Permit #2019070654
Permit Details
Status: FINAL
| Parcel Id: 06-12-31-5825-00000-0220 |
| Block: 00000 |
| Subdivision: 2111 - TOWN CENTER PHASE II |
| Location Address: 1465 CENTRAL AVE |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 07/22/2019 |
| NOC: Unknown |
| Applicant name: WILLIAM SCOTT CULP |
| Owner: CENTRAL LANDINGS PARTNERS LTD & CENTRAL LANDINGS 8 |
|
Address 335 N KNOWLES AVE STE 101 WINTER PARK, FL 32789 |
| Lot: 0220 |
| Job Description: SITE WORK - MULTI FAMILY APARTMENTS |
| Type: CN |
Contractor
WPGC CONSTRUCTIONI, LLC
| Status | Location Address | Mailing Address | State License Number |
| CANCEL |
200 EAST CANTON AVE , |
STE 102 WINTER PARK, FL 32789 |
CGC1524369 (Exp: 08/31/2022) |
Inspection History
| Type | Request Date | Result | Inspector |
| UC-FINAL SITE INSPECTION | 05/29/2020 | APPROVED | AHALL |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION this inspection covers stage 2 bldgs 5 and 11 | |||
| ROW - FINAL INSPECTION | 05/29/2020 | APPROVED - AS NOTED | AHALL |
| Note: THIS IS A REINSPECTION job trailer and fence to be removed by Wed 03 June 2020 and location cleaned up. | |||
| ROW - FINAL INSPECTION | 05/28/2020 | CANCELLED BY APPLICANT | AHALL |
| U - UTILITY COMMERCIAL FINAL | 05/28/2020 | APPROVED | AHALL |
| UC-FINAL SITE INSPECTION | 05/28/2020 | CANCELLED BY APPLICANT | AHALL |
| Note: THIS IS A REINSPECTION this inspection covers stage 2 bldgs 5 and 11 | |||
| IRRIGATION AFFIDAVIT | 05/28/2020 | CANCELLED BY INSPECTOR | DRAMIREZ |
| Note: THIS IS A REINSPECTION ADDED ON 4/15/2020 4:45:17 PM | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 05/28/2020 | APPROVED | BDAWSON |
| LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) | 05/27/2020 | CANCELLED BY INSPECTOR | BDAWSON |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Provide landscape screening on 3 sides for FPL power boxes East side of building 2 2. Install reclaim water signage. 3. Install trees plants sod and mulch at rotary. 4. Install plants mulch and sod west side of building 2. 5.Replace 2 dead schilling shrubs east side of building 10. 6. Install 4 iris shrubs as discussed. | |||
| IRRIGATION AFFIDAVIT | 05/27/2020 | APPROVED | BDAWSON |
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | 05/27/2020 | APPROVED | AHALL |
| Note: Final Stage as-builts include all paving and grading for the site. This is under application #4372. | |||
| UC- ASPHALT TEMP | 05/27/2020 | APPROVED | AHALL |
| MAINT BOND ACCEPTANCE (OFFICE) | 05/27/2020 | APPROVED | DRAMIREZ |
| Note: Bond approved under application #4368. | |||
| LDSC- LANDSCAPE FINAL | 05/27/2020 | APPROVED | AHALL |
| Note: THIS IS A REINSPECTION ADDED ON 5/22/2020 7:55:40 PM - Replace all plants that are dead/dying - Replace (1) podo that is dying/cut back on cornaer of transformer box - Trim shrub that is damaged @ a/c behind building 1000 - Screen transformer along rear public pathway (labeled 14417,14418,14419) - In rear of longest building screen a/cs that are unscreended on opposite side of walkway - Mow grass - Clean up debris in landscape areas - Remulch all bare areas - Clean up debris from pond - Sod any bare areas along pathway in rear - All mech equipment visible to public from Central and rear pathway should be screened with 30" ht material minimum - replace any undersized shrubs - Replace two Junipers in front of longest building | |||
| U-WATER MAIN DISINFECTION | 05/27/2020 | APPROVED | AHALL |
| U-WATER MAIN DISINFECTION SAMPLING | 05/27/2020 | APPROVED | AHALL |
| UC - PROJECT STATUS | 05/27/2020 | APPROVED | AHALL |
| UC-CONSTRUCTION ENTRANCE | 05/27/2020 | APPROVED | AHALL |
| UC-MOT MAINTENANCE OF TRAFFIC | 05/27/2020 | APPROVED | AHALL |
