I want to search for...
Permit #2019090366
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-0740 |
| CONDITIONED SPACE: 3817 sqft |
| GARAGE: 1192 sqft |
| OPENED PORCH (WITH ROOF) : 97 sqft |
| OPENED PORCH (WITH ROOF) : 840 sqft |
| Total Square Footage: 5946 sqft |
| Block: 00000 |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-947-4481 |
| Location Address: 9 SCARLET OAK CIR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/28/2019 |
| NOC: RECORDED |
| Applicant name: ERIC CHRISTOPHER OLSEN |
| Owner: COVELL ROBERT M & ANDREA M COVELL JOINT TRUST |
|
Address 69 HAMMOCK BEACH CIRCLE PALM COAST, FL 32137 |
| Lot: 0740 |
| Contracted Stated Job Value: ¤700,000.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
OLSEN CUSTOM HOMES AND CONSULTING INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
CGC1508852 (Exp: 08/31/2026) | 386-947-4481 | (386)947-4484 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
BERT S MCLAUGHLIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13006455 (Exp: 08/31/2026) | 386-265-2687 |
LEONARD E GASPARY
| Status | Location Address | Phone | Fax |
| INACTIVE |
400 NORTH US HWY #1 ORMOND BEACH, FL 32174 |
(386)672-8494 | (386)673-7856 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/08/2020 | FINAL APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION DOCUMENTS NEED TO BE APPROVED AND KEPT ON SITE 107.3,1. (need documents for inspection) 11-24-2020... 1. MOCP RATING NOT MATCHING BREAKERS FBC M1303 2. DUCTS MUST BE SEALED: FBC, R-M1601.4.1 CONNECTIONS IN DUCTWORK SHALL BE SECURELY FASTENED AN SEALED 3. LOCKING CAPS NEEDED ON CONDENSING UNIT FBC.M 1411.6 4. garbage disposal trips breaker at small sink in kitchen. 5. Fall protection at pools edge 6. details for structure on half wall at butterfly garden 12-8-2020... deficiencies above resolved | |||
| BLD - BUILDING FINAL | 11/24/2020 | Disapproved - NO FEE | WMILLER |
| Note: THIS IS A REINSPECTION DOCUMENTS NEED TO BE APPROVED AND KEPT ON SITE 107.3,1. (need documents for inspection) 11-24-2020... 1. MOCP RATING NOT MATCHING BREAKERS FBC M1303 2. DUCTS MUST BE SEALED: FBC, R-M1601.4.1 CONNECTIONS IN DUCTWORK SHALL BE SECURELY FASTENED AN SEALED 3. LOCKING CAPS NEEDED ON CONDENSING UNIT FBC.M 1411.6 4. garbage disposal trips breaker at small sink in kitchen. 5. Fall protection at pools edge 6. details for structure on half wall at butterfly garden | |||
| U -UTILITY RESIDENTIAL FINAL | 11/19/2020 | FINAL APPROVED | LFITZGERALD |
| BLD - BUILDING FINAL | 11/19/2020 | Disapproved - NO FEE | WMILLER |
| Note: DOCUMENTS NEED TO BE APPROVED AND KEPT ON SITE 107.3,1. (need documents for inspection) | |||
| ROW - STORMWATER FINAL | 11/18/2020 | APPROVED | GBERTOLA |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/09/2020 | APPROVED - AS NOTED | KRUTH |
| Note: SPOKE WITH BUILDER ABOUT NEEDING SOD FOR BANK OF POND FOR BANK STABILIZATION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 11/09/2020 | APPROVED - AS NOTED | KRUTH |
| Note: SPOKE TO BUILDER ABOUT FFE ON ADJACENT LOTS NEEDS TO BE ON FINAL SURVEY IN THE FUTURE | |||
| U-CROSS CONNECTION | 11/06/2020 | APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 11/05/2020 | APPROVED | KRUTH |
| ROW- PRE-APRON (PRE-POUR) | 10/02/2020 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION APPROVED FOR CONCRETE APRON AND PAVER RESTRAINTS ONLY. 10/2/20 - COMPUTER DOWN. INSPECTIONS DONE MANULLY. ACTUAL TIME AT THIS SITE WAS 7:10-7:15. | |||
| ROW- PAVER RESTRAINTS | 09/18/2020 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 09/18/2020 | PARTIALLY APPROVED | RGROSS |
