Permit #2019081219

Permit Details

Status: COED

Parcel Id: 48-11-31-1710-00000-1130
CONDITIONED SPACE: 2470 sqft
GARAGE: 706 sqft
OPENED PORCH (WITH ROOF) : 46 sqft
OPENED PORCH (WITH ROOF) : 440 sqft
Total Square Footage: 3662 sqft
Block: 0
Subdivision: 2177 - GRAND HAVEN NORTH PHASE II
Job Phone: 386-445-2012
Location Address: 9 BLUE OAK LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/11/2019
NOC: RECORDED
Applicant name: JOHN NICHOLAS CORDASCI
Owner: FREY BRUCE A & GERMAINE

Address

HICKS TRUSTEES

LOUDON, TX 37774

Address

103 WAYNOKA LANE

LOUDON, TX 37774

Lot: 1130
Contracted Stated Job Value: ¤313,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SKYWAY BUILDERS INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 354786

PALM COAST, FL 32135

CBC1263769 (Exp: 08/31/2024) 386-445-2012

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
MARK JOHN LUTCZA
Status Location Address State License Number Phone
ACTIVE

26 ROYAL LEAF LANE

PALM COAST, FL 32164

EC13005145 (Exp: 08/31/2026) 386-586-0770

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 08/04/2020 FINAL APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION square nut clean out cap installed for serer-spoke wiyh JC-Super if he could change out to a flush 6in and he said he would
BLD - BUILDING FINAL 07/31/2020 FINAL APPROVED JBODEN
Note: THIS IS A REINSPECTION ADDED ON 7/30/2020 8:04:59 AM Waiting on revision for sump pump in backyard.
BLD - BUILDING FINAL 07/30/2020 CANCELLED BY APPLICANT JMUNSON
Note: Waiting on revision for sump pump in backyard.
U -UTILITY RESIDENTIAL FINAL 07/30/2020 PARTIALLY APPROVED LFITZGERALD
Note: square nut clean out cap installed for serer-spoke wiyh JC-Super if he could change out to a flush 6in and he said he would
ROW - STORMWATER FINAL 07/29/2020 APPROVED RGROSS
ROW - FINAL APRON (AFTER POUR) 07/29/2020 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 07/28/2020 APPROVED - AS NOTED RGROSS
Note: SEE NOTES ON APPROVED FINAL SURVEY.
FINAL SURVEY (OFFICE USE ONLY) 07/28/2020 APPROVED - AS NOTED RGROSS
Note: DRAINAGE ALONG THE LEFT SIDE PROPERTY LINE ON PAPER SURVEY DOES NOT APPEAR TO HAVE FALL BUT THE FIELD SURVEY INDICATES THAT THE STORM WATER WILL DRAIN. THEREFORE APPROVED AS NOTED.
U-CROSS CONNECTION 07/10/2020 FINAL APPROVED MBACON
ROW- PRE-APRON (PRE-POUR) 06/05/2020 APPROVED RGROSS
Note: READY TO POUR AND PLACE PAVERS. RESTRAINS READY.
ROW- PAVER RESTRAINTS 06/05/2020 APPROVED RGROSS
ELECTRIC - EARLY POWER 02/18/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 2:20
INSULATION 01/07/2020 APPROVED JDELBONIS
LATH/BRICK/ WATER BARRIER 01/03/2020 APPROVED JDELBONIS
ALL ROUGH 12/27/2019 APPROVED FWILLIS
ROOF VALLEY & METAL 12/02/2019 APPROVED JDELBONIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/20/2019 APPROVED JDELBONIS
Note: THIS IS A REINSPECTION
ELECTRIC-TUG 11/20/2019 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 11:50
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/19/2019 Disapproved -FEE REQUIRED WMILLER
Note: 1. SOLIDBLOCKING REQUIRED AT SHEATHING ENDS. (PER MANUFACTURER SPECS ON ENGINEERED SHEATHING) (OR SUPPLY MANUFACTURER SPECS FOR APPLICATION USED) 2. TRUSS BLOCKING REQUIRED WHERE SHEATHING SPANS MORE THAN 24 inches. (PER MANUFACTURER SPECS ON ENGINEERED SHEATHING) (OR SUPPLY MANUFACTURER SPECS FOR APPLICATION USED) 3. CONTINUOUS LOAD PATH… R301,2.1 OVERFRAMING NOT TIED TO STRUCTURAL MEMBERS BENEATH (KNEEWALL AT GARAGE)
TIE BEAM / LINTEL 11/07/2019 APPROVED MWILLIAMS
ELEV CERT-FOUNDATION APPROVAL 11/04/2019 APPROVED JMYERS
FOUND SURVEY APPROVED (OFFICE) 11/04/2019 APPROVED JMUNSON
MONOLITHIC SLAB 10/23/2019 APPROVED MWILLIAMS
PLUMBING 1ST ROUGH UNDERGROUND 10/18/2019 APPROVED JGIBSON
GRAVITY SEWER TEST 10/18/2019 APPROVED JGIBSON
U - SEWER TIE IN 10/18/2019 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 10/02/2019 APPROVED CSTONE

