Permit #2019090097
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00270-0060 |
| CONDITIONED SPACE: 1510 sqft |
| GARAGE: 403 sqft |
| SCREEN PORCH (SOLID ROOF) : 240 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| Total Square Footage: 2185 sqft |
| Block: 00270 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: 386-960-7720 |
| Location Address: 42 FRENORA LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/01/2019 |
| NOC: RECORDED |
| Applicant name: LAWRENCE FRED SIETSMA |
| Owner: AVTEC HOMES INC |
|
Address 590 MALABAR RD SE STE 3 PALM BAY, FL 32907 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤207,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
AVTEC HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
2405 E GRAVES AVE ORANGE CITY, FL 32763 |
CRC041905 (Exp: 08/31/2024) | 386-960-7720 |
Sub Contractors
DOUGLAS EDWARD RICHARDS
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
108 E INDIANA AVENUE DELAND, FL 32724 |
CCC1328824 (Exp: 08/31/2024) | 386-736-4226 | 386-740-0535 |
STEVEN JAY SMITH
| Status | Location Address | State License Number | Phone |
| INACTIVE |
104 West Cedar Avenue Orange City, FL 32763 |
EC0001542 (Exp: 08/31/2022) | (386)775-7776 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
BRUCE R BOLTON
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
1982 SR 44 NEW SMYRNA BEACH, FL 32168 |
SUITE 357 NEW SMYRNA BEACH, FL 32168 |
CAC1817407 (Exp: 08/31/2022) | 386-216-5975 | 386-402-4191 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/20/2020 | FINAL APPROVED | JDELBONIS |
| U -UTILITY RESIDENTIAL FINAL | 03/20/2020 | APPROVED | AHALL |
| ROW - STORMWATER FINAL | 03/16/2020 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 03/16/2020 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 03/13/2020 | APPROVED | RGROSS |
| Note: DRAINAGE CONVEYANCE IS ON THE INSIDE OF THE LEFT SIDE PROPERTY LINE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/13/2020 | APPROVED - AS NOTED | RGROSS |
| Note: SEE NOTES ON FINAL SURVEY INSPECTION | |||
| GRAVITY SEWER TEST | 02/18/2020 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 02/18/2020 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 02/18/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ELECTRIC - EARLY POWER | 02/14/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 3:10 | |||
| LATH/BRICK/ WATER BARRIER | 01/09/2020 | APPROVED | JDELBONIS |
| INSULATION | 01/08/2020 | APPROVED | JDELBONIS |
| ALL ROUGH | 12/27/2019 | APPROVED - AS NOTED | JCOLASANTI |
| Note: need air return at master bedroom.......need 5' head test on waste line (pipe was empty at time of inspection | |||
| ROOF VALLEY & METAL | 12/16/2019 | APPROVED | JDELBONIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/06/2019 | APPROVED | JDELBONIS |
| TIE BEAM / LINTEL | 11/22/2019 | APPROVED | JDELBONIS |
| FOUND SURVEY APPROVED (OFFICE) | 11/20/2019 | APPROVED | CTROHA |
| MONOLITHIC SLAB | 11/12/2019 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/01/2019 | APPROVED | JDELBONIS |
| WATER METER INSTALLATION REQUEST | 10/18/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 11/19/2019 | 11/20/2019 |
| Note: Released By: CTROHA | |||
| ZON | COMPLETE | 09/17/2019 | 09/17/2019 |
| Note: Released By: ELENS | |||
| SWALE | COMPLETE | 09/11/2019 | 10/01/2019 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 09/06/2019 | 09/15/2019 |
| Note: Released By: MGARRETT | |||
| CUSVC | COMPLETE | 09/06/2019 | 09/10/2019 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 09/06/2019 | 09/06/2019 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 09/06/2019 | 09/11/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 09/06/2019 | 09/09/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 09/06/2019 | 09/15/2019 |
| Note: Released By: MGARRETT | |||
| PLUM | COMPLETE | 09/06/2019 | 09/15/2019 |
| Note: Released By: MGARRETT | |||
| SW1 | COMPLETE | 09/06/2019 | 09/06/2019 |
| Note: Released By: JMUNSON | |||
| UD1 | COMPLETE | 09/06/2019 | 09/10/2019 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 09/06/2019 | 09/06/2019 |
| Note: Held By: ELENS Provide Driveway width and material on site plan. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 10/01/2019 |
| WATER- TURN ON | ¤25.00 | 10/01/2019 |
| ADMIN FEE | ¤20.00 | 10/01/2019 |
| CONNECTION FEES | ¤985.25 | 10/01/2019 |
| ELECTRIC FEE | ¤184.20 | 10/01/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 10/01/2019 |
| IMPACT FEE FIRE | ¤223.38 | 10/01/2019 |
| IMPACT FEE PARKS | ¤849.24 | 10/01/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/01/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 10/01/2019 |
| MECHANICAL FEE | ¤184.20 | 10/01/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/01/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/01/2019 |
| PLAN CHECK FEE | ¤82.80 | 10/01/2019 |
| PLUMBING FEE | ¤184.20 | 10/01/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤414.00 | 10/01/2019 |
| SITE PLAN 20 | ¤20.00 | 10/01/2019 |
| SURCHARGE FS 533.721 | ¤10.07 | 10/01/2019 |
| SURCHARGE - FS 468.631 | ¤15.10 | 10/01/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/01/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 10/01/2019 |
| SEWER INSPECTION | ¤25.00 | 10/01/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 10/01/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 10/01/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,368.39 |