Permit #2019090144
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00560-0130 |
| CONDITIONED SPACE: 1983 sqft |
| GARAGE: 516 sqft |
| OPENED PORCH (WITH ROOF) : 106 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| Total Square Footage: 2653 sqft |
| Block: 00560 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 407-807-0656 |
| Location Address: 56 BUNKER HILL DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/28/2019 |
| NOC: RECORDED |
| Applicant name: NAVIN SUGRIM |
| Owner: DLP BRITE HOMES LLC |
|
Address 605 PALENCIA CLUB DRIVE ST AUGUSTINE, FL 32095 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤135,076.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DLP BUILDERS LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
CBC1263567 (Exp: 08/31/2022) | 407-807-0656 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/01/2020 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION need to seal exhaust at AHU unit....need to complete plumbing at kitchen sink...need to secure range from tipping...need to secure laundry tub...(just note to install weather stripping garage door) | |||
| BLD - BUILDING FINAL | 05/29/2020 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: need to seal exhaust at AHU unit....need to complete plumbing at kitchen sink...need to secure range from tipping...need to secure laundry tub...(just note to install weather stripping garage door) | |||
| U -UTILITY RESIDENTIAL FINAL | 05/29/2020 | APPROVED | AHALL |
| ROW - STORMWATER FINAL | 05/28/2020 | APPROVED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION MAJOR PORTION OF SOD MISSING ON THE RIGHT FRONT OF PROPERTY. TRASH NEEDS PICKED UP ON ALL THE SURROUNDING VACANT LOTS AND ACROSS THE STREET. PALLET OF MISC. STONE ACROSS STREET NEEDS REMOVED. PICK UP WATER AND SODA BOTTLES AND DISGARDED PVC PIPES NEAR WATER METER. PICK UP MISC. TRASH NEAR THE FRONT RIGHT PROPERTY LINE. ROOF TAR PAPER, LEFT OVER DECORATIVE STONE ETC. MISSING SOD IN A LARGE AREA OFF THE RIGHT SIDE OF DRIVEWAY INCLUDING THE SWALE AREA. | |||
| ROW - STORMWATER FINAL | 05/12/2020 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION MAJOR PORTION OF SOD MISSING ON THE RIGHT FRONT OF PROPERTY. TRASH NEEDS PICKED UP ON ALL THE SURROUNDING VACANT LOTS AND ACROSS THE STREET. PALLET OF MISC. STONE ACROSS STREET NEEDS REMOVED. PICK UP WATER AND SODA BOTTLES AND DISGARDED PVC PIPES NEAR WATER METER. PICK UP MISC. TRASH NEAR THE FRONT RIGHT PROPERTY LINE. ROOF TAR PAPER, LEFT OVER DECORATIVE STONE ETC. MISSING SOD IN A LARGE AREA OFF THE RIGHT SIDE OF DRIVEWAY INCLUDING THE SWALE AREA. | |||
| ROW - FINAL APRON (AFTER POUR) | 05/08/2020 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 05/08/2020 | Disapproved - NO FEE | RGROSS |
| Note: MAJOR PORTION OF SOD MISSING ON THE RIGHT FRONT OF PROPERTY. TRASH NEEDS PICKED UP ON ALL THE SURROUNDING VACANT LOTS AND ACROSS THE STREET. PALLET OF MISC. STONE ACROSS STREET NEEDS REMOVED. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/07/2020 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 05/07/2020 | APPROVED | RGROSS |
| GRAVITY SEWER TEST | 04/23/2020 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 04/23/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 1:20 | |||
| U - SEWER TIE IN | 04/23/2020 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 04/15/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION CULVERT MUST ONLY BE BURIED 1/2 WAY. CULVERT IS COMPLETELY COVERED IN SOME SPOTS. SEE "RESIDENTIAL CULVERT DETAIL PDF" ON THE CITY WEB SITE. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/14/2020 | Disapproved - NO FEE | RGROSS |
| Note: CULVERT MUST ONLY BE BURIED 1/2 WAY. CULVERT IS COMPLETELY COVERED IN SOME SPOTS. SEE "RESIDENTIAL CULVERT DETAIL PDF" ON THE CITY WEB SITE. | |||
| PEP TANK INSTALLATION REQUEST | 03/23/2020 | APPROVED | CSTONE |
| INSULATION | 03/19/2020 | APPROVED | JCOLASANTI |
| LATH/BRICK/ WATER BARRIER | 03/19/2020 | APPROVED | JCOLASANTI |
| ALL ROUGH | 03/16/2020 | APPROVED - AS NOTED | JCOLASANTI |
