Permit #2019070654

Permit Details

Status: FINAL

Parcel Id: 06-12-31-5825-00000-0220
Block: 00000
Subdivision: 2111 - TOWN CENTER PHASE II
Location Address: 1465 CENTRAL AVE
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 07/22/2019
NOC: Unknown
Applicant name: WILLIAM SCOTT CULP
Owner: CENTRAL LANDINGS PARTNERS LTD & CENTRAL LANDINGS 8

Address

335 N KNOWLES AVE STE 101

WINTER PARK, FL 32789

Lot: 0220
Job Description: SITE WORK - MULTI FAMILY APARTMENTS
Type: CN

Contractor

WPGC CONSTRUCTIONI, LLC
Status Location Address Mailing Address State License Number
CANCEL

200 EAST CANTON AVE

,

STE 102

WINTER PARK, FL 32789

CGC1524369 (Exp: 08/31/2022)

Inspection History

Type Request Date Result Inspector
UC-FINAL SITE INSPECTION 05/29/2020 APPROVED AHALL
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION this inspection covers stage 2 bldgs 5 and 11
ROW - FINAL INSPECTION 05/29/2020 APPROVED - AS NOTED AHALL
Note: THIS IS A REINSPECTION job trailer and fence to be removed by Wed 03 June 2020 and location cleaned up.
ROW - FINAL INSPECTION 05/28/2020 CANCELLED BY APPLICANT AHALL
U - UTILITY COMMERCIAL FINAL 05/28/2020 APPROVED AHALL
UC-FINAL SITE INSPECTION 05/28/2020 CANCELLED BY APPLICANT AHALL
Note: THIS IS A REINSPECTION this inspection covers stage 2 bldgs 5 and 11
IRRIGATION AFFIDAVIT 05/28/2020 CANCELLED BY INSPECTOR DRAMIREZ
Note: THIS IS A REINSPECTION ADDED ON 4/15/2020 4:45:17 PM
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 05/28/2020 APPROVED BDAWSON
LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) 05/27/2020 CANCELLED BY INSPECTOR BDAWSON
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Provide landscape screening on 3 sides for FPL power boxes East side of building 2 2. Install reclaim water signage. 3. Install trees plants sod and mulch at rotary. 4. Install plants mulch and sod west side of building 2. 5.Replace 2 dead schilling shrubs east side of building 10. 6. Install 4 iris shrubs as discussed.
IRRIGATION AFFIDAVIT 05/27/2020 APPROVED BDAWSON
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY 05/27/2020 APPROVED AHALL
Note: Final Stage as-builts include all paving and grading for the site. This is under application #4372.
UC- ASPHALT TEMP 05/27/2020 APPROVED AHALL
MAINT BOND ACCEPTANCE (OFFICE) 05/27/2020 APPROVED DRAMIREZ
Note: Bond approved under application #4368.
LDSC- LANDSCAPE FINAL 05/27/2020 APPROVED AHALL
Note: THIS IS A REINSPECTION ADDED ON 5/22/2020 7:55:40 PM - Replace all plants that are dead/dying - Replace (1) podo that is dying/cut back on cornaer of transformer box - Trim shrub that is damaged @ a/c behind building 1000 - Screen transformer along rear public pathway (labeled 14417,14418,14419) - In rear of longest building screen a/cs that are unscreended on opposite side of walkway - Mow grass - Clean up debris in landscape areas - Remulch all bare areas - Clean up debris from pond - Sod any bare areas along pathway in rear - All mech equipment visible to public from Central and rear pathway should be screened with 30" ht material minimum - replace any undersized shrubs - Replace two Junipers in front of longest building
U-WATER MAIN DISINFECTION 05/27/2020 APPROVED AHALL
U-WATER MAIN DISINFECTION SAMPLING 05/27/2020 APPROVED AHALL
UC - PROJECT STATUS 05/27/2020 APPROVED AHALL
UC-CONSTRUCTION ENTRANCE 05/27/2020 APPROVED AHALL
UC-MOT MAINTENANCE OF TRAFFIC 05/27/2020 APPROVED AHALL
