Permit #2019060675
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7026-00010-0310 |
| CONDITIONED SPACE: 2398 sqft |
| GARAGE: 760 sqft |
| OPENED PORCH (WITH ROOF) : 398 sqft |
| OPENED PORCH (WITH ROOF) : 84 sqft |
| Total Square Footage: 3640 sqft |
| Block: 00010 |
| Subdivision: 2153 - SECTION 26-PINE GROVE |
| Job Phone: (386)445-9393 |
| Location Address: 30 PINE HURST LN |
| Type: DU - DUPLEX |
| Issue Date: 07/19/2019 |
| NOC: RECORDED |
| Applicant name: ANTONIO JR AMARAL |
| Owner: AMARAL CUSTOM HOMES INC |
|
Address 13 UTILITY DR PALM COAST, FL 32137 |
| Lot: 0310 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
AMARAL HOMES & POOLS, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
13 Utility Drive PALM COAST, FL 32137 |
CBC058062 (Exp: 08/31/2026) | (386)445-9393 |
Sub Contractors
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
ANTONIO AMARAL JR
| Status | Location Address | State License Number |
| ACTIVE |
1370 PALM HARBOR PKWY PALM COAST, FL 32137 |
CCC058004 (Exp: 08/31/2026) |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/07/2020 | FINAL APPROVED | MMESSER |
| ROW - FINAL INSPECTION | 08/05/2020 | FINAL APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 08/05/2020 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 07/10/2020 | APPROVED - AS NOTED | KHOWELL |
| Note: SOD AND IS NOT ALLOWED TO COVER THE BOTTOM OF FENCES ON THE LEFT SIDE AND REAR, PER CITY TECHNICAL MANUAL 300.04 A B (6). REPAIR PRIOR TO CALLING IN ROW FINAL INSPECTION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/05/2020 | APPROVED | MMAJEWSKI |
| FINAL SURVEY (OFFICE USE ONLY) | 05/05/2020 | APPROVED | MMAJEWSKI |
| ELECTRIC - EARLY POWER | 04/01/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 11:15 | |||
| ROW- PRE-APRON (PRE-POUR) | 01/30/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION. IT IS THE BUILDER’S RESPONSIBILITY: TO RECHECK ELEVATIONS AND PIPE SIZE, TO INSURE THAT AN OBSTRUCTION DOES NOT EXIST UPSTREAM AND OR DOWNSTREAM, THAT THE CULVERT PIPE IS SET TO AND OR FOLLOWS THE SWALE PLAN, FORM THE DRIVEWAY TO THE APPROVEDSITE PLAN AND FOLLOW THE APPROVED DRIVEWAY DETAIL SHEET PROVIDED BY THE CITY OF PALM COAST. PRIOR TO PLACEMENT OF CONCRETE. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/29/2020 | Disapproved -FEE REQUIRED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION. NEED SITE PLAN FORM BOARD ON LEFT DRIVE ALONG EDGE OF PAVEMENT NEEDS TO BE FIXED MATERIAL NEEDS TO BE COMPACTED | |||
| ROW- PRE-APRON (PRE-POUR) | 01/27/2020 | CANCELLED BY APPLICANT | RGROSS |
| U - SEWER TIE IN | 01/21/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 01/21/2020 | APPROVED | JGIBSON |
| PEP TANK INSTALLATION REQUEST | 01/09/2020 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 12/10/2019 | APPROVED | JCOLASANTI |
| INSULATION | 12/05/2019 | APPROVED | JCOLASANTI |
| FIREWALL | 11/25/2019 | APPROVED | JDELBONIS |
| ALL ROUGH | 11/25/2019 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 11/22/2019 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: recessed lighting needs to be wired into boxes or housings | |||
| ROOF VALLEY & METAL | 11/22/2019 | APPROVED | JDELBONIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/05/2019 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/23/2019 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: THIS IS A REINSPECTION not braced acording to specks also missing second tie on dubble or tripple truses | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/22/2019 | CANCELLED BY APPLICANT | JDELBONIS |
| TIE BEAM / LINTEL | 10/01/2019 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 09/25/2019 | APPROVED | JMUNSON |