| Note: APPROVED FOR CONCRETE APRON AND PAVER RESTRAINTS ONLY. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/18/2020 | APPROVED - AS NOTED | RGROSS |
| Note: DISREGARD THIS INSPECTION. IT WAS SUPPOSED TO BE A FEILD INSPECTION FOR ANOTHER ADDRESS. COMPUTER ERROR. | |||
| ELECTRIC - EARLY POWER | 07/30/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 2:15 | |||
| GRAVITY SEWER TEST | 03/25/2020 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 03/25/2020 | APPROVED | JGIBSON |
| INSULATION | 03/02/2020 | APPROVED - AS NOTED | WMILLER |
| Note: need insulation cerificate on site at final | |||
| LATH/BRICK/ WATER BARRIER | 02/28/2020 | APPROVED | JDELBONIS |
| ALL ROUGH | 02/18/2020 | APPROVED | JDELBONIS |
| WINDOW FASTENING | 02/18/2020 | APPROVED | JDELBONIS |
| DOWN CELL | 02/18/2020 | APPROVED | JDELBONIS |
| ELECTRIC-TUG | 02/18/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 2:00 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/05/2020 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 02/05/2020 | APPROVED | JDELBONIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/03/2020 | Disapproved - NO FEE | JDELBONIS |
| Note: not ready tie downs ok to cover roof and walls | |||
| TIE BEAM / LINTEL | 01/03/2020 | APPROVED | JDELBONIS |
| FOUND SURVEY APPROVED (OFFICE) | 01/02/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 12/02/2019 | APPROVED | JDELBONIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/18/2019 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/15/2019 | CANCELLED BY APPLICANT | JDELBONIS |
| WATER METER INSTALLATION REQUEST | 10/31/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 12/03/2020 | 12/07/2020 |
| Note: Released By: PBUCKLEY | |||
| BLD | COMPLETE | 04/29/2020 | 05/04/2020 |
| Note: Released By: FREODICA Revision : Bldg review not applicable. | |||
| ZON | COMPLETE | 04/29/2020 | 04/29/2020 |
| Note: Released By: ELENS | |||
| BLD | COMPLETE | 02/24/2020 | 03/05/2020 |
| Note: Released By: FREODICA Revision: changed truss engineering. | |||
| BLD | COMPLETE | 01/16/2020 | 01/24/2020 |
| Note: Released By: FREODICA Revision: truss repair on T-17 & T-18. | |||
| ENGIN1 | COMPLETE | 12/31/2019 | 01/02/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 12/17/2019 | 12/18/2019 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 12/17/2019 | 12/31/2019 |
| Note: Released By: FREODICA Provide revised plans affected by the changes as indicated on revision sheet for clarity per FBC 6th ed.sec. 107.2.1. FReodica-386-986-4734 | |||
| SW1 | COMPLETE | 10/23/2019 | 10/25/2019 |
| Note: Released By: JMUNSON | |||
| SW1 | HOLD | 10/15/2019 | 10/21/2019 |
| Note: Held By: JMUNSON (1) The Topographic Survey shall be signed, dated and sealed by an actively Licensed Florida Professional Surveyor - Mapper. (2) The signature and date must be under a raised seal. (3) Finished Floor Elevation (FFE) of the living area of improved structures on adjacent lots. (4) The elevations on all adjacent properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. (5) The elevations at 20 foot intervals along all property lines. (6) The interior elevations at no greater than a 20 foot grid. (7) The road centerline (RCL) and edge of pavement (EOP) elevations for roadways adjacent to and along all property lines, including EOP in cul-de-sacs at 9, 12, and 3 O’clock positions. (8) The elevations and/or inverts of all drainage structures within 100 feet of the property lines, including, culverts, inlets, swales, weirs, etc. both upstream and downstream of the property. This includes the ditch bottom and top of bank of ditches located on the property or in Reserved Parcels adjacent to the property. (9) All elevations are to be expressed to nearest 0.01 foot. (10) An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. fire hydrant, nail in power pole.) Pavement nails will not be accepted as benchmarks. (The bench mark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. | |||
