I want to search for...

Permit #2019060023

Permit Details

Status: COED

Parcel Id: 07-11-31-7023-00310-0150
CONDITIONED SPACE: 1983 sqft
GARAGE: 516 sqft
OPENED PORCH (WITH ROOF) : 106 sqft
OPENED PORCH (WITH ROOF) : 48 sqft
Total Square Footage: 2653 sqft
Block: 00310
Subdivision: 2191 - SECTION 23-WYNNFIELD
Job Phone: 407-307-4753
Location Address: 31 WHITE STAR DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/12/2019
NOC: RECORDED
Applicant name: SHAWN VIRAG
Owner: BRITE PROPERTIES OF FLORIDA

Address

7345 GREENBRIAR PARKWAY

ORLANDO, FL 32819

Lot: 0150
Contracted Stated Job Value: ¤135,076.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SHAWNTELLE CONSULTING AND DESIGN LLC
Status Location Address State License Number Phone
CANCEL

611 LARGOVISTA DR

OAKLAND, FL 34787

CBC1261160 (Exp: 08/31/2020) 407-307-4753

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/04/2020 CANCELLED BY APPLICANT WEB
BLD - BUILDING FINAL 03/03/2020 FINAL APPROVED FWILLIS
Note: per Forest
ROW - STORMWATER FINAL 03/03/2020 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION DUMPSTER AND PORTA POTTY NEED TO BE REMOVED AND ANY DAMAGE TO THE SWALE WILL NEED TO BE FIXED. MISC CONSTRUCTION REMNANTS NEED REMOVED ALONG THE LEFT SIDE PROPERTY LINE. CONCRETE BLOCK, MORTOR BAG, DRIED CONCRETE MORTER, AND OTHER MISC TRASH.
ROW - STORMWATER FINAL 03/03/2020 APPROVED - AS NOTED MMAJEWSKI
Note: DUMPSTER AND PORTA POTTY ACROSS THE STREET WILL REMAIN FOR A NEW JOB THAT WILL BE STARTING SHORTLY
U -UTILITY RESIDENTIAL FINAL 03/03/2020 FINAL APPROVED LFITZGERALD
SEWER SERVICE 03/02/2020 CANCELLED BY INSPECTOR JGIBSON
Note: NOT NEEDED FOR RESIDENTIAL
ELECTRIC - EARLY POWER 03/02/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 11:00
ROW - STORMWATER FINAL 03/02/2020 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION DUMPSTER AND PORTA POTTY NEED TO BE REMOVED AND ANY DAMAGE TO THE SWALE WILL NEED TO BE FIXED. MISC CONSTRUCTION REMNANTS NEED REMOVED ALONG THE LEFT SIDE PROPERTY LINE. CONCRETE BLOCK, MORTOR BAG, DRIED CONCRETE MORTER, AND OTHER MISC TRASH.
ROW - STORMWATER FINAL 02/28/2020 Disapproved - NO FEE MMAJEWSKI
Note: DUMPSTER AND PORTA POTTY NEED TO BE REMOVED AND ANY DAMAGE TO THE SWALE WILL NEED TO BE FIXED
ROW - FINAL APRON (AFTER POUR) 02/28/2020 APPROVED MMAJEWSKI
ROW FIELD SURVEY /GRADING CERTIFICATION 02/27/2020 APPROVED MMAJEWSKI
FINAL SURVEY (OFFICE USE ONLY) 02/27/2020 APPROVED MMAJEWSKI
Note: THIS IS A REINSPECTION
FINAL SURVEY (OFFICE USE ONLY) 02/24/2020 Disapproved - NO FEE MMAJEWSKI
Note: NEED PIPE SIZE ON SITE WITH SUPERINTENDENT, AREA ALONG LEFT SIDE OF DRIVE NEEDS TO BE REGRADED AND NEW ELEVATIONS
ELECTRIC - EARLY POWER 02/07/2020 Disapproved -FEE REQUIRED JMUNSON
Note: DO NOT turn power on until Early Power inspection has passed.
ROW- PRE-APRON (PRE-POUR) 02/07/2020 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION. ON SITE WITH SUPER. PUMP WATER OUT OF THE ENDS BEFORE POURING.
ROW- PRE-APRON (PRE-POUR) 02/05/2020 Disapproved - NO FEE RGROSS
Note: THIS IS A REINSPECTION. MISSING DOCUMENTATION. NO BUILDING SITE PLAN INDICATING UNUSUAL CIRCULAR SHAPED DRIVEWAY WITH LENGTH AND WIDTH. LANDSCAPE PLAN NOT ACCEPTED NOR DOES IS SHOW THE INFORMATION NEEDED FOR APPROVAL.
ROW- PRE-APRON (PRE-POUR) 02/03/2020 Disapproved -FEE REQUIRED RGROSS
Note: MISSING DOCUMENTATION. NO SWALE PLAN. NOT 4 INCH DEPTH ALONG THE GARAGE ENTRANCE. NEEDS MORE COMPACTION
U - SEWER TIE IN 12/23/2019 APPROVED JGIBSON
GRAVITY SEWER TEST 12/23/2019 APPROVED JGIBSON
FINAL SURVEY (OFFICE USE ONLY) 12/19/2019 APPROVED CMORALES
PEP TANK INSTALLATION REQUEST 12/06/2019 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 12/03/2019 APPROVED JCOLASANTI
INSULATION 11/12/2019 APPROVED WMILLER
