Permit #2019070160
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00200-0020 |
| CONDITIONED SPACE: 1983 sqft |
| GARAGE: 516 sqft |
| OPENED PORCH (WITH ROOF) : 106 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| Total Square Footage: 2653 sqft |
| Block: 00200 |
| Subdivision: 2155 - SECTION 32-ROYAL PALMS |
| Job Phone: 407-307-4753 |
| Location Address: 125 ROLLING SANDS DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/31/2019 |
| NOC: RECORDED |
| Applicant name: SHAWN VIRAG |
| Owner: BRITE PROPERTIES OF FLORDA LLC |
|
Address 7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤135,076.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SHAWNTELLE CONSULTING AND DESIGN LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
611 LARGOVISTA DR OAKLAND, FL 34787 |
CBC1261160 (Exp: 08/31/2020) | 407-307-4753 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/17/2020 | FINAL APPROVED | FWILLIS |
| U -UTILITY RESIDENTIAL FINAL | 03/17/2020 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 03/16/2020 | APPROVED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 03/13/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: PIPE ENDS NEED TO BE CLEANED OUT | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/13/2020 | APPROVED | MMAJEWSKI |
| ROW - STORMWATER FINAL | 03/13/2020 | Disapproved - NO FEE | MMAJEWSKI |
| Note: GARBAGE IN SWALE NEEDS TO BE CLEANED UP AND THE SWALE REPAIRED | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/13/2020 | APPROVED | MMAJEWSKI |
| ELECTRIC - EARLY POWER | 03/11/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 10:00 am | |||
| ROW- PRE-APRON (PRE-POUR) | 02/25/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| LATH/BRICK/ WATER BARRIER | 02/05/2020 | APPROVED | FWILLIS |
| GRAVITY SEWER TEST | 01/22/2020 | APPROVED | JGIBSON |
| SEWER SERVICE | 01/22/2020 | CANCELLED BY INSPECTOR | JGIBSON |
| Note: NOT NEEDED FOR RESIDENTIAL | |||
| U - SEWER TIE IN | 01/22/2020 | APPROVED | JGIBSON |
| PEP TANK INSTALLATION REQUEST | 01/03/2020 | CANCELLED BY INSPECTOR | CSTONE |
| Note: Gravity section no pep tank needed | |||
| INSULATION | 12/30/2019 | APPROVED | FWILLIS |
| INSULATION | 12/27/2019 | CANCELLED BY APPLICANT | WEB |
| ALL ROUGH | 12/23/2019 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 12/20/2019 | CANCELLED BY APPLICANT | JDELBONIS |
| ROOF VALLEY & METAL | 12/12/2019 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/09/2019 | APPROVED | FWILLIS |
| ELECTRIC-TUG | 12/05/2019 | APPROVED - AS NOTED | RMARTIN |
| TIE BEAM / LINTEL | 11/22/2019 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 11/20/2019 | APPROVED | CTROHA |
| MONOLITHIC SLAB | 11/13/2019 | APPROVED | JDELBONIS |
| MONOLITHIC SLAB | 11/08/2019 | CANCELLED BY APPLICANT | WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/01/2019 | FINAL APPROVED | FWILLIS |
| WATER METER INSTALLATION REQUEST | 09/16/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 11/20/2019 | 11/20/2019 |
| Note: Released By: CTROHA | |||
| BLD | COMPLETE | 07/03/2019 | 07/09/2019 |
| Note: Released By: JHINDMAN | |||
| CUSVC | COMPLETE | 07/03/2019 | 07/03/2019 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 07/03/2019 | 07/09/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 07/03/2019 | 07/03/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 07/03/2019 | 07/10/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 07/03/2019 | 07/09/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 07/03/2019 | 07/09/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 07/03/2019 | 07/08/2019 |
| Note: Released By: JMUNSON | |||
| UD1 | COMPLETE | 07/03/2019 | 07/11/2019 |
| Note: Released By: AHALL | |||
| ZON | COMPLETE | 07/03/2019 | 07/08/2019 |
| Note: Released By: ELENS | |||
| SWALE | COMPLETE | 07/03/2019 | 08/01/2019 |
| Note: Released By: TBAKER |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 07/31/2019 |
| WATER- TURN ON | ¤25.00 | 07/31/2019 |
| ADMIN FEE | ¤20.00 | 07/31/2019 |
| CONNECTION FEES | ¤985.25 | 07/31/2019 |
| ELECTRIC FEE | ¤208.20 | 07/31/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 07/31/2019 |
| IMPACT FEE FIRE | ¤223.38 | 07/31/2019 |
| IMPACT FEE PARKS | ¤849.24 | 07/31/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/31/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 07/31/2019 |
| MECHANICAL FEE | ¤208.20 | 07/31/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/31/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 07/31/2019 |
| PLAN CHECK FEE | ¤98.80 | 07/31/2019 |
| PLUMBING FEE | ¤208.20 | 07/31/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤494.00 | 07/31/2019 |
| SITE PLAN 20 | ¤20.00 | 07/31/2019 |
| SURCHARGE FS 533.721 | ¤11.59 | 07/31/2019 |
| SURCHARGE - FS 468.631 | ¤17.38 | 07/31/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/31/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 07/31/2019 |
| SEWER INSPECTION | ¤25.00 | 07/31/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 07/31/2019 |
| SEWER CAPITAL FACILITY | (¤1,147.00) | 07/31/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 07/31/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,393.19 |