| UC-ASPHALT PRE PLACEMENT | 05/27/2020 | APPROVED | AHALL |
| U-WATER METER INSTALLATION/VERIFICATION | 05/27/2020 | APPROVED | AHALL |
| ROW- PROJECT STATUS | 05/27/2020 | APPROVED | AHALL |
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 05/27/2020 | APPROVED | AHALL |
| Note: THIS IS A REINSPECTION stage 2 bldgs 5 and 11 | |||
| UROW-RETENT/DETENT STABILI | 05/27/2020 | APPROVED | AHALL |
| Note: THIS IS A REINSPECTION | |||
| UC-TRAF - MAINT OF TRAFFIC | 05/27/2020 | APPROVED | AHALL |
| Note: THIS IS A REINSPECTION stage 2 bldgs 5 and 11 | |||
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 05/27/2020 | APPROVED | AHALL |
| Note: THIS IS A REINSPECTION stage 2 bldgs 5 and 11 | |||
| UROW -FINAL GRADE PRIOR SOD | 05/27/2020 | APPROVED | AHALL |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION center carriage bldgs 8 9 10 Bldg-2 | |||
| UROW - FINAL DRAINAGE | 05/27/2020 | APPROVED | AHALL |
| Note: THIS IS A REINSPECTION stage 2 bldgs 5 and 11 | |||
| UC-SUBSTANTIAL WALK-THRU | 05/26/2020 | APPROVED - AS NOTED | AHALL |
| Note: THIS IS A REINSPECTION this inspection covers stage 2 final 26May approved pending completion of Punch list. | |||
| LDSC-TREE BARRICADE | 05/22/2020 | CANCELLED BY INSPECTOR | BDAWSON |
| LDSC-PRE-PLANTING TREE QUALITY | 05/22/2020 | CANCELLED BY INSPECTOR | BDAWSON |
| LDSC- LANDSCAPE FINAL | 05/22/2020 | Disapproved -FEE REQUIRED | BDAWSON |
| Note: - Replace all plants that are dead/dying - Replace (1) podo that is dying/cut back on cornaer of transformer box - Trim shrub that is damaged @ a/c behind building 1000 - Screen transformer along rear public pathway (labeled 14417,14418,14419) - In rear of longest building screen a/cs that are unscreended on opposite side of walkway - Mow grass - Clean up debris in landscape areas - Remulch all bare areas - Clean up debris from pond - Sod any bare areas along pathway in rear - All mech equipment visible to public from Central and rear pathway should be screened with 30" ht material minimum - replace any undersized shrubs - Replace two Junipers in front of longest building | |||
| LDSC- LANDSCAPE FINAL | 05/20/2020 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Phase 3 approved bldgs 3 4 6 7 approved pending final walk thru and minor punch list items 20may2020 pending final walk thru with Beth | |||
| LDSC- LANDSCAPE FINAL | 05/18/2020 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Phase 3 approved bldgs 3 4 6 7 approved pending final walk thru and minor punch list items | |||
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | 05/18/2020 | APPROVED | AHALL |
| Note: AS-BUILTS APPROVED UNDER 4372 FOR STAGES 6 & 7 - BLDGS 3, 4, 6 AND 7 | |||
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | 04/30/2020 | APPROVED | AHALL |
| Note: As-built for stage 3 was approved under application #4357. STAGE 3 / FOR BLDGS 2, 8, 9 AND 10 | |||
| LDSC- LANDSCAPE FINAL | 04/28/2020 | PARTIALLY APPROVED | MBACON |
| Note: THIS IS A REINSPECTION Phase 3 approved | |||
| LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) | 04/23/2020 | PARTIALLY APPROVED | MBACON |
| Note: THIS IS A REINSPECTION 1. Provide landscape screening on 3 sides for FPL power boxes East side of building 2 2. Install reclaim water signage. 3. Install trees plants sod and mulch at rotary. 4. Install plants mulch and sod west side of building 2. 5.Replace 2 dead schilling shrubs east side of building 10. 6. Install 4 iris shrubs as discussed. | |||
| UROW -FINAL GRADE PRIOR SOD | 04/17/2020 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION center carriage bldgs 8 9 10 Bldg-2 | |||
| IRRIGATION AFFIDAVIT | 04/15/2020 | PARTIALLY APPROVED | BDAWSON |
| Note: PHASE 2 | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 04/15/2020 | APPROVED | MBACON |