| MONOLITHIC SLAB | 09/17/2019 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 09/16/2019 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: 3 inc drain through front footer not sleved or has a reliving arch SLEEVES… PIPES PASSING THROUGH FOUNDATION WALLS P2603.4 SLEEVES… (SLEEVES MUST BE 2 PIPE SIZES GREATER THAN THE PIPE PASSING THROUGH THE WALL | |||
| LATH/BRICK/ WATER BARRIER | 09/13/2019 | CANCELLED BY INSPECTOR | JDELBONIS |
| Note: WRONG INSPECTION CALLED IN ALSO NEED TO SLEVE OR HAVE RELIVING ARCH ON DRAIN LINE THROUGH FRONT FOOTING | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/26/2019 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 07/30/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 09/25/2019 | 09/25/2019 |
| Note: Released By: JMUNSON Foundation Survey | |||
| ENGIN1 | COMPLETE | 07/23/2019 | 07/29/2019 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 07/23/2019 | 07/23/2019 |
| Note: Released By: JMUNSON | |||
| ZON | COMPLETE | 07/23/2019 | 07/23/2019 |
| Note: Released By: AMOBLEY | |||
| ZON | COMPLETE | 07/17/2019 | 07/18/2019 |
| Note: Released By: ELENS | |||
| ZON | HOLD | 06/19/2019 | 06/19/2019 |
| Note: Held By: ELENS Correct driveway width on site plan Provide foundation plantings between walkway and garage, wrapping corners. Correct legal description on survey | |||
| BLD | COMPLETE | 06/18/2019 | 06/25/2019 |
| Note: Released By: JHINDMAN | |||
| CUSVC | COMPLETE | 06/18/2019 | 06/18/2019 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 06/18/2019 | 06/25/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 06/18/2019 | 06/18/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 06/18/2019 | 06/19/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 06/18/2019 | 06/25/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 06/18/2019 | 06/25/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 06/18/2019 | 06/18/2019 |
| Note: Released By: JMUNSON | |||
| UD1 | COMPLETE | 06/18/2019 | 06/21/2019 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 06/18/2019 | 06/19/2019 |
| Note: Held By: ELENS Correct driveway width on site plan Provide foundation plantings between walkway and garage, wrapping corners. | |||
| SWALE | COMPLETE | 06/18/2019 | 07/23/2019 |
| Note: Released By: TBAKER |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 08/07/2020 |
| REINSPECTION FEE | ¤40.00 | 08/07/2020 |
| REINSPECTION FEE | ¤40.00 | 08/07/2020 |
| REINSPECTION FEE | ¤40.00 | 08/07/2020 |
| ¤0.00 | 08/07/2020 | |
| METER - DEPOSIT | ¤120.00 | 07/19/2019 |
| WATER- TURN ON | ¤50.00 | 07/19/2019 |
| ADMIN FEE | ¤20.00 | 07/19/2019 |
| CONNECTION FEES | (¤233.75) | 07/19/2019 |
| CONNECTION FEES | ¤1,970.50 | 07/19/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤634.00 | 07/19/2019 |
| SITE PLAN 20 | ¤20.00 | 07/19/2019 |
| SURCHARGE FS 533.721 | ¤14.25 | 07/19/2019 |
| SURCHARGE - FS 468.631 | ¤21.37 | 07/19/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/19/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤75.96) | 07/19/2019 |
| SEWER INSPECTION | (¤25.00) | 07/19/2019 |
| SEWER INSPECTION | ¤25.00 | 07/19/2019 |
| SEWER CAPITAL FACILITY | (¤1,390.00) | 07/19/2019 |
| SEWER CAPITAL FACILITY | ¤9,030.50 | 07/19/2019 |
| WATER CAPITAL FACILITY FEE | ¤6,629.68 | 07/19/2019 |
| WATER CAPITAL FACILITY FEE | (¤1,500.00) | 07/19/2019 |
| ELECTRIC FEE | ¤250.20 | 07/19/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤13.40) | 07/19/2019 |
| IMPACT FEE FIRE | ¤446.76 | 07/19/2019 |
| IMPACT FEE PARKS | ¤1,698.48 | 07/19/2019 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 07/19/2019 |
| IMPACT FEE TRANSPORTATION | ¤2,532.00 | 07/19/2019 |
| MECHANICAL FEE | ¤250.20 | 07/19/2019 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 07/19/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤50.95) | 07/19/2019 |
| PLAN CHECK FEE | ¤126.80 | 07/19/2019 |
| PLUMBING FEE | ¤250.20 | 07/19/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤28,290.88 |