I want to search for...
Permit #2019060590
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00090-0060 |
| CONDITIONED SPACE: 1767 sqft |
| GARAGE: 484 sqft |
| OPENED PORCH (WITH ROOF) : 156 sqft |
| OPENED PORCH (WITH ROOF) : 43 sqft |
| Total Square Footage: 2450 sqft |
| Block: 00090 |
| Subdivision: 2211 - SECTION 59-SEMINOLE PARK |
| Job Phone: 386-447-4151 |
| Location Address: 6 SEA SHARK PATH |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/08/2019 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: FLORIDA GREEN CONSTRUCTION INC |
|
Address 50 LEANNI WAY UNIT C1 PALM COAST, FL 32137 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
GREGG A MCANALLY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE PALM COAST, FL 32092 |
CAC1815760 (Exp: 08/31/2022) | 904-829-8898 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/08/2020 | FINAL APPROVED | WMILLER |
| U -UTILITY RESIDENTIAL FINAL | 02/21/2020 | APPROVED | AHALL |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 02/10/2020 | Disapproved - NO FEE | AHALL |
| Note: improper pep tank breaker in service panel 20amp dedicated non gfi breaker required. | |||
| ROW - STORMWATER FINAL | 02/07/2020 | APPROVED | MMAJEWSKI |
| ROW - FINAL APRON (AFTER POUR) | 02/07/2020 | APPROVED | MMAJEWSKI |
| SEWER SERVICE | 02/07/2020 | CANCELLED BY INSPECTOR | BBEMBRY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/05/2020 | APPROVED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/31/2020 | Disapproved - NO FEE | MMAJEWSKI |
| Note: THERE IS A LOW AEREA OFF THE RIGHT REAR CORNER OF THE HOUSE. ELEVATIONS DOWN THE SIDE OF THE YARD ARE HIGHER THAN THE LOW SPOT, WATER WILL NOT BE ABLE TO DRAIN | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/31/2020 | APPROVED | MMAJEWSKI |
| ELECTRIC - EARLY POWER | 01/29/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:00 am | |||
| ROW- PRE-APRON (PRE-POUR) | 01/02/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION. It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/30/2019 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION. CULVERT HAS WATER RUNNING CLEAR THROUGH IT AND ENDS ARE FULL. GROUND WAY TO SOFT TO POUR. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/23/2019 | Disapproved - NO FEE | MMAJEWSKI |
| U - SEWER TIE IN | 12/16/2019 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION DEFICIENCIES NOTED BY INSPECTOR MG PRIOR RESOLVED | |||
| GRAVITY SEWER TEST | 12/16/2019 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION DEFICIENCIES NOTED BY INSPECTOR MG PRIOR RESOLVED | |||
| GRAVITY SEWER TEST | 12/13/2019 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: P-2503.4 BUILDING SEWER TESTING TEST NOT HOLDING | |||
| U - SEWER TIE IN | 12/13/2019 | Disapproved - NO FEE | JGIBSON |
| Note: P-2503.4 TEST NOT HOLDING | |||
| PEP TANK INSTALLATION REQUEST | 11/12/2019 | APPROVED | CSTONE |
| Note: Once you request your pep tank we ask that you keep the site clear until the tank is in. You will have 72 hours after pep tank request has been approved to get the site ready. Site ready means area is clear without driveway, sod, paint, sidewalks, or irrigation in the way. If you have underground power where the pep tank will be located you will need to have that moved. | |||
| INSULATION | 10/30/2019 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 10/29/2019 | APPROVED | JDELBONIS |
| ALL ROUGH | 10/21/2019 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 10/18/2019 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: panel not phased out or tied in | |||
| ROOF VALLEY & METAL | 09/25/2019 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/20/2019 | APPROVED - AS NOTED | FWILLIS |
| Note: Could not see connections on top of 6X6 post. Open for viewing on the All Rough. | |||
