I want to search for...

Permit #2019080806

Permit Details

Status: COED

Parcel Id: 07-11-31-7004-00240-0160
CONDITIONED SPACE: 2331 sqft
GARAGE: 610 sqft
OPENED PORCH (WITH ROOF) : 96 sqft
OPENED PORCH (WITH ROOF) : 176 sqft
Total Square Footage: 3213 sqft
Block: 00240
Subdivision: 2203 - SECTION 4-COUNTRY CLUB COVE
Job Phone: (386) 672-8285
Location Address: 45 COOL WATER CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/17/2019
NOC: RECORDED
Applicant name: JOSEPH TODD VANACORE
Owner: GUILER, JEFFERY S & DONNA M

Address

11635 FALLING LEAF TRAIL

JACKSONVILLE, FL 32258

Lot: 0160
Contracted Stated Job Value: ¤229,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

VANACORE CONSTRUCTION INC.
Status Location Address Mailing Address State License Number Phone
INACTIVE

1451 N US HIGHWAY 1

Ormond Beach, FL 32174

SUITE 13

Ormond Beach, FL 32174

CBC058991 (Exp: 08/31/2024) (386) 672-8285

Sub Contractors

VERNON JACK SMITH III
Status Location Address State License Number Phone Fax
ACTIVE

224 KIRKLAND ROAD

NEW SMYRNA BEACH, FL 32169

EC13004432 (Exp: 08/31/2026) 386-409-3616 386-409-3616
SHAWN MICHAEL HISS
Status Location Address State License Number Phone
ACTIVE

1315 LPGA BLVD

HOLLY HILL, FL 32117

CAC1813585 (Exp: 08/31/2026) (386)672-8688
ALFRED N FYOCK JR
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

387 SAULS

ORMOND BEACH, FL 32174

ST

ORMOND BEACH, FL 32174

CCC1329075 (Exp: 08/31/2026) 386-566-6112 386-673-4299
JEFFREY DALE KNIGHT
Status Location Address State License Number Phone Fax
INACTIVE

923 ASHMEADE CT

PORT ORANGE, FL 32127

CFC057351 (Exp: 08/31/2026) 386-345-3857 386-345-4443

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/05/2020 Approval - Private Provider PPROVIDER
U -UTILITY RESIDENTIAL FINAL 08/03/2020 FINAL APPROVED JHARDING
ROW - STORMWATER FINAL 07/31/2020 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION FINAL SURVEY MUST BE APPROVED BEFORE THE FINAL STORMWATER. 7/31/20 - RETAINAING WALL IN THE EASEMENT APPROVED BECAUSE THE BUILDER'S FINAL GRADE WILL NOT IMPACT THE ADJACENT LOTS PER CITY OF PALM COAST LAND DEVELOPMENT CODE.
ROW FIELD SURVEY /GRADING CERTIFICATION 07/30/2020 APPROVED RGROSS
FINAL SURVEY (OFFICE USE ONLY) 07/30/2020 APPROVED RGROSS
Note: THIS IS A REINSPECTION FINAISHED FLOOR ELEVATION MUST BE 4 INCHES ABOVE THE FINISHED OUTSIDE GRADE AT THE FOUNDATION. COMPARE FFE 10.07 TO THE RIGHT OUTSIDE GRADE ELEVATION 10.08. Technical Manual Section 300.01 (A)(1)(B)(10) SEE FINAL SURVEY ATTACHMENT DATED 7/27/20. 7/30/20 - APPROVED
FINAL SURVEY (OFFICE USE ONLY) 07/27/2020 Disapproved - NO FEE RGROSS
Note: FINAISHED FLOOR ELEVATION MUST BE 4 INCHES ABOVE THE FINISHED OUTSIDE GRADE AT THE FOUNDATION. COMPARE FFE 10.07 TO THE RIGHT OUTSIDE GRADE ELEVATION 10.08. Technical Manual Section 300.01 (A)(1)(B)(10) SEE FINAL SURVEY ATTACHMENT DATED 7/27/20.
FINAL SURVEY (OFFICE USE ONLY) 07/23/2020 Disapproved - NO FEE RGROSS
Note: FINAISHED FLOOR ELEVATION MUST BE 4 INCHES ABOVE THE FINISHED OUTSIDE GRADE AT THE FOUNDATION. COMPARE FFE 10.07 TO THE RIGHT OUTSIDE GRADE ELEVATION 10.08. Technical Manual Section 300.01 (A)(1)(B)(10)
ROW - STORMWATER FINAL 07/23/2020 Disapproved - NO FEE RGROSS
Note: FINAL SURVEY MUST BE APPROVED BEFORE THE FINAL STORMWATER.
ROW FIELD SURVEY /GRADING CERTIFICATION 07/23/2020 CANCELLED BY INSPECTOR RGROSS
ROW - FINAL APRON (AFTER POUR) 07/17/2020 APPROVED RGROSS
PLUMBING FINAL 07/16/2020 Approval - Private Provider PPROVIDER
HVAC FINAL 07/16/2020 Approval - Private Provider PPROVIDER
ELECTRIC FINAL 07/16/2020 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 07/01/2020 APPROVED RGROSS
Note: READY TO POUR. NOTE THAT HEAVY RAIN IS IN THE FORECAST. BUILDER SHOULD DOUBLE CHECK ELEVATIONS BEFORE POURING.
TIE BEAM / LINTEL 06/22/2020 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 05/12/2020 APPROVED - AS NOTED JGIBSON
Note: THIS WAS APPROVED BY UNIVERSAL ALREADY
U - SEWER TIE IN 05/12/2020 APPROVED - AS NOTED JGIBSON
Note: UTILITY MADE THIS U-SEWER TIE IN DUE TO LOCATION
ELECTRIC - EARLY POWER 04/20/2020 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 03/16/2020 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 02/20/2020 APPROVED TBAKER
INSULATION 02/20/2020 Approval - Private Provider PPROVIDER
ALL ROUGH 02/17/2020 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/13/2020 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 01/13/2020 Approval - Private Provider PPROVIDER
ELEV CERT-FOUNDATION APPROVAL 12/11/2019 APPROVED JMYERS
MONOLITHIC SLAB 11/27/2019 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 11/21/2019 Approval - Private Provider BBEMBRY
WATER METER INSTALLATION REQUEST 10/17/2019 APPROVED CSTONE

