Permit #2019060741

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-00090-0070
CONDITIONED SPACE: 1658 sqft
GARAGE: 528 sqft
OPENED PORCH (WITH ROOF) : 366 sqft
OPENED PORCH (WITH ROOF) : 72 sqft
Total Square Footage: 2624 sqft
Block: 00090
Subdivision: 2211 - SECTION 59-SEMINOLE PARK
Job Phone: 386-447-4151
Location Address: 4 SEA SHARK PATH
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/25/2019
NOC: RECORDED
Applicant name: GENE WARREN SLONE
Owner: MARY ELIZABETH MULLEN

Address

39 MILLAY PLACE

MILL VALLEY, CA 94941

Lot: 0070
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

FLORIDA GREEN CONSTRUCTION INC.
Status Location Address State License Number Phone
INACTIVE

870 E RETTA STREET

DELEON SPRINGS, FL 32130

CBC1260957 (Exp: 08/31/2026) 407-580-2657

Sub Contractors

JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
GREGG A MCANALLY
Status Location Address State License Number Phone
INACTIVE

3370 AGRICULTURAL CENTER DRIVE

PALM COAST, FL 32092

CAC1815760 (Exp: 08/31/2022) 904-829-8898
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/27/2020 FINAL APPROVED FWILLIS
Note: THIS IS A REINSPECTION Tapcon hold down missing from unit outside. 4 Required. Energy Calc. Missing.
U -UTILITY RESIDENTIAL FINAL 04/27/2020 APPROVED AHALL
Note: THIS IS A REINSPECTION procide power to pep panel from house panel
U -UTILITY RESIDENTIAL FINAL 04/24/2020 Disapproved - NO FEE AHALL
Note: procide power to pep panel from house panel
BLD - BUILDING FINAL 04/24/2020 Disapproved - NO FEE FWILLIS
Note: Tapcon hold down missing from unit outside. 4 Required. Energy Calc. Missing.
ROW - FINAL APRON (AFTER POUR) 04/23/2020 APPROVED MMAJEWSKI
ROW - STORMWATER FINAL 04/23/2020 APPROVED MMAJEWSKI
ROW FIELD SURVEY /GRADING CERTIFICATION 04/22/2020 APPROVED - AS NOTED MMAJEWSKI
Note: HIGH AREAS WERE DUG OUT. AFTER RAIN ON 4/20/2020 WATER WAS DRAINING PROPERLY
FINAL SURVEY (OFFICE USE ONLY) 04/22/2020 APPROVED MMAJEWSKI
Note: THIS IS A REINSPECTION
FINAL SURVEY (OFFICE USE ONLY) 04/16/2020 Disapproved - NO FEE MMAJEWSKI
Note: AFTER TODAYS RAINFALL 4/16/2020 WATER ON THE RIGHTSIDE OF THE LOT WAS STANDING AND NOT ABLE TO DRAIN. RIGHTSIDE IN THE FRONT THERE NEEDS TO BE MORE OF A SLOPE IN THE DRAINAGE CONVEYANCE. SEE MARKUPS
ELECTRIC - EARLY POWER 02/21/2020 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:15 am
ROW- PRE-APRON (PRE-POUR) 01/21/2020 APPROVED - AS NOTED MMAJEWSKI
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
U - SEWER TIE IN 01/10/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 01/10/2020 APPROVED JGIBSON
SEWER SERVICE 01/10/2020 CANCELLED BY INSPECTOR JGIBSON
Note: NOT NEEDED FOR RESIDETIAL
PEP TANK INSTALLATION REQUEST 12/18/2019 APPROVED CSTONE
PEP TANK INSTALLATION REQUEST 12/13/2019 CANCELLED BY APPLICANT WEB
GRAVITY SEWER TEST 12/13/2019 CANCELLED BY APPLICANT WEB
LATH/BRICK/ WATER BARRIER 12/09/2019 APPROVED FWILLIS
Note: THIS IS A REINSPECTION
LATH/BRICK/ WATER BARRIER 12/06/2019 Disapproved - NO FEE FWILLIS
Note: THIS IS A REINSPECTION Front two columns lacking fasteners as previous inspection.
LATH/BRICK/ WATER BARRIER 12/05/2019 Disapproved - NO FEE FWILLIS
Note: Front two columns not enough fastners or staples. R703.6.2 ASTM C 1063.7.10.2.1 Spaced not more than 7".
INSULATION 11/22/2019 APPROVED FWILLIS
ALL ROUGH 11/19/2019 APPROVED FWILLIS
ROOF VALLEY & METAL 10/22/2019 APPROVED MWILLIAMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/18/2019 APPROVED JDELBONIS
TIE BEAM / LINTEL 09/19/2019 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 08/29/2019 APPROVED JMUNSON
MONOLITHIC SLAB 08/06/2019 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 08/02/2019 Disapproved - NO FEE FWILLIS
Note: Dowels missing as marked on page #3 of the approved plans. Some areas have to many dowels. Relieving arch missing over pipe as marked on page #3 of approved plans. Remove dirt from footer before pouring.
PLUMBING 1ST ROUGH UNDERGROUND 07/30/2019 APPROVED JGIBSON
ELECTRIC TEMP POLE 07/24/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED POWER 3:50
WATER METER INSTALLATION REQUEST 07/12/2019 APPROVED CSTONE