| TIE BEAM / LINTEL | 09/09/2019 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 09/06/2019 | Disapproved - NO FEE | FWILLIS |
| Note: Dowel layout not matching these plans. Possibly wrong plans on site. Plans highlighted on page 4. | |||
| FOUND SURVEY APPROVED (OFFICE) | 09/05/2019 | APPROVED | JMUNSON |
| MONOLITHIC SLAB | 08/15/2019 | APPROVED | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/30/2019 | APPROVED | JGIBSON |
| ELECTRIC TEMP POLE | 07/24/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 3:50 | |||
| WATER METER INSTALLATION REQUEST | 07/12/2019 | APPROVED | CSTONE |
| Note: Daniel Wieland asked for this inspection |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 09/05/2019 | 09/05/2019 |
| Note: Released By: JMUNSON | |||
| SW1 | HOLD | 08/29/2019 | 08/29/2019 |
| Note: Held By: JMUNSON Foundation S Need to put FFE on Foundation Survey. | |||
| BLD | COMPLETE | 08/23/2019 | 08/31/2019 |
| Note: Released By: MGARRETT | |||
| BLD | COMPLETE | 08/12/2019 | 08/19/2019 |
| Note: Released By: MGARRETT | |||
| ENGIN1 | COMPLETE | 08/12/2019 | 08/13/2019 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 08/12/2019 | 08/13/2019 |
| Note: Released By: TDOAK | |||
| ZON | COMPLETE | 06/20/2019 | 06/20/2019 |
| Note: Released By: TDOAK | |||
| BLD | COMPLETE | 06/20/2019 | 06/27/2019 |
| Note: Released By: RLEE | |||
| SWALE | COMPLETE | 06/18/2019 | 07/11/2019 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 06/13/2019 | 06/18/2019 |
| Note: Held By: RLEE Footing detail minimum overall deppth does not match wall detail of minimum 20". Minimum depth below grade/compact soil to comply with FBCR 403.1.4 | |||
| CUSVC | COMPLETE | 06/13/2019 | 06/13/2019 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 06/13/2019 | 06/18/2019 |
| Note: Released By: RLEE | |||
| ENGIN1 | COMPLETE | 06/13/2019 | 06/18/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 06/13/2019 | 06/17/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 06/13/2019 | 06/17/2019 |
| Note: Released By: RLEE | |||
| PLUM | COMPLETE | 06/13/2019 | 06/18/2019 |
| Note: Released By: RLEE | |||
| SW1 | COMPLETE | 06/13/2019 | 06/13/2019 |
| Note: Released By: JMUNSON | |||
| UD1 | COMPLETE | 06/13/2019 | 06/18/2019 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 06/13/2019 | 06/13/2019 |
| Note: Held By: ELENS Identify sod type and whether irrigation will be provided on landscape plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 04/21/2020 |
| REINSPECTION FEE | ¤40.00 | 04/21/2020 |
| REINSPECTION FEE | ¤40.00 | 04/21/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤500.00 | 07/08/2019 |
| SITE PLAN 20 | ¤20.00 | 07/08/2019 |
| SURCHARGE FS 533.721 | ¤11.70 | 07/08/2019 |
| SURCHARGE - FS 468.631 | ¤17.55 | 07/08/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/08/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 07/08/2019 |
| SEWER CREDIT | (¤2,455.03) | 07/08/2019 |
| SEWER INSPECTION | ¤25.00 | 07/08/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 07/08/2019 |
| WATER CREDIT | (¤10.72) | 07/08/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 07/08/2019 |
| METER - DEPOSIT | ¤60.00 | 07/08/2019 |
| WATER- TURN ON | ¤25.00 | 07/08/2019 |
| ADMIN FEE | ¤20.00 | 07/08/2019 |
| CONNECTION FEES | ¤985.25 | 07/08/2019 |
| ELECTRIC FEE | ¤210.00 | 07/08/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 07/08/2019 |
| IMPACT FEE FIRE | ¤223.38 | 07/08/2019 |
| IMPACT FEE PARKS | ¤849.24 | 07/08/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/08/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 07/08/2019 |
| MECHANICAL FEE | ¤210.00 | 07/08/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/08/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 07/08/2019 |
| PLAN CHECK FEE | ¤100.00 | 07/08/2019 |
| PLUMBING FEE | ¤210.00 | 07/08/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,207.32 |