UC-ASPHALT PRE PLACEMENT 05/27/2020 APPROVED AHALL
U-WATER METER INSTALLATION/VERIFICATION 05/27/2020 APPROVED AHALL
ROW- PROJECT STATUS 05/27/2020 APPROVED AHALL
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 05/27/2020 APPROVED AHALL
Note: THIS IS A REINSPECTION stage 2 bldgs 5 and 11
UROW-RETENT/DETENT STABILI 05/27/2020 APPROVED AHALL
Note: THIS IS A REINSPECTION
UC-TRAF - MAINT OF TRAFFIC 05/27/2020 APPROVED AHALL
Note: THIS IS A REINSPECTION stage 2 bldgs 5 and 11
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 05/27/2020 APPROVED AHALL
Note: THIS IS A REINSPECTION stage 2 bldgs 5 and 11
UROW -FINAL GRADE PRIOR SOD 05/27/2020 APPROVED AHALL
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION center carriage bldgs 8 9 10 Bldg-2
UROW - FINAL DRAINAGE 05/27/2020 APPROVED AHALL
Note: THIS IS A REINSPECTION stage 2 bldgs 5 and 11
UC-SUBSTANTIAL WALK-THRU 05/26/2020 APPROVED - AS NOTED AHALL
Note: THIS IS A REINSPECTION this inspection covers stage 2 final 26May approved pending completion of Punch list.
LDSC-TREE BARRICADE 05/22/2020 CANCELLED BY INSPECTOR BDAWSON
LDSC-PRE-PLANTING TREE QUALITY 05/22/2020 CANCELLED BY INSPECTOR BDAWSON
LDSC- LANDSCAPE FINAL 05/22/2020 Disapproved -FEE REQUIRED BDAWSON
Note: - Replace all plants that are dead/dying - Replace (1) podo that is dying/cut back on cornaer of transformer box - Trim shrub that is damaged @ a/c behind building 1000 - Screen transformer along rear public pathway (labeled 14417,14418,14419) - In rear of longest building screen a/cs that are unscreended on opposite side of walkway - Mow grass - Clean up debris in landscape areas - Remulch all bare areas - Clean up debris from pond - Sod any bare areas along pathway in rear - All mech equipment visible to public from Central and rear pathway should be screened with 30" ht material minimum - replace any undersized shrubs - Replace two Junipers in front of longest building
LDSC- LANDSCAPE FINAL 05/20/2020 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Phase 3 approved bldgs 3 4 6 7 approved pending final walk thru and minor punch list items 20may2020 pending final walk thru with Beth
LDSC- LANDSCAPE FINAL 05/18/2020 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Phase 3 approved bldgs 3 4 6 7 approved pending final walk thru and minor punch list items
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY 05/18/2020 APPROVED AHALL
Note: AS-BUILTS APPROVED UNDER 4372 FOR STAGES 6 & 7 - BLDGS 3, 4, 6 AND 7
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY 04/30/2020 APPROVED AHALL
Note: As-built for stage 3 was approved under application #4357. STAGE 3 / FOR BLDGS 2, 8, 9 AND 10
LDSC- LANDSCAPE FINAL 04/28/2020 PARTIALLY APPROVED MBACON
Note: THIS IS A REINSPECTION Phase 3 approved
LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) 04/23/2020 PARTIALLY APPROVED MBACON
Note: THIS IS A REINSPECTION 1. Provide landscape screening on 3 sides for FPL power boxes East side of building 2 2. Install reclaim water signage. 3. Install trees plants sod and mulch at rotary. 4. Install plants mulch and sod west side of building 2. 5.Replace 2 dead schilling shrubs east side of building 10. 6. Install 4 iris shrubs as discussed.
UROW -FINAL GRADE PRIOR SOD 04/17/2020 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION center carriage bldgs 8 9 10 Bldg-2
IRRIGATION AFFIDAVIT 04/15/2020 PARTIALLY APPROVED BDAWSON
