Permit #2019080520

Permit Details

Status: COED

Parcel Id: 07-11-31-7035-00650-0130
CONDITIONED SPACE: 1767 sqft
GARAGE: 484 sqft
OPENED PORCH (WITH ROOF) : 43 sqft
OPENED PORCH (WITH ROOF) : 269 sqft
Total Square Footage: 2563 sqft
Block: 00650
Subdivision: 2172 - SECTION 35-BELLE TERRE
Job Phone: 386-447-4151
Location Address: 59 BURROUGHS DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/22/2019
NOC: RECORDED
Applicant name: GENE WARREN SLONE
Owner: FLORIDA GREEN CONSTRUCTION INC

Address

50 LEANNI WAY STE C1

PALM COAST, FL 32137

Lot: 0130
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

FLORIDA GREEN CONSTRUCTION INC.
Status Location Address State License Number Phone
INACTIVE

870 E RETTA STREET

DELEON SPRINGS, FL 32130

CBC1260957 (Exp: 08/31/2026) 407-580-2657

Sub Contractors

JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
GREGG A MCANALLY
Status Location Address State License Number Phone
INACTIVE

3370 AGRICULTURAL CENTER DRIVE

PALM COAST, FL 32092

CAC1815760 (Exp: 08/31/2022) 904-829-8898
JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/22/2020 FINAL APPROVED JCOLASANTI
U -UTILITY RESIDENTIAL FINAL 05/29/2020 APPROVED AHALL
ROW - DRAINAGE 05/28/2020 APPROVED MMAJEWSKI
Note: THIS IS A REINSPECTION
ROW - STORMWATER FINAL 05/28/2020 APPROVED MMAJEWSKI
ROW - FINAL APRON (AFTER POUR) 05/28/2020 APPROVED MMAJEWSKI
ROW FIELD SURVEY /GRADING CERTIFICATION 05/26/2020 APPROVED MMAJEWSKI
FINAL SURVEY (OFFICE USE ONLY) 05/26/2020 APPROVED MMAJEWSKI
ELECTRIC - EARLY POWER 03/31/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 11:20
ROW- PRE-APRON (PRE-POUR) 03/25/2020 APPROVED RGROSS
Note: READY TO POUR
U - SEWER TIE IN 03/10/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 03/10/2020 APPROVED JGIBSON
PEP TANK INSTALLATION REQUEST 02/19/2020 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 02/11/2020 APPROVED JCOLASANTI
INSULATION 02/06/2020 APPROVED JCOLASANTI
ALL ROUGH 01/29/2020 APPROVED - AS NOTED JCOLASANTI
Note: smoke det needs to be at least 3' horizontaly for bathroom with tub or shower FBC 314,,, need nail plate above electrical panel at ceiling
ROOF VALLEY & METAL 12/17/2019 APPROVED JCOLASANTI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/11/2019 APPROVED - AS NOTED JCOLASANTI
Note: need collar ties each rafter at rear garage per plan...strap rafter to bottom truss rear left porch (marked on plans) will check at all rough
TIE BEAM / LINTEL 11/15/2019 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 11/14/2019 CANCELLED BY APPLICANT JCOLASANTI
Note: THIS IS A REINSPECTION per phne call
ROW - DRAINAGE 11/14/2019 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION. SWALE IN FRONT OF THE NEW HOME CONSTRUCTION NEEDS A ROUGH REGRADE OR TEMPORARY CULVERT TO ALLOW FOR DRAINAGE. SPOKE TO JOB SITE CONTACT. NEXT INSPECTION 11/21/19
TIE BEAM / LINTEL 11/12/2019 Disapproved -FEE REQUIRED JCOLASANTI
Note: need dowels left wall at change nof height cells FBC 301.1.2 continous load path
FOUND SURVEY APPROVED (OFFICE) 11/07/2019 APPROVED JMUNSON
ROW - DRAINAGE 11/07/2019 Disapproved -FEE REQUIRED RGROSS
Note: SILT FENCE NEEDED. COMPLAINTS FROM NEIGHBORS PER SHELLEY FROM CODE. NO CULVERT OR REGRADE PERFORMED TO ALLOW FOR OPEN DRAINAGE ACROSS THE SITE. NEXT INSPECTION 11.14.19.
MONOLITHIC SLAB 10/25/2019 APPROVED WMILLER
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 10/23/2019 Disapproved -FEE REQUIRED WMILLER
Note: need compation report PER APPROVED PLANS FBC. [A] 107.3.1
PLUMBING 1ST ROUGH UNDERGROUND 10/14/2019 APPROVED JGIBSON
ELECTRIC TEMP POLE 09/23/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO FPL RELEASED POWER 3:40
WATER METER INSTALLATION REQUEST 09/19/2019 APPROVED CSTONE

