Permit #2019060024
Permit Details
Status: COED
| Parcel Id: 07-11-31-7022-00120-0280 |
| CONDITIONED SPACE: 2306 sqft |
| GARAGE: 466 sqft |
| OPENED PORCH (WITH ROOF) : 138 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| Total Square Footage: 2942 sqft |
| Block: 00120 |
| Subdivision: 2217 - SECTION 22-WYNNFIELD |
| Job Phone: 407-307-4753 |
| Location Address: 10 WESTGRILL DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/12/2019 |
| NOC: RECORDED |
| Applicant name: SHAWN VIRAG |
| Owner: BRITE PROPERTIES OF FLORIDA LLC |
|
Address 7345 GREENBRIAR PARKWAY ORLANDO, FL 32819 |
| Lot: 0280 |
| Contracted Stated Job Value: ¤148,359.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SHAWNTELLE CONSULTING AND DESIGN LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
611 LARGOVISTA DR OAKLAND, FL 34787 |
CBC1261160 (Exp: 08/31/2020) | 407-307-4753 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/14/2020 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 02/13/2020 | Disapproved - NO FEE | FWILLIS |
| Note: THIS IS A REINSPECTION Insulation Energy Calc. not posted or in permit package. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/13/2020 | APPROVED - AS NOTED | LFITZGERALD |
| Note: THIS IS A REINSPECTION-water meter pit that is too high to be adjusted by city utilities | |||
| U -UTILITY RESIDENTIAL FINAL | 02/11/2020 | Disapproved - NO FEE | LFITZGERALD |
| Note: sewer clean out cap required to be flush with proposed grades | |||
| BLD - BUILDING FINAL | 02/11/2020 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: GARAGE CEILING AND WALL, HOLES MUST BE SEALED R302.5, 302.5.2, 302.5.3, 302.6, OPENINGS AND PENITRATIONS THROUGH GARAGE WALLS OR CEILINGS NOT ALLOWED (by water heater) need to seal by AHU also....DISCONNECT BEHIND CONDENSING UNIT NEEDS TO HAVE A WORKING CLEARANCE OF 36" PER NEC 110.26 A1. | |||
| ROW - STORMWATER FINAL | 02/10/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 02/10/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/07/2020 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 02/07/2020 | Disapproved -FEE REQUIRED | RGROSS |
| Note: REMOVE PLANT AND MULCH IN THE EASEMENT. THE OUTSIDE PLANT AND MULCH NEAR A/C UNIT. PORT-O-POTTY NEEDS REMOVED FROM THE ROW. | |||
| ROW - FINAL APRON (AFTER POUR) | 02/07/2020 | Disapproved - NO FEE | RGROSS |
| Note: SAW EXPANSION CUTS NEEDED OVER THE LENGTH OF THE CULVERT AND ACROSS THE DRIVEWAY. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 02/07/2020 | APPROVED | RGROSS |
| ELECTRIC - EARLY POWER | 01/28/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 2:00 | |||
| GRAVITY SEWER TEST | 01/13/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| U - SEWER TIE IN | 01/13/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 01/09/2020 | APPROVED | RGROSS |
| Note: READY TO POUR | |||
| U - SEWER TIE IN | 01/06/2020 | CANCELLED BY APPLICANT | JGIBSON |
| GRAVITY SEWER TEST | 01/06/2020 | CANCELLED BY APPLICANT | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 12/09/2019 | APPROVED | JCOLASANTI |
| INSULATION | 11/22/2019 | APPROVED | JCOLASANTI |
| ALL ROUGH | 11/21/2019 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 11/20/2019 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1) and or FBC CHAPTER 25 SECTION P2503.5.1 BUILDING SEWER TESTING Must use water for testing plastic pipes. Testing with not less than 5-foot (3048mm) of head water and be able to maintain such pressure for 15 minutes.,,,,ALL METAL BOXES SHALL BE GROUNDED R,E 3905.2 AND NEC.314.4 (garage Lights) | |||
| ROOF VALLEY & METAL | 11/08/2019 | APPROVED | JCOLASANTI |
| ELECTRIC-TUG | 11/07/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 1:00 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/05/2019 | APPROVED | MWILLIAMS |
| TIE BEAM / LINTEL | 10/22/2019 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 10/21/2019 | APPROVED | JMUNSON |
| MONOLITHIC SLAB | 10/11/2019 | APPROVED - AS NOTED | WMILLER |
| Note: THIS IS A REINSPECTION DEFICIENCIES NOTED BY INSPECTOR JD PRIOR RESOLVED | |||
