sod for the sewer clean out cap which is along the left lot line. He agreed. | |||
| ROW - STORMWATER FINAL | 01/15/2020 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 01/15/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/20/2019 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: WASH OUT ON LEFT SIDE OF PROPERTY IN THE R.O.W. WILL NEED TO BE CLEANED UP AND STABILIZED BEFORE STORMWATER FINAL | |||
| FINAL SURVEY (OFFICE USE ONLY) | 11/20/2019 | APPROVED | MMAJEWSKI |
| ROW - FINAL APRON (AFTER POUR) | 10/31/2019 | Disapproved - NO FEE | KHOWELL |
| Note: FINAL SURVEY MUST BE APPROVED PRIOR TO CALLING ANY FINAL INSPECTIONS IN. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/18/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: RAIN IN FORECAST It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| U - SEWER TIE IN | 10/17/2019 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 10/17/2019 | APPROVED | JGIBSON |
| SEWER SERVICE | 10/17/2019 | CANCELLED BY INSPECTOR | JGIBSON |
| Note: NOT WARRANT FOR RESIDENIAL | |||
| LATH/BRICK/ WATER BARRIER | 09/25/2019 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 09/24/2019 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: Still working at the time of my inspection. Not complete. | |||
| ELECTRIC - EARLY POWER | 09/24/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 3:50 | |||
| ELECTRIC - EARLY POWER | 09/23/2019 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: MASTER BATH ROOM VANITY LIGHTS NOT SAFED OFF, NEED TO SAFE OFF ALL CONDUCTORS BEFORE INSPECTION IS CALLED IN | |||
| INSULATION | 08/27/2019 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 08/26/2019 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: not ready | |||
| ALL ROUGH | 08/22/2019 | APPROVED | JDELBONIS |
| ROOF VALLEY & METAL | 08/19/2019 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/12/2019 | APPROVED - AS NOTED | JCOLASANTI |
| Note: THIS IS A REINSPECTION need bolts per detail at bearing wall by dinning room FBC 802 (marked on plans) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/06/2019 | CANCELLED BY APPLICANT | JCOLASANTI |
| Note: per phone call | |||
| TIE BEAM / LINTEL | 08/01/2019 | APPROVED | FWILLIS |
| Note: Per Forest | |||
| TIE BEAM / LINTEL | 07/31/2019 | Disapproved - NO FEE | FWILLIS |
| Note: forest approved by mistake | |||
| FOUND SURVEY APPROVED (OFFICE) | 07/17/2019 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 07/10/2019 | APPROVED | CSTONE |
| MONOLITHIC SLAB | 07/08/2019 | APPROVED | JDELBONIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/03/2019 | APPROVED | JGIBSON |
| ELECTRIC TEMP POLE | 06/28/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 11:35 |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 07/17/2019 | 07/17/2019 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 06/07/2019 | 06/14/2019 |
| Note: Released By: JHINDMAN | |||
| ZON | COMPLETE | 06/07/2019 | 06/10/2019 |
| Note: Released By: AMOBLEY | |||
| SWALE | COMPLETE | 06/04/2019 | 06/25/2019 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 05/30/2019 | 06/06/2019 |
| Note: Held By: JHINDMAN 1. The proposed footing height will not meet the minimum footing depth and heght above grade based on the proposed drainage plan elevations at the slab. 6th ed. FBC R401.3 and 403.1.4. | |||
| CUSVC | COMPLETE | 05/30/2019 | 05/30/2019 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 05/30/2019 | 06/05/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 05/30/2019 | 06/04/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 05/30/2019 | 06/03/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 05/30/2019 | 06/03/2019 |
| Note: Released By: CSTONE | |||
| PLUM | COMPLETE | 05/30/2019 | 06/05/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 05/30/2019 | 06/04/2019 |
| Note: Released By: JMUNSON | |||
| UD1 | COMPLETE | 05/30/2019 | 06/05/2019 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 05/30/2019 | 05/31/2019 |
| Note: Held By: AMOBLEY Walkway to front entry must be shown on survey/site plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/21/2020 |
| REINSPECTION FEE | ¤40.00 | 01/21/2020 |
| REINSPECTION FEE | ¤40.00 | 01/21/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤594.00 | 06/17/2019 |
| SITE PLAN 20 | ¤20.00 | 06/17/2019 |
| SURCHARGE FS 533.721 | ¤13.49 | 06/17/2019 |
| SURCHARGE - FS 468.631 | ¤20.23 | 06/17/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/17/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 06/17/2019 |
| SEWER CREDIT | (¤2,291.75) | 06/17/2019 |
| SEWER INSPECTION | ¤25.00 | 06/17/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 06/17/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 06/17/2019 |
| METER - DEPOSIT | ¤60.00 | 06/17/2019 |
| WATER- TURN ON | ¤25.00 | 06/17/2019 |
| ADMIN FEE | ¤20.00 | 06/17/2019 |
| CONNECTION FEES | ¤985.25 | 06/17/2019 |
| ELECTRIC FEE | ¤238.20 | 06/17/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 06/17/2019 |
| IMPACT FEE FIRE | ¤223.38 | 06/17/2019 |
| IMPACT FEE PARKS | ¤849.24 | 06/17/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/17/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 06/17/2019 |
| MECHANICAL FEE | ¤238.20 | 06/17/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/17/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 06/17/2019 |
| PLAN CHECK FEE | ¤118.80 | 06/17/2019 |
| PLUMBING FEE | ¤238.20 | 06/17/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,583.19 |