Review History

Department Status Date In Date Out
SW1 COMPLETE 08/29/2019 08/29/2019
Note: Released By: JMUNSON Foundation S
ZON COMPLETE 06/25/2019 06/25/2019
Note: Released By: AMOBLEY
ZON HOLD 06/18/2019 06/18/2019
Note: Held By: ELENS Four (4) foundation plantings (shrubs) required on each side of house. (Missing two on the right.) Indicate sod type and whether irrigation will be provided on the landscape plan. Property is also affected by flood map ...0240E. Please add to survey notes.
SWALE COMPLETE 06/18/2019 07/11/2019
Note: Released By: TBAKER
BLD COMPLETE 06/17/2019 06/21/2019
Note: Released By: RLEE
CUSVC COMPLETE 06/17/2019 06/18/2019
Note: Released By: HHAND
ELEC COMPLETE 06/17/2019 06/21/2019
Note: Released By: RLEE
ENGIN1 COMPLETE 06/17/2019 06/18/2019
Note: Released By: TBAKER
LOCATE COMPLETE 06/17/2019 06/18/2019
Note: Released By: CSTONE
MECH COMPLETE 06/17/2019 06/21/2019
Note: Released By: RLEE
PLUM COMPLETE 06/17/2019 06/21/2019
Note: Released By: RLEE
SW1 COMPLETE 06/17/2019 06/18/2019
Note: Released By: JMUNSON
UD1 COMPLETE 06/17/2019 06/21/2019
Note: Released By: LFITZGERALD
ZON HOLD 06/17/2019 06/18/2019
Note: Held By: ELENS 4 foundation plantings (shrubs) required on each side of house. (Missing two on the right.)

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
METER - DEPOSIT ¤60.00 06/25/2019
WATER- TURN ON ¤25.00 06/25/2019
ADMIN FEE ¤20.00 06/25/2019
CONNECTION FEES ¤985.25 06/25/2019
ELECTRIC FEE ¤210.00 06/25/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 06/25/2019
IMPACT FEE FIRE ¤223.38 06/25/2019
IMPACT FEE PARKS ¤849.24 06/25/2019
IMPACT FEE SCHOOL ¤3,600.00 06/25/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 06/25/2019
MECHANICAL FEE ¤210.00 06/25/2019
WATER -IRRIGATION INSPECTION ¤25.00 06/25/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 06/25/2019
PLAN CHECK FEE ¤100.00 06/25/2019
PLUMBING FEE ¤210.00 06/25/2019
NEW RESIDENTIAL INSPECTIONS ¤500.00 06/25/2019
SITE PLAN 20 ¤20.00 06/25/2019
SURCHARGE FS 533.721 ¤11.70 06/25/2019
SURCHARGE - FS 468.631 ¤17.55 06/25/2019
STORM WATER PERMIT FEES ¤80.00 06/25/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 06/25/2019
SEWER CREDIT (¤1,147.00) 06/25/2019
SEWER INSPECTION ¤25.00 06/25/2019
SEWER CAPITAL FACILITY ¤4,515.25 06/25/2019
WATER CAPITAL FACILITY FEE ¤3,314.84 06/25/2019
Fees Total Due: ¤0.00 Total Paid: ¤15,406.07