Permit #2019090545
Permit Details
Status: COED
| Parcel Id: 35-11-31-4075-00000-1130 |
| CONDITIONED SPACE: 1977 sqft |
| GARAGE: 581 sqft |
| OPENED PORCH (WITH ROOF) : 285 sqft |
| OPENED PORCH (WITH ROOF) : 50 sqft |
| Total Square Footage: 2893 sqft |
| Block: 0 |
| Subdivision: 2296 - MARINA DEL PALMA SUBDIVISION |
| Job Phone: 386-947-4481 |
| Location Address: 13 MENORCA WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/09/2019 |
| NOC: RECORDED |
| Applicant name: ERIC CHRISTOPHER OLSEN |
| Owner: SUND JENNIFER & CARL SUND W&H |
|
Address 2719 MORNING LIGHT CT BEVERLY BEACH, FL 32136 |
| Lot: 113 |
| Contracted Stated Job Value: ¤380,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
OLSEN CUSTOM HOMES AND CONSULTING INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
CGC1508852 (Exp: 08/31/2026) | 386-947-4481 | (386)947-4484 |
Sub Contractors
BERT S MCLAUGHLIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13006455 (Exp: 08/31/2026) | 386-265-2687 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
KEITH A BATTERBEE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
380 SE 123RD STREET ROAD OCALA, FL 34480 |
CCC1326176 (Exp: 08/31/2026) | 352-748-6300 X102 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 09/02/2020 | FINAL APPROVED | JHARDING |
| Note: THIS IS A REINSPECTION sewer cleanout cap required to be raised flush with sod grade(currently is covered over) | |||
| U -UTILITY RESIDENTIAL FINAL | 08/21/2020 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: sewer cleanout cap required to be raised flush with sod grade(currently is covered over) | |||
| ROW - STORMWATER FINAL | 03/31/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION REESTABLISH THE BUFFER SOD LINE ALONG THE CURB ON BOTH ADJACENT LOTS WHERE VEHICLES, DELIVERY AND SERVICE TRUCKS ENTERED AND EXITED. CLEAN WASHED OUT SAND FROM THE CURBS ON BOTH ADJACENT LOTS TO PROTECT STORM WATER WASHOUT INTO THE STORM SYSTEM. PHOTO'S ATTACHED. NOTHING HAS BEEN CORRECTED SINCE THE LAST INSPECTION 3/26/20 PLUS PHOTO'S. | |||
| ROW - STORMWATER FINAL | 03/30/2020 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION REESTABLISH THE BUFFER SOD LINE ALONG THE CURB ON BOTH ADJACENT LOTS WHERE VEHICLES, DELIVERY AND SERVICE TRUCKS ENTERED AND EXITED. CLEAN WASHED OUT SAND FROM THE CURBS ON BOTH ADJACENT LOTS TO PROTECT STORM WATER WASHOUT INTO THE STORM SYSTEM. PHOTO'S ATTACHED. NOTHING HAS BEEN CORRECTED SINCE THE LAST INSPECTION 3/26/20 PLUS PHOTO'S. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/27/2020 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION FINAL GRADE WITH SOD MUST BE IN PLACE BEFORE FINAL SURVEY CAN BE APPROVED. THIS WAS ALREADY APPROVED ON 3/25/20 | |||
| ROW - STORMWATER FINAL | 03/26/2020 | Disapproved - NO FEE | RGROSS |
| Note: REESTABLISH THE BUFFER SOD LINE ALONG THE CURB ON BOTH ADJACENT LOTS WHERE VEHICLES, DELIVERY AND SERVICE TRUCKS ENTERED AND EXITED. CLEAN WASHED OUT SAND FROM THE CURBS ON BOTH ADJACENT LOTS TO PROTECT STORM WATER WASHOUT INTO THE STORM SYSTEM. PHOTO'S ATTACHED. | |||
| ROW - FINAL APRON (AFTER POUR) | 03/26/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION SOD MUST BE PLACED AROUND ALL NEW CONCRETE AND PAVER EDGES TO PREVENT WASHOUT. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/24/2020 | Disapproved - NO FEE | RGROSS |
| Note: FINAL GRADE WITH SOD MUST BE IN PLACE BEFORE FINAL SURVEY CAN BE APPROVED. | |||
| ROW - FINAL APRON (AFTER POUR) | 03/19/2020 | Disapproved -FEE REQUIRED | RGROSS |
| Note: SOD MUST BE PLACED AROUND ALL NEW CONCRETE AND PAVER EDGES TO PREVENT WASHOUT. | |||
| BLD - BUILDING FINAL | 03/18/2020 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 03/18/2020 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 03/02/2020 | APPROVED | TBAKER |
