Permit #2019090546
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7017-00010-0450 |
| CONDITIONED SPACE: 60 sqft |
| OPENED PORCH (WITH ROOF) : 336 sqft |
| Total Square Footage: 396 sqft |
| Block: 00010 |
| Subdivision: 2129 - SECTION 17-BELLE TERRE |
| Job Phone: 386-449-9413 |
| Location Address: 119 BOULDER ROCK DR |
| Type: BA - BUILDING ADDITION |
| Issue Date: 11/26/2019 |
| NOC: RECORDED |
| Applicant name: STEVE HARKINS |
| Owner: ALLEN JOHN E & LINDA L E H&W |
|
Address 119 BOULDER ROCK DR PALM COAST, FL 32137 |
| Lot: 0450 |
| Contracted Stated Job Value: ¤61,000.00 |
| Job Description: EXTEND MASTER BATHROOM -ADD UPPER BALCONY |
| Type: CN |
Contractor
HARKINS CUSTOM CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
665 STREET TRAIL BUNNELL, FL 32110 |
CBC1253997 (Exp: 08/31/2026) | 386-449-9413 |
Sub Contractors
JERRY F TORDEUR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
4244 JACKSON ST Port Orange, FL 32119 |
CFC033863 (Exp: 08/31/2020) | (386) 761-3526 | (386)761-0132 |
GERALD EDWARD MASTERS JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
505 HERBERT STREET PORT ORANGE, FL 32129 |
EC13003217 (Exp: 08/31/2026) | (386)304-2600 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/24/2020 | FINAL APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Windows very hard to open and close. Heater fan Making grinding noise when turned on. Electrical outlets need covers and installed close to wall. Outlet under sink needs plate to cover opening. Grab Bars not installed according to ADA. | |||
| ROW - FINAL INSPECTION | 06/22/2020 | APPROVED | RGROSS |
| U -UTILITY RESIDENTIAL FINAL | 06/22/2020 | APPROVED | AHALL |
| BLD - BUILDING FINAL | 06/22/2020 | Disapproved - NO FEE | FWILLIS |
| Note: Windows very hard to open and close. Heater fan Making grinding noise when turned on. Electrical outlets need covers and installed close to wall. Outlet under sink needs plate to cover opening. Grab Bars not installed according to ADA. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/17/2020 | APPROVED | RGROSS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/16/2020 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 05/06/2020 | APPROVED | TBAKER |
| INSULATION | 05/05/2020 | APPROVED | FWILLIS |
| ALL ROUGH | 05/04/2020 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 04/03/2020 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 04/03/2020 | APPROVED | FWILLIS |
| DOWN CELL | 03/13/2020 | APPROVED | FWILLIS |
| ROOF SHEATHING | 03/10/2020 | APPROVED | JCOLASANTI |
| MONOLITHIC SLAB | 03/10/2020 | APPROVED - AS NOTED | JCOLASANTI |
| Note: footing inspection for spa ..revision to permit | |||
| TIE BEAM / LINTEL | 02/25/2020 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 02/20/2020 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/19/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/18/2020 | Disapproved - NO FEE | JGIBSON |
| Note: P-2502.1 EXISTING PLUMBING, P-2502.2 ADDITIONS ALTERATIONS OR REPAIRS,P-3108.2 DRY VENT CONNECTION, 3108.2 HORIZONTAL WET VENT, 3108.2.2VERTICAL WET VENT |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | COMPLETE | 06/18/2020 | 06/18/2020 |
| Note: Released By: BBEMBRY | |||
| ZON | COMPLETE | 06/15/2020 | 06/15/2020 |
| Note: Released By: ELENS | |||
| BADMIN | HOLD | 06/15/2020 | 06/15/2020 |
| Note: Held By: JMONTARULI I can't put the Final Survey through yet, because they have an outstanding with a lower priority inspection to do first. I sent them an email to let them know | |||
| ENGIN1 | COMPLETE | 05/06/2020 | 05/07/2020 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 05/06/2020 | 05/06/2020 |
