I want to search for...

Permit #2019060156

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-00260-0050
CONDITIONED SPACE: 2306 sqft
GARAGE: 466 sqft
OPENED PORCH (WITH ROOF) : 138 sqft
OPENED PORCH (WITH ROOF) : 32 sqft
Total Square Footage: 2942 sqft
Block: 00260
Subdivision: -
Job Phone: 407-307-4753
Location Address: 61 SEA TR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/12/2019
NOC: RECORDED
Applicant name: SHAWN VIRAG
Owner: BRITE PROPERTIES OF FLORIDA LLC

Address

7345 GREENBRIAR PKWY

ORLANDO, FL 32819

Lot: 0050
Contracted Stated Job Value: ¤148,359.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SHAWNTELLE CONSULTING AND DESIGN LLC
Status Location Address State License Number Phone
CANCEL

611 LARGOVISTA DR

OAKLAND, FL 34787

CBC1261160 (Exp: 08/31/2020) 407-307-4753

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853
THOMAS WALTER ALBANO
Status Location Address State License Number Phone Fax
INACTIVE

P. O. BOX 352075

Palm Coast, FL 32135

CFC045991 (Exp: 08/31/2024) 386-437-2795 (386)437-2781

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/18/2020 FINAL APPROVED FWILLIS
Note: THIS IS A REINSPECTION Toilet in bathroom behind kitchen fills with water, doesn't flush. Master bathroom water closet fan not working.
BLD - BUILDING FINAL 03/17/2020 Disapproved - NO FEE FWILLIS
Note: Toilet in bathroom behind kitchen fills with water, doesn't flush. Master bathroom water closet fan not working.
U -UTILITY RESIDENTIAL FINAL 03/16/2020 APPROVED AHALL
ROW - STORMWATER FINAL 03/13/2020 APPROVED MMAJEWSKI
Note: THIS IS A REINSPECTION
ROW - FINAL APRON (AFTER POUR) 03/13/2020 APPROVED MMAJEWSKI
ROW FIELD SURVEY /GRADING CERTIFICATION 03/05/2020 APPROVED MMAJEWSKI
ROW - STORMWATER FINAL 03/05/2020 Disapproved - NO FEE MMAJEWSKI
Note: EDGE OF PAVEMENT ALONG DRIVEWAY NEEDS TO BE FIXED DUMPSTER NEEDS TO BE REMOVED
FINAL SURVEY (OFFICE USE ONLY) 03/05/2020 APPROVED MMAJEWSKI
ELECTRIC - EARLY POWER 02/18/2020 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:00 am
ROW- PRE-APRON (PRE-POUR) 02/03/2020 APPROVED - AS NOTED MMAJEWSKI
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
U - SEWER TIE IN 01/27/2020 APPROVED - AS NOTED JGIBSON
Note: THIS WAS APPROVED ON 1/24/20
GRAVITY SEWER TEST 01/27/2020 APPROVED - AS NOTED JGIBSON
Note: THIS WAS APPROVED ON 1/24/20
PEP TANK INSTALLATION REQUEST 12/18/2019 APPROVED CSTONE
ELECTRIC-TUG 12/16/2019 APPROVED - AS NOTED RMARTIN
Note: RELEASED POWER TO FPL 8:50
LATH/BRICK/ WATER BARRIER 12/13/2019 APPROVED WMILLER
INSULATION 12/05/2019 APPROVED FWILLIS
ALL ROUGH 12/03/2019 APPROVED FWILLIS
ELECTRIC-TUG 11/15/2019 Disapproved -FEE REQUIRED RMARTIN
Note: UFER CONNECTION NEEDS TO BE ACCESSABLE NEC 250.68 A
ROOF VALLEY & METAL 11/13/2019 APPROVED JDELBONIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/07/2019 APPROVED FWILLIS
TIE BEAM / LINTEL 10/23/2019 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 10/21/2019 APPROVED JMUNSON
MONOLITHIC SLAB 10/15/2019 APPROVED JDELBONIS
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 10/14/2019 Disapproved - NO FEE FWILLIS
Note: 107.3.1 Approved documents must be kept on site for inspection. NO FOUNDATION PLAN ON SITE.
PLUMBING 1ST ROUGH UNDERGROUND 10/09/2019 APPROVED - AS NOTED JGIBSON
Note: THIS WAS LOOKED AT ON 10/9/19 AND APPROVED
WATER METER INSTALLATION REQUEST 08/20/2019 APPROVED CSTONE