| LDSC- LANDSCAPE FINAL | 04/15/2020 | PARTIALLY APPROVED | MBACON |
| LDSC-IRRIGATION FINAL | 04/14/2020 | CANCELLED BY INSPECTOR | BDAWSON |
| Note: no inspection required - LA provide affidavit of inspection. | |||
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | 04/09/2020 | APPROVED | AHALL |
| Note: As-builts for stage 2 of construction were approved under application number 4336. STAGE 2 / FOR BLDGS 5 & 11 | |||
| UROW -FINAL GRADE PRIOR SOD | 04/01/2020 | PARTIALLY APPROVED | AHALL |
| Note: center carriage bldgs 8 9 10 | |||
| UROW - FINAL DRAINAGE | 03/24/2020 | PARTIALLY APPROVED | AHALL |
| Note: stage 2 bldgs 5 and 11 | |||
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 03/24/2020 | PARTIALLY APPROVED | AHALL |
| Note: stage 2 bldgs 5 and 11 | |||
| UC-TRAF - MAINT OF TRAFFIC | 03/24/2020 | PARTIALLY APPROVED | AHALL |
| Note: stage 2 bldgs 5 and 11 | |||
| UROW-RETENT/DETENT STABILI | 03/24/2020 | PARTIALLY APPROVED | AHALL |
| Note: stage 2 bldgs 5 and 11 | |||
| UROW -FINAL GRADE PRIOR SOD | 03/24/2020 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION stage 2 bldgs 5 and 11 | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 03/24/2020 | PARTIALLY APPROVED | AHALL |
| Note: stage 2 bldgs 5 and 11 | |||
| LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) | 03/24/2020 | PARTIALLY APPROVED | MBACON |
| Note: Replace 3 river birch trees east side of building#5. Add mulch to areas as required per plan. Rake back mulch from trees/shrubs around base. Install 4 missing sweet bay magnolia's behind building#5. Screen FPL transformers as discussed. Also screen fire back flow in front of buildings. | |||
| UC-SUBSTANTIAL WALK-THRU | 03/20/2020 | PARTIALLY APPROVED | AHALL |
| Note: this inspection covers stage 2 | |||
| UC-FINAL SITE INSPECTION | 03/20/2020 | PARTIALLY APPROVED | AHALL |
| Note: this inspection covers stage 2 bldgs 5 and 11 | |||
| UROW -FINAL GRADE PRIOR SOD | 03/17/2020 | PARTIALLY APPROVED | MBACON |
| U - SEWER TIE IN | 03/17/2020 | APPROVED | JGIBSON |
| U - UTILITY COMMERCIAL FINAL | 02/27/2020 | PARTIALLY APPROVED | AHALL |
| Note: Stage 1 approval complete. | |||
| UC-FINAL SITE INSPECTION | 02/27/2020 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION approved for stage 1 | |||
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | 02/27/2020 | APPROVED | AHALL |
| Note: As-builts for the 1st stage approved under application # 4297. STAGE 1 / AS-BUILTS FOR BLDG 1 AND CLUB HOUSE | |||
| UC-ASPHALT PRE PLACEMENT | 02/27/2020 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION approved for areas behind bldg 1 north to bldg 5, west to mail kiosk and south to bldgs 2 and 3 | |||
| LDSC- LANDSCAPE FINAL | 02/26/2020 | PARTIALLY APPROVED | BDAWSON |
| Note: Phase I approved. | |||
| UC-FINAL SITE INSPECTION | 02/26/2020 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION stage 1 complete | |||
| UROW -FINAL GRADE PRIOR SOD | 02/26/2020 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION stage 1 and bldg 11 complete | |||
| IRRIGATION AFFIDAVIT | 02/21/2020 | PARTIALLY APPROVED | BDAWSON |
| Note: Phase I affidavit provided | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 02/21/2020 | PARTIALLY APPROVED | BDAWSON |
| Note: THIS IS A REINSPECTION Phase I as-builts are approved. | |||
| UC- PRELIMINARY AS-BUILTS | 02/19/2020 | APPROVED - AS NOTED | AHALL |
| Note: call out the backflow/meter for the clubhouse on utlility as-built | |||
| UC-FINAL SITE INSPECTION | 02/14/2020 | PARTIALLY APPROVED | AHALL |
| Note: approved for stage 1 completion | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 02/14/2020 | APPROVED | AHALL |
| Note: THIS IS A REINSPECTION | |||