| ZON | COMPLETE | 10/15/2019 | 10/16/2019 |
| Note: Released By: AMOBLEY | |||
| SW1 | HOLD | 10/10/2019 | 10/11/2019 |
| Note: Held By: JMUNSON Need to show the proposed drainage. Need to show the proposed elevation at the corners of the house. ULDC Tech Manual sec 5 300 | |||
| ZON | HOLD | 10/10/2019 | 10/11/2019 |
| Note: Held By: AMOBLEY Butterfly garden must meet the 5ft setback. Survey shows it at 4.9 Please correct to show the 5ft | |||
| ELEC | COMPLETE | 10/10/2019 | 10/11/2019 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 09/12/2019 | 09/20/2019 |
| Note: Released By: MGARRETT | |||
| CUSVC | COMPLETE | 09/12/2019 | 09/13/2019 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 09/12/2019 | 09/17/2019 |
| Note: Held By: JMUNSON Electrical contractor need to update his state license. Need to be specific on load calcs and riser diagram on what size service will be put up. | |||
| ENGIN1 | COMPLETE | 09/12/2019 | 09/12/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 09/12/2019 | 09/13/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 09/12/2019 | 09/20/2019 |
| Note: Released By: MGARRETT | |||
| PLUM | COMPLETE | 09/12/2019 | 09/20/2019 |
| Note: Released By: MGARRETT | |||
| SW1 | HOLD | 09/12/2019 | 09/13/2019 |
| Note: Held By: JMUNSON (4) The elevations on all adjacent properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. (5) The elevations at 20 foot intervals along all property lines. (6) The interior elevations at no greater than a 20 foot grid. | |||
| UD1 | COMPLETE | 09/12/2019 | 09/17/2019 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 09/12/2019 | 09/13/2019 |
| Note: Held By: AMOBLEY Survey/Site plan must have total lot square footage, Flood Zone, show all platted easements and must show the AC Pad location Lot layout on landscape plan and site plan do not match Show height and exterior finish of wall in front and that the color will match the house |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 12/07/2020 |
| REVISION | ¤40.00 | 12/07/2020 |
| SITE PLAN 20 | ¤20.00 | 10/28/2019 |
| SURCHARGE FS 533.721 | ¤28.80 | 10/28/2019 |
| SURCHARGE - FS 468.631 | ¤43.20 | 10/28/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/28/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 10/28/2019 |
| SEWER INSPECTION | ¤25.00 | 10/28/2019 |
| METER - DEPOSIT | ¤60.00 | 10/28/2019 |
| WATER-METER | ¤426.95 | 10/28/2019 |
| WATER-METER | ¤354.69 | 10/28/2019 |
| ADMIN FEE | ¤20.00 | 10/28/2019 |
| CONNECTION FEES | ¤25.00 | 10/28/2019 |
| CONTRACTOR CHANGE | ¤40.00 | 10/28/2019 |
| CONTRACTOR CHANGE | ¤40.00 | 10/28/2019 |
| ELECTRIC FEE | ¤480.00 | 10/28/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 10/28/2019 |
| IMPACT FEE FIRE | ¤223.38 | 10/28/2019 |
| IMPACT FEE PARKS | ¤849.24 | 10/28/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/28/2019 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 10/28/2019 |
| MECHANICAL FEE | ¤480.00 | 10/28/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/28/2019 |
| PLAN CHECK FEE | ¤280.00 | 10/28/2019 |
| PLUMBING FEE | ¤480.00 | 10/28/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤1,400.00 | 10/28/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,895.65 |