Review History

Department Status Date In Date Out
SW1 COMPLETE 10/21/2019 10/21/2019
Note: Released By: JMUNSON foudnation
SW1 COMPLETE 10/18/2019 10/21/2019
Note: Released By: JMUNSON
PLUM COMPLETE 06/20/2019 06/27/2019
Note: Released By: JHINDMAN
SW1 COMPLETE 06/20/2019 06/20/2019
Note: Released By: JMUNSON
ZON COMPLETE 06/20/2019 06/20/2019
Note: Released By: TDOAK
SWALE COMPLETE 06/06/2019 06/25/2019
Note: Released By: TBAKER
BLD COMPLETE 06/05/2019 06/10/2019
Note: Released By: RLEE
CUSVC COMPLETE 06/05/2019 06/05/2019
Note: Released By: AROSCOE
ELEC COMPLETE 06/05/2019 06/10/2019
Note: Released By: RLEE
ENGIN1 COMPLETE 06/05/2019 06/06/2019
Note: Released By: TBAKER
LOCATE COMPLETE 06/05/2019 06/10/2019
Note: Released By: CSTONE
MECH COMPLETE 06/05/2019 06/10/2019
Note: Released By: RLEE
PLUM HOLD 06/05/2019 06/10/2019
Note: Held By: RLEE Name and signature of plumbing constactor for riser
SW1 HOLD 06/05/2019 06/05/2019
Note: Held By: JMUNSON 1. Remove drain field and septic. 2. Provide elevations for both sides of the house and front and back. ULDC Tech Manual Sec5 300
UD1 COMPLETE 06/05/2019 06/10/2019
Note: Released By: AHALL
ZON HOLD 06/05/2019 06/05/2019
Note: Held By: ELENS Provide driveway width and material on site plan.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 02/21/2020
REINSPECTION FEE ¤40.00 02/21/2020
NEW RESIDENTIAL INSPECTIONS ¤564.00 07/12/2019
SITE PLAN 20 ¤20.00 07/12/2019
SURCHARGE FS 533.721 ¤12.92 07/12/2019
SURCHARGE - FS 468.631 ¤19.37 07/12/2019
STORM WATER PERMIT FEES ¤80.00 07/12/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 07/12/2019
SEWER CREDIT (¤4,782.75) 07/12/2019
SEWER INSPECTION ¤25.00 07/12/2019
SEWER CAPITAL FACILITY ¤4,515.25 07/12/2019
WATER CAPITAL FACILITY FEE ¤3,314.84 07/12/2019
ELECTRIC FEE ¤229.20 07/12/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 07/12/2019
IMPACT FEE FIRE ¤223.38 07/12/2019
IMPACT FEE PARKS ¤849.24 07/12/2019
IMPACT FEE SCHOOL ¤3,600.00 07/12/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 07/12/2019
MECHANICAL FEE ¤229.20 07/12/2019
WATER -IRRIGATION INSPECTION ¤25.00 07/12/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 07/12/2019
PLAN CHECK FEE ¤112.80 07/12/2019
PLUMBING FEE ¤229.20 07/12/2019
METER - DEPOSIT ¤60.00 07/12/2019
WATER- TURN ON ¤25.00 07/12/2019
ADMIN FEE ¤20.00 07/12/2019
CONNECTION FEES ¤985.25 07/12/2019
Fees Total Due: ¤0.00 Total Paid: ¤11,987.76