Note: PHASE 2
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 04/15/2020 APPROVED MBACON
LDSC- LANDSCAPE FINAL 04/15/2020 PARTIALLY APPROVED MBACON
LDSC-IRRIGATION FINAL 04/14/2020 CANCELLED BY INSPECTOR BDAWSON
Note: no inspection required - LA provide affidavit of inspection.
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY 04/09/2020 APPROVED AHALL
Note: As-builts for stage 2 of construction were approved under application number 4336. STAGE 2 / FOR BLDGS 5 & 11
UROW -FINAL GRADE PRIOR SOD 04/01/2020 PARTIALLY APPROVED AHALL
Note: center carriage bldgs 8 9 10
UROW - FINAL DRAINAGE 03/24/2020 PARTIALLY APPROVED AHALL
Note: stage 2 bldgs 5 and 11
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 03/24/2020 PARTIALLY APPROVED AHALL
Note: stage 2 bldgs 5 and 11
UC-TRAF - MAINT OF TRAFFIC 03/24/2020 PARTIALLY APPROVED AHALL
Note: stage 2 bldgs 5 and 11
UROW-RETENT/DETENT STABILI 03/24/2020 PARTIALLY APPROVED AHALL
Note: stage 2 bldgs 5 and 11
UROW -FINAL GRADE PRIOR SOD 03/24/2020 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION stage 2 bldgs 5 and 11
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 03/24/2020 PARTIALLY APPROVED AHALL
Note: stage 2 bldgs 5 and 11
LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) 03/24/2020 PARTIALLY APPROVED MBACON
Note: Replace 3 river birch trees east side of building#5. Add mulch to areas as required per plan. Rake back mulch from trees/shrubs around base. Install 4 missing sweet bay magnolia's behind building#5. Screen FPL transformers as discussed. Also screen fire back flow in front of buildings.
UC-SUBSTANTIAL WALK-THRU 03/20/2020 PARTIALLY APPROVED AHALL
Note: this inspection covers stage 2
UC-FINAL SITE INSPECTION 03/20/2020 PARTIALLY APPROVED AHALL
Note: this inspection covers stage 2 bldgs 5 and 11
UROW -FINAL GRADE PRIOR SOD 03/17/2020 PARTIALLY APPROVED MBACON
U - SEWER TIE IN 03/17/2020 APPROVED JGIBSON
U - UTILITY COMMERCIAL FINAL 02/27/2020 PARTIALLY APPROVED AHALL
Note: Stage 1 approval complete.
UC-FINAL SITE INSPECTION 02/27/2020 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION approved for stage 1
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY 02/27/2020 APPROVED AHALL
Note: As-builts for the 1st stage approved under application # 4297. STAGE 1 / AS-BUILTS FOR BLDG 1 AND CLUB HOUSE
UC-ASPHALT PRE PLACEMENT 02/27/2020 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION approved for areas behind bldg 1 north to bldg 5, west to mail kiosk and south to bldgs 2 and 3
LDSC- LANDSCAPE FINAL 02/26/2020 PARTIALLY APPROVED BDAWSON
Note: Phase I approved.
UC-FINAL SITE INSPECTION 02/26/2020 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION stage 1 complete
UROW -FINAL GRADE PRIOR SOD 02/26/2020 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION stage 1 and bldg 11 complete
IRRIGATION AFFIDAVIT 02/21/2020 PARTIALLY APPROVED BDAWSON
Note: Phase I affidavit provided
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 02/21/2020 PARTIALLY APPROVED BDAWSON
Note: THIS IS A REINSPECTION Phase I as-builts are approved.
UC- PRELIMINARY AS-BUILTS 02/19/2020 APPROVED - AS NOTED AHALL
Note: call out the backflow/meter for the clubhouse on utlility as-built
UC-FINAL SITE INSPECTION 02/14/2020 PARTIALLY APPROVED AHALL
Note: approved for stage 1 completion
UC-DRAINAGE PIPE PLACEMENT/LAMPING 02/14/2020 APPROVED AHALL