ALL ROUGH 11/06/2019 APPROVED WMILLER
Note: THIS IS A REINSPECTION DEFICIENCIES NOTED BY INSPECTOR JD PRIOR RESOLVED
ALL ROUGH 10/29/2019 Disapproved -FEE REQUIRED JDELBONIS
Note: bathroom fan not wired or sealed completle at roof dryer vent does not vent outside and is not sealed 5 foot head preshure on drain lines
ALL ROUGH 10/08/2019 CANCELLED BY APPLICANT WEB
ROOF VALLEY & METAL 10/08/2019 APPROVED JCOLASANTI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/03/2019 APPROVED - AS NOTED JCOLASANTI
Note: need to remove boards from cells to complete inspection...need to strap valley at rear garage
ELECTRIC-TUG 10/02/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO FPL RELEASED POWER 3:35
TIE BEAM / LINTEL 09/24/2019 APPROVED FWILLIS
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 09/23/2019 Disapproved - NO FEE FWILLIS
Note: Dowels missing through out. Plans do not coincide with on site dwelling. A window is shown (on the plans) on the left side of front entry door. Not there. See highlighted marks on Dowel Lintel & Beam Plan, page.
FOUND SURVEY APPROVED (OFFICE) 09/20/2019 APPROVED JMUNSON
MONOLITHIC SLAB 09/11/2019 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 09/10/2019 Disapproved -FEE REQUIRED JDELBONIS
Note: ufer ground needs to be 20 ft one pice NEC 250.52
PLUMBING 1ST ROUGH UNDERGROUND 08/27/2019 APPROVED - AS NOTED JGIBSON
Note: NEED SILT FENCE PLACED
WATER METER INSTALLATION REQUEST 08/06/2019 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 02/06/2020 02/07/2020
Note: Released By: TBAKER
SW1 COMPLETE 02/06/2020 02/07/2020
Note: Released By: CTROHA
UD1 COMPLETE 02/06/2020 02/10/2020
Note: Released By: LFITZGERALD
ZON COMPLETE 02/06/2020 02/06/2020
Note: Released By: ELENS
ZON COMPLETE 01/07/2020 01/07/2020
Note: Released By: AMOBLEY
ZON HOLD 12/18/2019 12/18/2019
Note: Held By: AMOBLEY Please provide width of circular driveway being added
ENGIN1 COMPLETE 12/18/2019 12/19/2019
Note: Released By: CMORALES
UD1 COMPLETE 12/18/2019 12/19/2019
Note: Released By: AHALL
SW1 COMPLETE 12/18/2019 12/18/2019
Note: Released By: CTROHA The drainage conveyance down the right side property line must be kept within the property boundries and not negatively impact adjacent property
SW1 COMPLETE 09/20/2019 09/20/2019
Note: Released By: JMUNSON Foundation Survey
SWALE COMPLETE 06/21/2019 07/31/2019
Note: Released By: TBAKER
ZON COMPLETE 06/20/2019 06/20/2019
Note: Released By: TDOAK
SW1 COMPLETE 06/20/2019 06/21/2019
Note: Released By: JMUNSON
ENGIN1 COMPLETE 06/20/2019 06/21/2019
Note: Released By: TBAKER
PLUM COMPLETE 06/20/2019 06/27/2019
Note: Released By: JHINDMAN
ZON HOLD 06/04/2019 06/04/2019
Note: Held By: ELENS 1. Site Plan: Add driveway width and material. 2. Landscape Plan: Add fifth tree. Add four shrubs to rear of house. 3. Color Sheet: Add paint manufacturer and correct LRVs.
BLD COMPLETE 06/03/2019 06/10/2019
Note: Released By: JHINDMAN
CUSVC COMPLETE 06/03/2019 06/05/2019
Note: Released By: AROSCOE
ELEC COMPLETE 06/03/2019 06/10/2019
Note: Released By: JHINDMAN
ENGIN1 HOLD 06/03/2019 06/04/2019
Note: Held By: TBAKER No benchmark on survey
LOCATE COMPLETE 06/03/2019 06/04/2019
Note: Released By: CSTONE
MECH COMPLETE 06/03/2019 06/10/2019
Note: Released By: JHINDMAN
PLUM HOLD 06/03/2019 06/10/2019
Note: Held By: JHINDMAN 1. Provide a plumbing riser signed by the plumbing contractor with their license number. 6th ed. FBC 107.1
SW1 HOLD 06/03/2019 06/04/2019
Note: Held By: JMUNSON 1. Remove septic tank and drain field. 2. Provide elevations and grade along both sides of the house and front and back. ULDC Tech Manual Sec5 300
UD1 COMPLETE 06/03/2019 06/10/2019
Note: Released By: LFITZGERALD
ZON HOLD 06/03/2019 06/04/2019
Note: Held By: ELENS