Review History

Department Status Date In Date Out
PLFM COMPLETE 07/24/2020 07/24/2020
Note: Released By: JMYERS The Final elevation certificate has been approved.
BADMIN HOLD 07/24/2020 07/24/2020
Note: Held By: STHOMAS SURVEY HAS NO SEAL
BADMIN COMPLETE 07/24/2020 07/24/2020
Note: Released By: MDEFREITAS
PLFM HOLD 07/22/2020 07/22/2020
Note: Held By: JMYERS This elevation certificate is on the old form a new one was released by FEMA and must be used. Please do not write the permit number on the elevation certificate as it voids the seal. In section B9 please list the BFE as 7.00' not 7.00 feet.
BLD CANCEL 06/12/2020 06/15/2020
Note: Per Zoning and Palm Coast Land Development Code Section 3.05 B., 1. - a permit is not required for installation of a man-made landscape featuer not over 3 feet in height.
ZON CANCEL 06/12/2020 06/15/2020
Note: As per Building Official. Yes we should cancel our reviews so the applicant understands this work added to the original permit does not require separate plan approval and /or inspection. This "wall' meets the definition of a landscape feature and would therefore not require a permit.
ENGIN1 COMPLETE 02/20/2020 02/20/2020
Note: Released By: TBAKER
PLFM COMPLETE 12/11/2019 12/11/2019
Note: Released By: JMYERS The Building elevation certificate has been approved, however at Final please show the BFE as 7.00' not 7.00 feet it will not be approved otherwise.
PLFM COMPLETE 09/11/2019 09/11/2019
Note: Released By: JMYERS The Construction elevation certificate has been accepted. On Building and Final elevation certificates, please show B9 as 7.00’ not 7.00 feet.
ZON COMPLETE 08/27/2019 08/28/2019
Note: Released By: AMOBLEY
PLFM HOLD 08/27/2019 08/27/2019
Note: Held By: JMYERS Elevation certificates must be turned in hard copy they cannot be electronically submitted. In Section A8, a, b, and c cannot be left blank they must have N/A. In Section A8, d one of the boxes must be checked. In Section A9, b and c cannot be left blank they must have N/A. In Section A9, d one of the boxes must be checked. In Section B8, only list the AE Zone. In Section B9, the elevation must read 7.00’ In Section C2, the benchmark utilized must be a maintained benchmark and indicate the responsible party it cannot be as built surveys. In Section C2, b, c, and h cannot be left blank they must have N/A. In Section D, the raised seal must be signed and dated on top of. All pages of the elevation certificate must be provided.
PLFM HOLD 08/22/2019 08/22/2019
Note: Held By: JMYERS Elevation certificates must be turned in hard copy they cannot be electronically submitted. In Section A8, a, b, and c cannot be left blank they must have N/A. In Section A8, d one of the boxes must be checked. In Section A9, b and c cannot be left blank they must have N/A. In Section A9, d one of the boxes must be checked. In Section B8, only list the AE Zone. In Section B9, the elevation must read 7.00’ In Section C2, the benchmark utilized must be a maintained benchmark and indicate the responsible party it cannot be as built surveys. In Section C2, b, c, and h cannot be left blank they must have N/A. In Section D, the raised seal must be signed and dated on top of. All pages of the elevation certificate must be provided.
SWALE COMPLETE 08/22/2019 09/19/2019
Note: Released By: TBAKER
CUSVC COMPLETE 08/21/2019 08/22/2019
Note: Released By: AROSCOE
ENGIN1 COMPLETE 08/21/2019 08/22/2019
Note: Released By: TBAKER
LOCATE COMPLETE 08/21/2019 08/26/2019
Note: Released By: CSTONE
SW1 COMPLETE 08/21/2019 08/22/2019
Note: Released By: JMUNSON
UD1 COMPLETE 08/21/2019 08/27/2019
Note: Released By: AHALL
ZON HOLD 08/21/2019 08/22/2019
Note: Held By: AMOBLEY Additional 4 foundation plantings (shrubs) required along the rear because it backs up to a saltwater canal

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
METER - DEPOSIT ¤60.00 09/17/2019
WATER- TURN ON ¤25.00 09/17/2019
ADMIN FEE ¤125.00 09/17/2019
CONNECTION FEES ¤985.25 09/17/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 09/17/2019
IMPACT FEE FIRE ¤223.38 09/17/2019
IMPACT FEE PARKS ¤849.24 09/17/2019
IMPACT FEE SCHOOL ¤3,600.00 09/17/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 09/17/2019
WATER -IRRIGATION INSPECTION ¤25.00 09/17/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 09/17/2019
SITE PLAN 20 ¤20.00 09/17/2019
SURCHARGE FS 533.721 ¤2.00 09/17/2019
SURCHARGE - FS 468.631 ¤2.00 09/17/2019
STORM WATER PERMIT FEES ¤80.00 09/17/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 09/17/2019
SEWER INSPECTION ¤25.00 09/17/2019
SEWER CAPITAL FACILITY ¤4,515.25 09/17/2019
WATER CAPITAL FACILITY FEE ¤3,314.84 09/17/2019
Fees Total Due: ¤0.00 Total Paid: ¤15,402.82