| Note: Held By: ELENS The Foundation Survey does not appear to match the approved site plan - location and dimension of proposed bathroom and deck extension and setbacks. Please provide a revised site plan for approval. | |||
| BLD | COMPLETE | 03/02/2020 | 03/06/2020 |
| Note: Released By: PBUCKLEY | |||
| BLD | HOLD | 02/03/2020 | 02/11/2020 |
| Note: Held By: PBUCKLEY 1. Provide details signed and sealed by a Florida engineer for the CMU spa enclosure and foundation including all re-enforcing steel, CMU type, grout, etc. 2. Provide complete framing details for deck framing mounted on CMU enclosure walls and extending around spa. Include spans and on-center spacing of joists. Include beam type and details. Include column locations, type and connection details. Include attachment details at CMU wall, support details at ends of deck at spa. Include details for removable section. Include details for all connectors, wood anchors types. Provide design loads (minimum 40 psf live load / 10 psf dead load. Provide framing material details. If wood, provide wood species and grade, indicate preservative treatment type. 3. Provide complete manufacturer's specifications for spa indicating conformance with ANSI/APSP/ICC 6 - 13 and ANSI/APSP/ICC 7 - 13 PER FBCR - Section R4501.6.1. 4. Provide complete spa barrier details in accordance with FBCR Section R4501.17. Provide details conforming with Section R4501.17.1.1 through R4501.17.1.14 including barrier or water alarm details. Provide manufacturer spec sheets for alarms indicating they meet applicable UL2017 or ASTM F2208 standards. If locking cover is to be used on spa in lieu of barrier, provide manufacturer's spec sheet indicating it is a lockable cover and conforms to ASTM F1346 | |||
| ELEC | COMPLETE | 02/03/2020 | 02/04/2020 |
| Note: Released By: JMUNSON | |||
| ZON | COMPLETE | 02/03/2020 | 02/04/2020 |
| Note: Released By: ELENS | |||
| ELEC | COMPLETE | 11/12/2019 | 11/14/2019 |
| Note: Released By: JMUNSON | |||
| ZON | COMPLETE | 11/12/2019 | 11/12/2019 |
| Note: Released By: AMOBLEY | |||
| MECH | COMPLETE | 11/12/2019 | 11/13/2019 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 11/12/2019 | 11/25/2019 |
| Note: Released By: PBUCKLEY | |||
| BLD | COMPLETE | 11/12/2019 | 11/25/2019 |
| Note: Released By: PBUCKLEY | |||
| BLD | HOLD | 09/17/2019 | 09/22/2019 |
| Note: Held By: MGARRETT Please provide structural details for the proosed deck: column sizes, anchoring details, columpad demensions. Provide structural details for the proposed CMU wall: footing details, bond beam interconnection to existing, wall to roof anchoring. Provide roof construction details Provide interior framing details | |||
| ELEC | HOLD | 09/17/2019 | 09/18/2019 |
| Note: Held By: JMUNSON Give scope of work for electrical | |||
| MECH | HOLD | 09/17/2019 | 09/22/2019 |
| Note: Held By: MGARRETT Please provide mechnical work scope details | |||
| PLUM | HOLD | 09/17/2019 | 09/22/2019 |
| Note: Held By: MGARRETT Provide plumbing details for the proposed bathroom addition | |||
| SW1 | COMPLETE | 09/17/2019 | 09/18/2019 |
| Note: Released By: JMUNSON | |||
| ZON | HOLD | 09/17/2019 | 09/18/2019 |
| Note: Held By: ELENS Please indicate that finished material and color will match the existing house. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 11/26/2019 |
| ELECTRIC FEE | ¤96.60 | 11/26/2019 |
| MECHANICAL FEE | ¤96.60 | 11/26/2019 |
| PLAN CHECK FEE | ¤40.00 | 11/26/2019 |
| PLUMBING FEE | ¤96.60 | 11/26/2019 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 11/26/2019 |
| SITE PLAN 20 | ¤20.00 | 11/26/2019 |
| SURCHARGE FS 533.721 | ¤3.70 | 11/26/2019 |
| SURCHARGE - FS 468.631 | ¤5.55 | 11/26/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/26/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤499.05 |