| Note: need to nail trussm R24 per plan (4.5 in bottom cord per eng drawings, nail web 4" OC)...furring strip front bedroom,,,elec nail plate rear bedroom n | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/20/2020 | APPROVED - AS NOTED | JCOLASANTI |
| Note: need two straps both bearing points girder truss R24 garage | |||
| ROOF VALLEY & METAL | 02/20/2020 | APPROVED | JCOLASANTI |
| TIE BEAM / LINTEL | 02/07/2020 | APPROVED | JCOLASANTI |
| ELECTRIC-TUG | 02/07/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 11:00 am | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/06/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/27/2020 | APPROVED | JCOLASANTI |
| MONOLITHIC SLAB | 01/24/2020 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 01/22/2020 | CANCELLED BY APPLICANT | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/16/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 12/17/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 02/05/2020 | 02/06/2020 |
| Note: Released By: TBAKER | |||
| ENGIN1 | HOLD | 01/28/2020 | 01/28/2020 |
| Note: Held By: TBAKER Please show garage slab elevation on foundation survey | |||
| ENGIN1 | COMPLETE | 09/19/2019 | 09/24/2019 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 09/19/2019 | 09/20/2019 |
| Note: Released By: JMUNSON | |||
| ZON | COMPLETE | 09/19/2019 | 09/20/2019 |
| Note: Released By: ELENS | |||
| SWALE | COMPLETE | 09/11/2019 | 10/02/2019 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 09/09/2019 | 09/17/2019 |
| Note: Released By: MGARRETT | |||
| CUSVC | COMPLETE | 09/09/2019 | 09/10/2019 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 09/09/2019 | 09/09/2019 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 09/09/2019 | 09/11/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 09/09/2019 | 09/11/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 09/09/2019 | 09/17/2019 |
| Note: Released By: MGARRETT | |||
| PLUM | COMPLETE | 09/09/2019 | 09/17/2019 |
| Note: Released By: MGARRETT | |||
| SW1 | HOLD | 09/09/2019 | 09/09/2019 |
| Note: Held By: JMUNSON Remove Septic and Drainfield. | |||
| UD1 | COMPLETE | 09/09/2019 | 09/12/2019 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 09/09/2019 | 09/09/2019 |
| Note: Held By: ELENS Need to show A/C pad with dimensions and setback on Site Plan. Please provide driveway width on the site plan. Need an additional shrub on left side of residence. (Residential homes shall provide foundation plantings consisting of 16 shrubs. On interior lots, eight shrubs shall be planted in front of the home, and four shrubs planted on each side of the home.) |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/13/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 05/06/2020 |
| ELECTRIC FEE | ¤208.20 | 10/28/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 10/28/2019 |
| IMPACT FEE FIRE | ¤223.38 | 10/28/2019 |
| IMPACT FEE PARKS | ¤849.24 | 10/28/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/28/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 10/28/2019 |
| MECHANICAL FEE | ¤208.20 | 10/28/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/28/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/28/2019 |
| PLAN CHECK FEE | ¤98.80 | 10/28/2019 |
| PLUMBING FEE | ¤208.20 | 10/28/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤494.00 | 10/28/2019 |
| SITE PLAN 20 | ¤20.00 | 10/28/2019 |
| SURCHARGE FS 533.721 | ¤11.59 | 10/28/2019 |
| SURCHARGE - FS 468.631 | ¤17.38 | 10/28/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/28/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 10/28/2019 |
| SEWER CREDIT | (¤2,323.74) | 10/28/2019 |
| SEWER INSPECTION | ¤25.00 | 10/28/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 10/28/2019 |
| WATER CREDIT | (¤142.01) | 10/28/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 10/28/2019 |
| METER - DEPOSIT | ¤60.00 | 10/28/2019 |
| WATER- TURN ON | ¤25.00 | 10/28/2019 |
| ADMIN FEE | ¤20.00 | 10/28/2019 |
| CONNECTION FEES | ¤985.25 | 10/28/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,154.44 |