| MONOLITHIC SLAB | 10/10/2019 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION washout throughout footings, need 3" of cement coverage for steel FBC403.2.1 | |||
| MONOLITHIC SLAB | 10/09/2019 | Disapproved - NO FEE | FWILLIS |
| Note: THIS IS A REINSPECTION Heavy rain today, footer filled with water. | |||
| MONOLITHIC SLAB | 10/08/2019 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: THIS IS A REINSPECTION washout throughout footings, need 3" of cement coverage for steel FBC403.2.1 | |||
| MONOLITHIC SLAB | 10/04/2019 | Disapproved - NO FEE | JCOLASANTI |
| Note: need termite sticker or letter to state type of termite being used...need compaction test documentation sticker in box | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/02/2019 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 08/20/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 02/04/2020 | 02/07/2020 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 10/21/2019 | 10/21/2019 |
| Note: Released By: JMUNSON foundation | |||
| SW1 | COMPLETE | 06/20/2019 | 06/20/2019 |
| Note: Released By: JMUNSON | |||
| ZON | COMPLETE | 06/20/2019 | 06/20/2019 |
| Note: Released By: TDOAK | |||
| BLD | COMPLETE | 06/20/2019 | 06/27/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 06/20/2019 | 06/27/2019 |
| Note: Released By: JHINDMAN | |||
| ZON | HOLD | 06/05/2019 | 06/05/2019 |
| Note: Held By: ELENS 1. Site Plan: Provide driveway width and material. 2. Color Sheet: Provide paint manufacturer and correct LRVs for exterior and garage. 3. Site Plan: Correct length of C-1 and C-2 (lot width) | |||
| SWALE | COMPLETE | 06/04/2019 | 06/27/2019 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 06/03/2019 | 06/10/2019 |
| Note: Held By: JHINDMAN | |||
| CUSVC | COMPLETE | 06/03/2019 | 06/05/2019 |
| Note: Released By: AROSCOE | |||
| ELEC | COMPLETE | 06/03/2019 | 06/10/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 06/03/2019 | 06/04/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 06/03/2019 | 06/04/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 06/03/2019 | 06/10/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | HOLD | 06/03/2019 | 06/10/2019 |
| Note: Held By: JHINDMAN 1. Provide a plumbing riser signed by the plumbing contractor with their license number. 6th ed. FBC 107.1 | |||
| SW1 | HOLD | 06/03/2019 | 06/04/2019 |
| Note: Held By: JMUNSON need to provide finish floor elevation. ULDC Tech Manual Sec5 300 | |||
| UD1 | COMPLETE | 06/03/2019 | 06/10/2019 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 06/03/2019 | 06/05/2019 |
| Note: Held By: ELENS |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 02/24/2020 |
| REINSPECTION FEE | ¤40.00 | 02/24/2020 |
| REINSPECTION FEE | ¤40.00 | 02/18/2020 |
| REINSPECTION FEE | ¤40.00 | 02/18/2020 |
| REINSPECTION FEE | ¤40.00 | 02/18/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤564.00 | 07/12/2019 |
| SITE PLAN 20 | ¤20.00 | 07/12/2019 |
| SURCHARGE FS 533.721 | ¤12.92 | 07/12/2019 |
| SURCHARGE - FS 468.631 | ¤19.37 | 07/12/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/12/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 07/12/2019 |
| SEWER CREDIT | (¤850.00) | 07/12/2019 |
| SEWER INSPECTION | ¤25.00 | 07/12/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 07/12/2019 |
| WATER CREDIT | (¤60.00) | 07/12/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 07/12/2019 |
| 07/12/2019 | ||
| METER - DEPOSIT | ¤60.00 | 07/12/2019 |
| WATER- TURN ON | ¤25.00 | 07/12/2019 |
| ADMIN FEE | ¤20.00 | 07/12/2019 |
| CONNECTION FEES | ¤985.25 | 07/12/2019 |
| ELECTRIC FEE | ¤229.20 | 07/12/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 07/12/2019 |
| IMPACT FEE FIRE | ¤223.38 | 07/12/2019 |
| IMPACT FEE PARKS | ¤849.24 | 07/12/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/12/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 07/12/2019 |
| MECHANICAL FEE | ¤229.20 | 07/12/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/12/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 07/12/2019 |
| PLAN CHECK FEE | ¤112.80 | 07/12/2019 |
| PLUMBING FEE | ¤229.20 | 07/12/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,980.51 |