Review History

Department Status Date In Date Out
PLFM COMPLETE 08/05/2020 08/05/2020
Note: Released By: JMYERS The Final elevation certificate has been accepted.
ELEC COMPLETE 07/30/2020 07/30/2020
Note: Released By: JMUNSON
PLFM COMPLETE 11/04/2019 11/04/2019
Note: Released By: JMYERS The Building elevation certificate has been approved. Please provide Final prior to receiving CO.
SW1 COMPLETE 11/04/2019 11/04/2019
Note: Released By: JMUNSON
PLFM COMPLETE 09/10/2019 09/10/2019
Note: Released By: JMYERS The Construction elevation certificate has been accepted. Please provide Building and Final prior to receiving CO.
PLFM HOLD 09/05/2019 09/05/2019
Note: Held By: JMYERS According to City mapping resources, the entirety of this lot resides in a Special Flood Hazard Area. Elevation certificates will be required at 3 stages. Construction Drawings, Foundation, and Final.
BLD COMPLETE 08/30/2019 09/08/2019
Note: Released By: MGARRETT
CUSVC COMPLETE 08/30/2019 09/05/2019
Note: Released By: AROSCOE
ELEC COMPLETE 08/30/2019 08/30/2019
Note: Released By: JMUNSON
ENGIN1 COMPLETE 08/30/2019 09/11/2019
Note: Released By: TBAKER
LOCATE COMPLETE 08/30/2019 09/06/2019
Note: Released By: CSTONE
MECH COMPLETE 08/30/2019 09/08/2019
Note: Released By: MGARRETT
PLUM COMPLETE 08/30/2019 09/08/2019
Note: Released By: MGARRETT
SW1 COMPLETE 08/30/2019 08/30/2019
Note: Released By: JMUNSON
UD1 COMPLETE 08/30/2019 09/09/2019
Note: Released By: AHALL
ZON COMPLETE 08/30/2019 09/05/2019
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 07/31/2020
REINSPECTION FEE ¤40.00 07/31/2020
NEW RESIDENTIAL INSPECTIONS ¤646.00 09/11/2019
SITE PLAN 20 ¤20.00 09/11/2019
SURCHARGE FS 533.721 ¤14.47 09/11/2019
SURCHARGE - FS 468.631 ¤21.71 09/11/2019
STORM WATER PERMIT FEES ¤80.00 09/11/2019
3% TRANS IMPACT FEE CREDIT (¤89.43) 09/11/2019
SEWER INSPECTION ¤25.00 09/11/2019
ELECTRIC FEE ¤253.80 09/11/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 09/11/2019
IMPACT FEE FIRE ¤223.38 09/11/2019
IMPACT FEE PARKS ¤849.24 09/11/2019
IMPACT FEE SCHOOL ¤3,600.00 09/11/2019
IMPACT FEE TRANSPORTATION ¤2,981.00 09/11/2019
MECHANICAL FEE ¤253.80 09/11/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 09/11/2019
PLAN CHECK FEE ¤129.20 09/11/2019
PLUMBING FEE ¤253.80 09/11/2019
METER - DEPOSIT ¤60.00 09/11/2019
WATER-METER ¤426.95 09/11/2019
WATER-METER ¤354.69 09/11/2019
ADMIN FEE ¤20.00 09/11/2019
CONNECTION FEES ¤25.00 09/11/2019
Fees Total Due: ¤0.00 Total Paid: ¤10,196.43