Note: THIS IS A REINSPECTION
ROW -TURBIDITY BARRER 02/14/2020 APPROVED AHALL
Note: THIS IS A REINSPECTION
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 02/14/2020 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION for stage 1 completion
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 02/14/2020 PARTIALLY APPROVED AHALL
Note: approved for stage 1 completion
UROW - FINAL DRAINAGE 02/14/2020 PARTIALLY APPROVED AHALL
Note: approved for stage 1
U-GRAVITY SEWER INSTALL/TESTING 02/14/2020 APPROVED AHALL
Note: THIS IS A REINSPECTION
UC-DRAINAGE STRUCT PLACMNT 02/14/2020 APPROVED AHALL
Note: THIS IS A REINSPECTION
UC-CONSTRUCTION ENTRANCE 02/14/2020 PARTIALLY APPROVED AHALL
Note: approved for east entrance stage 1 completion
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 02/14/2020 APPROVED AHALL
Note: THIS IS A REINSPECTION
U-WATER SERVICE INSTALLATION 02/14/2020 APPROVED AHALL
Note: THIS IS A REINSPECTION
UROW - FINAL DRAINAGE 02/13/2020 CANCELLED BY APPLICANT WEB
U-WATER METER INSTALLATION/VERIFICATION 02/13/2020 PARTIALLY APPROVED AHALL
Note: Approved pending City utility verification Wed 19 Feb2020
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 02/12/2020 APPROVED FWILLIS
Note: STAGE #1 AREA
BLD- ADA PARKING 02/12/2020 APPROVED FWILLIS
Note: STAGE #1 AREA
LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) 02/10/2020 PARTIALLY APPROVED BDAWSON
Note: Phase 1 Substantial Complete Inspection - Mulch all landscape beds - Establish all tree watering dams - Install all sod areas including disturbed banks of pond - Clean up all hardscape areas of dirt/debris - Install 4 missing pots with associated plantings and pavers at building entry - Install 2 missing CAQ - Add medium screen hedge around backflow - Add missing LMB in front planting bed - Move 1 QN that is too close to mechanical equipment and close up whole of medium screen shrub. Update location on as-built. Replace 1 shrub in this area that is not 30" ht. - Provide medium screen plantings around FPL transformer - Plant 2 mising ICB at area of missing sidewalk
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 02/10/2020 CANCELLED BY APPLICANT BDAWSON
UC-ASPHALT PRE PLACEMENT 02/06/2020 PARTIALLY APPROVED MBACON
Note: THIS IS A REINSPECTION
LDSC-PRE-PLANTING TREE QUALITY 02/05/2020 PARTIALLY APPROVED BDAWSON
Note: Phase 1 - Preplanting tree quality approved for phase 1 of development.
UROW -FINAL GRADE PRIOR SOD 02/03/2020 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-clubhouse and building 1 now ready for sod
UROW -FINAL GRADE PRIOR SOD 01/30/2020 PARTIALLY APPROVED AHALL
Note: dog park area only
UC-DRAINAGE PIPE PLACEMENT/LAMPING 01/07/2020 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION 07Jan 2019 roof drain installation start bldg-1
UC-ASPHALT PRE PLACEMENT 11/15/2019 CANCELLED BY APPLICANT AHALL
Note: THIS IS A REINSPECTION rained out
UC-ASPHALT PRE PLACEMENT 11/12/2019 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION center section of site 1st lift
UC-ASPHALT PRE PLACEMENT 10/29/2019 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION 2nd se tion of 3 first lift
U-WATER SERVICE INSTALLATION 10/29/2019 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION potable line at building 3
UC-DRAINAGE STRUCT PLACMNT 10/29/2019 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION ongoing insp
UC-ASPHALT PRE PLACEMENT 10/15/2019 PARTIALLY APPROVED AHALL