Review History

Department Status Date In Date Out
SW1 COMPLETE 11/06/2019 11/07/2019
Note: Released By: JMUNSON
BLD COMPLETE 08/14/2019 08/22/2019
Note: Released By: MGARRETT
CUSVC COMPLETE 08/14/2019 08/15/2019
Note: Released By: HHAND
ELEC COMPLETE 08/14/2019 08/16/2019
Note: Released By: JMUNSON
ENGIN1 COMPLETE 08/14/2019 08/14/2019
Note: Released By: TBAKER
LOCATE COMPLETE 08/14/2019 08/21/2019
Note: Released By: CSTONE
MECH COMPLETE 08/14/2019 08/22/2019
Note: Released By: MGARRETT
PLUM COMPLETE 08/14/2019 08/22/2019
Note: Released By: MGARRETT
SW1 COMPLETE 08/14/2019 08/14/2019
Note: Released By: JMUNSON
UD1 COMPLETE 08/14/2019 08/21/2019
Note: Released By: LFITZGERALD PEP Tank areas new home This is a PEP Tank area. The panel and pep tank is to be placed on the same side of the building based on the Utility Marked Locations. Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits, sewer clean caps or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON COMPLETE 08/14/2019 08/14/2019
Note: Released By: AMOBLEY
SWALE COMPLETE 08/14/2019 09/06/2019
Note: Released By: TBAKER

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 05/28/2020
REINSPECTION FEE ¤40.00 05/28/2020
REINSPECTION FEE ¤40.00 05/28/2020
REINSPECTION FEE ¤40.00 05/28/2020
NEW RESIDENTIAL INSPECTIONS ¤500.00 08/22/2019
SITE PLAN 20 ¤20.00 08/22/2019
SURCHARGE FS 533.721 ¤11.70 08/22/2019
SURCHARGE - FS 468.631 ¤17.55 08/22/2019
STORM WATER PERMIT FEES ¤80.00 08/22/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 08/22/2019
SEWER CREDIT (¤850.00) 08/22/2019
SEWER INSPECTION ¤25.00 08/22/2019
SEWER CAPITAL FACILITY ¤4,515.25 08/22/2019
WATER CAPITAL FACILITY FEE ¤3,314.84 08/22/2019
METER - DEPOSIT ¤60.00 08/22/2019
WATER- TURN ON ¤25.00 08/22/2019
ADMIN FEE ¤20.00 08/22/2019
CONNECTION FEES ¤985.25 08/22/2019
ELECTRIC FEE ¤210.00 08/22/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 08/22/2019
IMPACT FEE FIRE ¤223.38 08/22/2019
IMPACT FEE PARKS ¤849.24 08/22/2019
IMPACT FEE SCHOOL ¤3,600.00 08/22/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 08/22/2019
MECHANICAL FEE ¤210.00 08/22/2019
WATER -IRRIGATION INSPECTION ¤25.00 08/22/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 08/22/2019
PLAN CHECK FEE ¤100.00 08/22/2019
PLUMBING FEE ¤210.00 08/22/2019
Fees Total Due: ¤0.00 Total Paid: ¤15,863.07