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 03/02/2020
REINSPECTION FEE ¤40.00 02/27/2020
REINSPECTION FEE ¤40.00 02/21/2020
REINSPECTION FEE ¤40.00 02/21/2020
REINSPECTION FEE ¤40.00 02/21/2020
NEW RESIDENTIAL INSPECTIONS ¤494.00 07/12/2019
SITE PLAN 20 ¤20.00 07/12/2019
SURCHARGE FS 533.721 ¤11.59 07/12/2019
SURCHARGE - FS 468.631 ¤17.38 07/12/2019
STORM WATER PERMIT FEES ¤80.00 07/12/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 07/12/2019
SEWER CREDIT (¤1,147.00) 07/12/2019
SEWER INSPECTION ¤25.00 07/12/2019
SEWER CAPITAL FACILITY ¤4,515.25 07/12/2019
WATER CAPITAL FACILITY FEE ¤3,314.84 07/12/2019
METER - DEPOSIT ¤60.00 07/12/2019
WATER- TURN ON ¤25.00 07/12/2019
ADMIN FEE ¤20.00 07/12/2019
CONNECTION FEES ¤985.25 07/12/2019
ELECTRIC FEE ¤208.20 07/12/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 07/12/2019
IMPACT FEE FIRE ¤223.38 07/12/2019
IMPACT FEE PARKS ¤849.24 07/12/2019
IMPACT FEE SCHOOL ¤3,600.00 07/12/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 07/12/2019
MECHANICAL FEE ¤208.20 07/12/2019
WATER -IRRIGATION INSPECTION ¤25.00 07/12/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 07/12/2019
PLAN CHECK FEE ¤98.80 07/12/2019
PLUMBING FEE ¤208.20 07/12/2019
Fees Total Due: ¤0.00 Total Paid: ¤15,593.19