| ROW -TURBIDITY BARRER | 02/14/2020 | APPROVED | AHALL |
| Note: THIS IS A REINSPECTION | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 02/14/2020 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION for stage 1 completion | |||
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 02/14/2020 | PARTIALLY APPROVED | AHALL |
| Note: approved for stage 1 completion | |||
| UROW - FINAL DRAINAGE | 02/14/2020 | PARTIALLY APPROVED | AHALL |
| Note: approved for stage 1 | |||
| U-GRAVITY SEWER INSTALL/TESTING | 02/14/2020 | APPROVED | AHALL |
| Note: THIS IS A REINSPECTION | |||
| UC-DRAINAGE STRUCT PLACMNT | 02/14/2020 | APPROVED | AHALL |
| Note: THIS IS A REINSPECTION | |||
| UC-CONSTRUCTION ENTRANCE | 02/14/2020 | PARTIALLY APPROVED | AHALL |
| Note: approved for east entrance stage 1 completion | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 02/14/2020 | APPROVED | AHALL |
| Note: THIS IS A REINSPECTION | |||
| U-WATER SERVICE INSTALLATION | 02/14/2020 | APPROVED | AHALL |
| Note: THIS IS A REINSPECTION | |||
| UROW - FINAL DRAINAGE | 02/13/2020 | CANCELLED BY APPLICANT | WEB |
| U-WATER METER INSTALLATION/VERIFICATION | 02/13/2020 | PARTIALLY APPROVED | AHALL |
| Note: Approved pending City utility verification Wed 19 Feb2020 | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 02/12/2020 | APPROVED | FWILLIS |
| Note: STAGE #1 AREA | |||
| BLD- ADA PARKING | 02/12/2020 | APPROVED | FWILLIS |
| Note: STAGE #1 AREA | |||
| LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) | 02/10/2020 | PARTIALLY APPROVED | BDAWSON |
| Note: Phase 1 Substantial Complete Inspection - Mulch all landscape beds - Establish all tree watering dams - Install all sod areas including disturbed banks of pond - Clean up all hardscape areas of dirt/debris - Install 4 missing pots with associated plantings and pavers at building entry - Install 2 missing CAQ - Add medium screen hedge around backflow - Add missing LMB in front planting bed - Move 1 QN that is too close to mechanical equipment and close up whole of medium screen shrub. Update location on as-built. Replace 1 shrub in this area that is not 30" ht. - Provide medium screen plantings around FPL transformer - Plant 2 mising ICB at area of missing sidewalk | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 02/10/2020 | CANCELLED BY APPLICANT | BDAWSON |
| UC-ASPHALT PRE PLACEMENT | 02/06/2020 | PARTIALLY APPROVED | MBACON |
| Note: THIS IS A REINSPECTION | |||
| LDSC-PRE-PLANTING TREE QUALITY | 02/05/2020 | PARTIALLY APPROVED | BDAWSON |
| Note: Phase 1 - Preplanting tree quality approved for phase 1 of development. | |||
| UROW -FINAL GRADE PRIOR SOD | 02/03/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION-clubhouse and building 1 now ready for sod | |||
| UROW -FINAL GRADE PRIOR SOD | 01/30/2020 | PARTIALLY APPROVED | AHALL |
| Note: dog park area only | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 01/07/2020 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION 07Jan 2019 roof drain installation start bldg-1 | |||
| UC-ASPHALT PRE PLACEMENT | 11/15/2019 | CANCELLED BY APPLICANT | AHALL |
| Note: THIS IS A REINSPECTION rained out | |||
| UC-ASPHALT PRE PLACEMENT | 11/12/2019 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION center section of site 1st lift | |||
| UC-ASPHALT PRE PLACEMENT | 10/29/2019 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION 2nd se tion of 3 first lift | |||
| U-WATER SERVICE INSTALLATION | 10/29/2019 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION potable line at building 3 | |||
| UC-DRAINAGE STRUCT PLACMNT | 10/29/2019 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION ongoing insp | |||
| UC-ASPHALT PRE PLACEMENT | 10/15/2019 | PARTIALLY APPROVED | AHALL |
