I want to search for...
Permit #2019060741
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00090-0070 |
| CONDITIONED SPACE: 1658 sqft |
| GARAGE: 528 sqft |
| OPENED PORCH (WITH ROOF) : 366 sqft |
| OPENED PORCH (WITH ROOF) : 72 sqft |
| Total Square Footage: 2624 sqft |
| Block: 00090 |
| Subdivision: 2211 - SECTION 59-SEMINOLE PARK |
| Job Phone: 386-447-4151 |
| Location Address: 4 SEA SHARK PATH |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/25/2019 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: MARY ELIZABETH MULLEN |
|
Address 39 MILLAY PLACE MILL VALLEY, CA 94941 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
GREGG A MCANALLY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE PALM COAST, FL 32092 |
CAC1815760 (Exp: 08/31/2022) | 904-829-8898 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/27/2020 | FINAL APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Tapcon hold down missing from unit outside. 4 Required. Energy Calc. Missing. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/27/2020 | APPROVED | AHALL |
| Note: THIS IS A REINSPECTION procide power to pep panel from house panel | |||
| U -UTILITY RESIDENTIAL FINAL | 04/24/2020 | Disapproved - NO FEE | AHALL |
| Note: procide power to pep panel from house panel | |||
| BLD - BUILDING FINAL | 04/24/2020 | Disapproved - NO FEE | FWILLIS |
| Note: Tapcon hold down missing from unit outside. 4 Required. Energy Calc. Missing. | |||
| ROW - FINAL APRON (AFTER POUR) | 04/23/2020 | APPROVED | MMAJEWSKI |
| ROW - STORMWATER FINAL | 04/23/2020 | APPROVED | MMAJEWSKI |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/22/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: HIGH AREAS WERE DUG OUT. AFTER RAIN ON 4/20/2020 WATER WAS DRAINING PROPERLY | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/22/2020 | APPROVED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/16/2020 | Disapproved - NO FEE | MMAJEWSKI |
| Note: AFTER TODAYS RAINFALL 4/16/2020 WATER ON THE RIGHTSIDE OF THE LOT WAS STANDING AND NOT ABLE TO DRAIN. RIGHTSIDE IN THE FRONT THERE NEEDS TO BE MORE OF A SLOPE IN THE DRAINAGE CONVEYANCE. SEE MARKUPS | |||
| ELECTRIC - EARLY POWER | 02/21/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:15 am | |||
| ROW- PRE-APRON (PRE-POUR) | 01/21/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| U - SEWER TIE IN | 01/10/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 01/10/2020 | APPROVED | JGIBSON |
| SEWER SERVICE | 01/10/2020 | CANCELLED BY INSPECTOR | JGIBSON |
| Note: NOT NEEDED FOR RESIDETIAL | |||
| PEP TANK INSTALLATION REQUEST | 12/18/2019 | APPROVED | CSTONE |
| PEP TANK INSTALLATION REQUEST | 12/13/2019 | CANCELLED BY APPLICANT | WEB |
| GRAVITY SEWER TEST | 12/13/2019 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 12/09/2019 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 12/06/2019 | Disapproved - NO FEE | FWILLIS |
| Note: THIS IS A REINSPECTION Front two columns lacking fasteners as previous inspection. | |||
| LATH/BRICK/ WATER BARRIER | 12/05/2019 | Disapproved - NO FEE | FWILLIS |
| Note: Front two columns not enough fastners or staples. R703.6.2 ASTM C 1063.7.10.2.1 Spaced not more than 7". | |||
| INSULATION | 11/22/2019 | APPROVED | FWILLIS |
| ALL ROUGH | 11/19/2019 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 10/22/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/18/2019 | APPROVED | JDELBONIS |
| TIE BEAM / LINTEL | 09/19/2019 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 08/29/2019 | APPROVED | JMUNSON |
| MONOLITHIC SLAB | 08/06/2019 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 08/02/2019 | Disapproved - NO FEE | FWILLIS |
| Note: Dowels missing as marked on page #3 of the approved plans. Some areas have to many dowels. Relieving arch missing over pipe as marked on page #3 of approved plans. Remove dirt from footer before pouring. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/30/2019 | APPROVED | JGIBSON |
| ELECTRIC TEMP POLE | 07/24/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 3:50 | |||
| WATER METER INSTALLATION REQUEST | 07/12/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 08/29/2019 | 08/29/2019 |
| Note: Released By: JMUNSON Foundation S | |||
| ZON | COMPLETE | 06/25/2019 | 06/25/2019 |
| Note: Released By: AMOBLEY | |||
| ZON | HOLD | 06/18/2019 | 06/18/2019 |
| Note: Held By: ELENS Four (4) foundation plantings (shrubs) required on each side of house. (Missing two on the right.) Indicate sod type and whether irrigation will be provided on the landscape plan. Property is also affected by flood map ...0240E. Please add to survey notes. | |||
| SWALE | COMPLETE | 06/18/2019 | 07/11/2019 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 06/17/2019 | 06/21/2019 |
| Note: Released By: RLEE | |||
| CUSVC | COMPLETE | 06/17/2019 | 06/18/2019 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 06/17/2019 | 06/21/2019 |
| Note: Released By: RLEE | |||
| ENGIN1 | COMPLETE | 06/17/2019 | 06/18/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 06/17/2019 | 06/18/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 06/17/2019 | 06/21/2019 |
| Note: Released By: RLEE | |||
| PLUM | COMPLETE | 06/17/2019 | 06/21/2019 |
| Note: Released By: RLEE | |||
| SW1 | COMPLETE | 06/17/2019 | 06/18/2019 |
| Note: Released By: JMUNSON | |||
| UD1 | COMPLETE | 06/17/2019 | 06/21/2019 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 06/17/2019 | 06/18/2019 |
| Note: Held By: ELENS 4 foundation plantings (shrubs) required on each side of house. (Missing two on the right.) |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 06/25/2019 |
| WATER- TURN ON | ¤25.00 | 06/25/2019 |
| ADMIN FEE | ¤20.00 | 06/25/2019 |
| CONNECTION FEES | ¤985.25 | 06/25/2019 |
| ELECTRIC FEE | ¤210.00 | 06/25/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 06/25/2019 |
| IMPACT FEE FIRE | ¤223.38 | 06/25/2019 |
| IMPACT FEE PARKS | ¤849.24 | 06/25/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/25/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 06/25/2019 |
| MECHANICAL FEE | ¤210.00 | 06/25/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/25/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 06/25/2019 |
| PLAN CHECK FEE | ¤100.00 | 06/25/2019 |
| PLUMBING FEE | ¤210.00 | 06/25/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤500.00 | 06/25/2019 |
| SITE PLAN 20 | ¤20.00 | 06/25/2019 |
| SURCHARGE FS 533.721 | ¤11.70 | 06/25/2019 |
| SURCHARGE - FS 468.631 | ¤17.55 | 06/25/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/25/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 06/25/2019 |
| SEWER CREDIT | (¤1,147.00) | 06/25/2019 |
| SEWER INSPECTION | ¤25.00 | 06/25/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 06/25/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 06/25/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,406.07 |