| ROW- PRE-APRON (PRE-POUR) | 02/12/2020 | PARTIALLY APPROVED | RGROSS |
| Note: APPROVED FOR THE CONCRETE APRON, SIDEWALK AND PAVER RESTRAINTS ONLY. | |||
| ROW- PAVER RESTRAINTS | 02/12/2020 | APPROVED | RGROSS |
| ELECTRIC - EARLY POWER | 01/31/2020 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 01/13/2020 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 12/23/2019 | Approval - Private Provider | PPROVIDER |
| INSULATION | 12/23/2019 | Approval - Private Provider | PPROVIDER |
| U - SEWER TIE IN | 12/05/2019 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 12/05/2019 | APPROVED | JGIBSON |
| ROOF VALLEY & METAL | 11/27/2019 | Approval - Private Provider | PPROVIDER |
| ELECTRIC-TUG | 11/27/2019 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/25/2019 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 11/11/2019 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 10/28/2019 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/24/2019 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 10/11/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 02/27/2020 | 03/02/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 10/07/2019 | 10/08/2019 |
| Note: Released By: AMOBLEY | |||
| SW1 | COMPLETE | 10/07/2019 | 10/08/2019 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 09/17/2019 | 09/24/2019 |
| Note: Released By: MGARRETT | |||
| CUSVC | COMPLETE | 09/17/2019 | 09/19/2019 |
| Note: Released By: AROSCOE | |||
| ELEC | COMPLETE | 09/17/2019 | 09/18/2019 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 09/17/2019 | 09/23/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 09/17/2019 | 09/19/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 09/17/2019 | 09/24/2019 |
| Note: Released By: MGARRETT | |||
| PLUM | COMPLETE | 09/17/2019 | 09/24/2019 |
| Note: Released By: MGARRETT | |||
| SW1 | HOLD | 09/17/2019 | 09/18/2019 |
| Note: Held By: JMUNSON Need to show Final Floor Elevation. Elevations on the corners of the house. Need the proposed drainage. ULDC Tech Manual Sec 5 300 | |||
| UD1 | COMPLETE | 09/17/2019 | 09/20/2019 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 09/17/2019 | 09/18/2019 |
| Note: Held By: AMOBLEY Please show just platted easements on the survey Survey should have total lot square footage Banding must placed around the windows and doors visible from the right-of-way, Window shutters may substitutefor banding Accent shutters are designed as a visual detail for windows Shutters shall match the height of the window |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 11/16/2020 |
| REINSPECTION FEE | ¤40.00 | 03/31/2020 |
| SITE PLAN 20 | ¤20.00 | 10/09/2019 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/09/2019 |
| SURCHARGE - FS 468.631 | ¤2.00 | 10/09/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/09/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 10/09/2019 |
| SEWER INSPECTION | ¤25.00 | 10/09/2019 |
| SEWER CAPITAL FACILITY | ¤2,338.17 | 10/09/2019 |
| WATER CAPITAL FACILITY FEE | ¤2,186.85 | 10/09/2019 |
| METER - DEPOSIT | ¤110.00 | 10/09/2019 |
| WATER-METER | ¤426.95 | 10/09/2019 |
| ADMIN FEE | ¤20.00 | 10/09/2019 |
| CONNECTION FEES | ¤25.00 | 10/09/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 10/09/2019 |
| IMPACT FEE FIRE | ¤223.38 | 10/09/2019 |
| IMPACT FEE PARKS | ¤849.24 | 10/09/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/09/2019 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 10/09/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/09/2019 |
| PLAN CHECK FEE | ¤152.00 | 10/09/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤12,999.98 |