I want to search for...
Permit #2019070144
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00660-0120 |
| CONDITIONED SPACE: 1983 sqft |
| GARAGE: 516 sqft |
| OPENED PORCH (WITH ROOF) : 106 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| Total Square Footage: 2653 sqft |
| Block: 00660 |
| Subdivision: - |
| Job Phone: 407-807-0656 |
| Location Address: 105 ULYSSES TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/31/2019 |
| NOC: RECORDED |
| Applicant name: NAVIN SUGRIM |
| Owner: BRITE PROPERTIES OF FLORIDA LLC |
|
Address 7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤135,076.00 |
| Job Description: SINGLE FAMILY RESIDENCE. |
| Type: CN |
Contractor
DLP BUILDERS LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
CBC1263567 (Exp: 08/31/2022) | 407-807-0656 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/07/2020 | FINAL APPROVED | FWILLIS |
| U -UTILITY RESIDENTIAL FINAL | 04/07/2020 | APPROVED | AHALL |
| ROW - STORMWATER FINAL | 04/06/2020 | APPROVED | MMAJEWSKI |
| ROW - FINAL APRON (AFTER POUR) | 04/06/2020 | APPROVED | MMAJEWSKI |
| FINAL SURVEY (OFFICE USE ONLY) | 04/02/2020 | APPROVED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/05/2020 | Disapproved - NO FEE | MMAJEWSKI |
| Note: DRAINAGE IN THE BACKYARD AND LEFT SIDE OF HOUSE IS BACK PITCHING SEE MARK UPS | |||
| ELECTRIC - EARLY POWER | 03/03/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 8:40 am | |||
| GRAVITY SEWER TEST | 02/13/2020 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 02/13/2020 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 02/05/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| LATH/BRICK/ WATER BARRIER | 12/23/2019 | APPROVED | FWILLIS |
| INSULATION | 12/20/2019 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 12/19/2019 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: Spraying insulation on ceiling through out, unable to do inspection. Insulation not completed. | |||
| ALL ROUGH | 12/17/2019 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 12/13/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. NEED ALL APPROVED PAPERWORK ON SITE FOR INSPECTION (NEED DUCT DRAWINGS AND ENERGY CALCS) 2NAIL PLATES ON ELECTRIC FBC E3802.1 (table), AND 3802.3.2 OR NEC 334.15 b. protection from physical damage. (AT UNDERGROUND FOR KITCHEN, BOTTOM PLATES KITCHEN WALL AND ISLAND BOTTOM PLATES) 3. NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE. AND (CONDENSATE LINES IN WALL AT GARAGE) | |||
| ELECTRIC-TUG | 12/05/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 10:30 | |||
| ROOF VALLEY & METAL | 12/03/2019 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/25/2019 | APPROVED | FWILLIS |
| TIE BEAM / LINTEL | 11/07/2019 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 11/01/2019 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 11/01/2019 | APPROVED | JMUNSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/29/2019 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/25/2019 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL (need the APPROVED AHRI on site at time of final) (SAME FOR 6TH EDITION) make shure you have a riser diagram on site | |||
| WATER METER INSTALLATION REQUEST | 09/09/2019 | APPROVED | CSTONE |
| ROW FIELD SURVEY /GRADING CERTIFICATION | APPROVED | MMAJEWSKI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 11/01/2019 | 11/01/2019 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 07/03/2019 | 07/09/2019 |
| Note: Released By: JHINDMAN | |||
| CUSVC | COMPLETE | 07/03/2019 | 07/03/2019 |
| Note: Released By: AROSCOE | |||
| ELEC | COMPLETE | 07/03/2019 | 07/09/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 07/03/2019 | 07/03/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 07/03/2019 | 07/08/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 07/03/2019 | 07/09/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 07/03/2019 | 07/09/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 07/03/2019 | 07/03/2019 |
| Note: Released By: JMUNSON | |||
| UD1 | COMPLETE | 07/03/2019 | 07/09/2019 |
| Note: Released By: AHALL | |||
| ZON | COMPLETE | 07/03/2019 | 07/03/2019 |
| Note: Released By: ELENS | |||
| SWALE | COMPLETE | 07/03/2019 | 08/01/2019 |
| Note: Released By: TBAKER |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 04/13/2020 |
| REINSPECTION FEE | ¤40.00 | 02/21/2020 |
| REINSPECTION FEE | ¤40.00 | 02/21/2020 |
| REINSPECTION FEE | ¤40.00 | 02/21/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤494.00 | 07/31/2019 |
| SITE PLAN 20 | ¤20.00 | 07/31/2019 |
| SURCHARGE FS 533.721 | ¤11.59 | 07/31/2019 |
| SURCHARGE - FS 468.631 | ¤17.38 | 07/31/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/31/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 07/31/2019 |
| SEWER CREDIT | (¤850.00) | 07/31/2019 |
| SEWER INSPECTION | ¤25.00 | 07/31/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 07/31/2019 |
| WATER CREDIT | (¤60.00) | 07/31/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 07/31/2019 |
| ELECTRIC FEE | ¤208.20 | 07/31/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 07/31/2019 |
| IMPACT FEE FIRE | ¤223.38 | 07/31/2019 |
| IMPACT FEE PARKS | ¤849.24 | 07/31/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/31/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 07/31/2019 |
| MECHANICAL FEE | ¤208.20 | 07/31/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/31/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 07/31/2019 |
| PLAN CHECK FEE | ¤98.80 | 07/31/2019 |
| PLUMBING FEE | ¤208.20 | 07/31/2019 |
| METER - DEPOSIT | ¤60.00 | 07/31/2019 |
| WATER- TURN ON | ¤25.00 | 07/31/2019 |
| ADMIN FEE | ¤20.00 | 07/31/2019 |
| CONNECTION FEES | ¤985.25 | 07/31/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,790.19 |