| Note: phase 1 east end bldg 1 carriage buildings and bldg 4 first lift heavy | |||
| U-WATER SERVICE INSTALLATION | 10/02/2019 | PARTIALLY APPROVED | AHALL |
| Note: fire and potable lines continue to be installed | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 10/02/2019 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION pipe installation continues | |||
| PROJECT CLOSE OUT MEETING (386-986-3750) | 09/24/2019 | APPROVED | AHALL |
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 09/23/2019 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION potable water main installation continues | |||
| UC-DRAINAGE STRUCT PLACMNT | 09/23/2019 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION storm installation continues on west side of project | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 09/18/2019 | PARTIALLY APPROVED | AHALL |
| Note: potable pipe start, first inspection | |||
| U-GRAVITY SEWER INSTALL/TESTING | 09/10/2019 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION Ongoing work | |||
| UC-DRAINAGE STRUCT PLACMNT | 09/10/2019 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION ongoing work | |||
| U-GRAVITY SEWER INSTALL/TESTING | 08/29/2019 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION on going inspection | |||
| UC-DRAINAGE STRUCT PLACMNT | 08/28/2019 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 08/28/2019 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 08/26/2019 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION ongoing inspection and work | |||
| U - SEWER TIE IN | 08/14/2019 | CANCELLED BY APPLICANT | MBACON |
| U-GRAVITY SEWER INSTALL/TESTING | 08/14/2019 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION ongoing inspection | |||
| U-GRAVITY SEWER INSTALL/TESTING | 08/12/2019 | PARTIALLY APPROVED | AHALL |
| Note: install start today, ongoing inspection. | |||
| UC-DRAINAGE STRUCT PLACMNT | 08/07/2019 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION | |||
| LDSC-TREE BARRICADE | 08/07/2019 | Disapproved -FEE REQUIRED | BDAWSON |
| Note: - Restore damaged tree barricade at western most entry. - The recently added tree barricades should be installed per city standard detail. Contact City Landscape architect - Beth Dawson at 386-986-3760 for any clarification needed. | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 08/07/2019 | PARTIALLY APPROVED | AHALL |
| Note: THIS IS A REINSPECTION | |||
| ROW -TURBIDITY BARRER | 08/07/2019 | PARTIALLY APPROVED | AHALL |
| Note: continud inspections | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 08/07/2019 | PARTIALLY APPROVED | AHALL |
| Note: continued inspections | |||
| UC-DRAINAGE STRUCT PLACMNT | 08/02/2019 | PARTIALLY APPROVED | AHALL |
| Note: ongoing | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 08/02/2019 | PARTIALLY APPROVED | AHALL |
| PLAN - PRE-CON 386-986-3750 | 07/23/2019 | APPROVED | AHALL |
Review History
| Department | Status | Date In | Date Out |
| UD1 | COMPLETE | 07/19/2019 | 07/19/2019 |
| Note: Released By: CJOHNSON | |||
| BLD | COMPLETE | 07/17/2019 | 07/19/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 07/17/2019 | 07/22/2019 |
| Note: Released By: CMORALES | |||
| PLLA | COMPLETE | 07/17/2019 | 07/17/2019 |
| Note: Released By: BDAWSON | |||
| UD1 | HOLD | 07/17/2019 | 07/18/2019 |
| Note: Held By: CJOHNSON FDEP permits shall be complete prior to issunace of the CSD permit |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 05/28/2020 |
| REINSPECTION FEE | ¤40.00 | 02/19/2020 |
| SITE PLAN 20 | ¤20.00 | 07/22/2019 |
| INSPECTION 40 | ¤1,480.00 | 07/22/2019 |
| PERMIT FEE | ¤125.00 | 07/22/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,705.00 |