Note: phase 1 east end bldg 1 carriage buildings and bldg 4 first lift heavy
U-WATER SERVICE INSTALLATION 10/02/2019 PARTIALLY APPROVED AHALL
Note: fire and potable lines continue to be installed
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 10/02/2019 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION pipe installation continues
PROJECT CLOSE OUT MEETING (386-986-3750) 09/24/2019 APPROVED AHALL
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 09/23/2019 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION potable water main installation continues
UC-DRAINAGE STRUCT PLACMNT 09/23/2019 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION storm installation continues on west side of project
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 09/18/2019 PARTIALLY APPROVED AHALL
Note: potable pipe start, first inspection
U-GRAVITY SEWER INSTALL/TESTING 09/10/2019 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION Ongoing work
UC-DRAINAGE STRUCT PLACMNT 09/10/2019 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION ongoing work
U-GRAVITY SEWER INSTALL/TESTING 08/29/2019 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION on going inspection
UC-DRAINAGE STRUCT PLACMNT 08/28/2019 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION
UC-DRAINAGE PIPE PLACEMENT/LAMPING 08/28/2019 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION
UC-DRAINAGE PIPE PLACEMENT/LAMPING 08/26/2019 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION ongoing inspection and work
U - SEWER TIE IN 08/14/2019 CANCELLED BY APPLICANT MBACON
U-GRAVITY SEWER INSTALL/TESTING 08/14/2019 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION ongoing inspection
U-GRAVITY SEWER INSTALL/TESTING 08/12/2019 PARTIALLY APPROVED AHALL
Note: install start today, ongoing inspection.
UC-DRAINAGE STRUCT PLACMNT 08/07/2019 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION
LDSC-TREE BARRICADE 08/07/2019 Disapproved -FEE REQUIRED BDAWSON
Note: - Restore damaged tree barricade at western most entry. - The recently added tree barricades should be installed per city standard detail. Contact City Landscape architect - Beth Dawson at 386-986-3760 for any clarification needed.
UC-DRAINAGE PIPE PLACEMENT/LAMPING 08/07/2019 PARTIALLY APPROVED AHALL
Note: THIS IS A REINSPECTION
ROW -TURBIDITY BARRER 08/07/2019 PARTIALLY APPROVED AHALL
Note: continud inspections
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 08/07/2019 PARTIALLY APPROVED AHALL
Note: continued inspections
UC-DRAINAGE STRUCT PLACMNT 08/02/2019 PARTIALLY APPROVED AHALL
Note: ongoing
UC-DRAINAGE PIPE PLACEMENT/LAMPING 08/02/2019 PARTIALLY APPROVED AHALL
PLAN - PRE-CON 386-986-3750 07/23/2019 APPROVED AHALL

Review History

Department Status Date In Date Out
UD1 COMPLETE 07/19/2019 07/19/2019
Note: Released By: CJOHNSON
BLD COMPLETE 07/17/2019 07/19/2019
Note: Released By: JHINDMAN
ENGIN1 COMPLETE 07/17/2019 07/22/2019
Note: Released By: CMORALES
PLLA COMPLETE 07/17/2019 07/17/2019
Note: Released By: BDAWSON
UD1 HOLD 07/17/2019 07/18/2019
Note: Held By: CJOHNSON FDEP permits shall be complete prior to issunace of the CSD permit

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 05/28/2020
REINSPECTION FEE ¤40.00 02/19/2020
SITE PLAN 20 ¤20.00 07/22/2019
INSPECTION 40 ¤1,480.00 07/22/2019
PERMIT FEE ¤125.00 07/22/2019
Fees Total Due: ¤0.00 Total Paid: ¤1,705.00