I want to search for...

Permit #2019090588

Permit Details

Status: COED

Parcel Id: 07-11-31-7023-00380-0170
CONDITIONED SPACE: 1983 sqft
GARAGE: 516 sqft
OPENED PORCH (WITH ROOF) : 106 sqft
OPENED PORCH (WITH ROOF) : 48 sqft
Total Square Footage: 2653 sqft
Block: 00380
Subdivision: 2191 - SECTION 23-WYNNFIELD
Job Phone: 407-807-0656
Location Address: 7 WHITE HURST LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/28/2019
NOC: RECORDED
Applicant name: NAVIN SUGRIM
Owner: DLP BRITE HOMES LLC

Address

605 PALENCIA CLUB DRIVE

ST AUGUSTINE, FL 32095

Lot: 0170
Contracted Stated Job Value: ¤135,076.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

DLP BUILDERS LLC
Status Location Address State License Number Phone
CANCEL

7345 GREENBRIAR PKWY

ORLANDO, FL 32819

CBC1263567 (Exp: 08/31/2022) 407-807-0656

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/22/2020 FINAL APPROVED FWILLIS
Note: THIS IS A REINSPECTION CONDENSATE DRAIN R318.5 PROTECTION AGAINST DECAY AND TRERMITES, MUST DISCHARGE AT LEAST 1FT- AWAY FROM STRUCTURE SIDEWALL 5/22/20 - Problem corrected.
BLD - BUILDING FINAL 05/18/2020 Disapproved - NO FEE JCOLASANTI
Note: CONDENSATE DRAIN R318.5 PROTECTION AGAINST DECAY AND TRERMITES, MUST DISCHARGE AT LEAST 1FT- AWAY FROM STRUCTURE SIDEWALL
U -UTILITY RESIDENTIAL FINAL 05/18/2020 APPROVED - AS NOTED LFITZGERALD
Note: ball valve on water meter lline upside down-UTILITY(RS) TO TAKE CARE OF
ROW - STORMWATER FINAL 05/15/2020 APPROVED RGROSS
Note: THIS IS A REINSPECTION
ROW - FINAL APRON (AFTER POUR) 05/14/2020 APPROVED RGROSS
ROW - STORMWATER FINAL 05/14/2020 Disapproved - NO FEE RGROSS
Note: Port-0-potty NEEDS REMOVED FROM THE ROW AND SODDED IF SOD IS DEAD.
ROW FIELD SURVEY /GRADING CERTIFICATION 05/12/2020 APPROVED RGROSS
FINAL SURVEY (OFFICE USE ONLY) 05/12/2020 APPROVED RGROSS
ELECTRIC - EARLY POWER 05/07/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASE POWER 11:45
ELECTRIC - EARLY POWER 04/29/2020 Disapproved -FEE REQUIRED RMARTIN
Note: POWER CAN NOT BE HOOKED UP TO HOME UNTIL EARLY POWER IS PASSED, THAT MEANS CONDUCTORS NEED TO BE OFF LOAD SIDE OF DISCONNECT. LIGHTS ARE ON
ROW- PRE-APRON (PRE-POUR) 04/29/2020 APPROVED - AS NOTED RGROSS
Note: ON SITE WITH SUPER WHO IS TO RAISE THE FACE BOARD 1 INCH HIGHER OVER THE ROAD EDGE. HEAVY RAIN IN THE FORECAST TONIGHT. DOUBLE CHECK ELEVATIONS BEFORE POURING.
ELECTRIC - EARLY POWER 04/28/2020 Disapproved - NO FEE RMARTIN
Note: ELECTRICIAN STILL WORKING, NOT READY
GRAVITY SEWER TEST 04/23/2020 APPROVED JGIBSON
U - SEWER TIE IN 04/23/2020 APPROVED JGIBSON
LATH/BRICK/ WATER BARRIER 04/14/2020 APPROVED JCOLASANTI
PEP TANK INSTALLATION REQUEST 03/31/2020 APPROVED CSTONE
INSULATION 03/27/2020 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
ALL ROUGH 03/27/2020 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION NEED TO PHASE OUT HOT CONDUCTORS IN PANEL BOX. NEC.210.5(C)..need to seal tub trench...need to expose mastic for bath exhaust....need to staple wire hanging in kitchen....need to expose mastic for bath exhaust.
ALL ROUGH 03/26/2020 Disapproved -FEE REQUIRED JCOLASANTI
Note: THIS IS A REINSPECTION NEED TO PHASE OUT HOT CONDUCTORS IN PANEL BOX. NEC.210.5(C)..need to seal tub trench...need to expose mastic for bath exhaust....need to staple wire hanging in kitchen....need to expose mastic for bath exhaust.
INSULATION 03/24/2020 CANCELLED BY APPLICANT JCOLASANTI
ALL ROUGH 03/24/2020 Disapproved -FEE REQUIRED JCOLASANTI
Note: NEED TO PHASE OUT HOT CONDUCTORS IN PANEL BOX. NEC.210.5(C)..need to strap wires 12'" from boxes...need to seal tub trench...need to expose mastic for bath exhaust.
ELECTRIC-TUG 03/20/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 10:30
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/12/2020 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION need to do truss engineering..nail strap truss R09 rear porch
ROOF VALLEY & METAL 03/12/2020 APPROVED JCOLASANTI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/04/2020 Disapproved -FEE REQUIRED JCOLASANTI
Note: need to do truss engineering..nail strap truss R09 rear porch
TIE BEAM / LINTEL 02/12/2020 APPROVED JCOLASANTI
FOUND SURVEY APPROVED (OFFICE) 02/11/2020 APPROVED TBAKER
MONOLITHIC SLAB 01/28/2020 APPROVED JCOLASANTI
PLUMBING 1ST ROUGH UNDERGROUND 01/22/2020 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 01/21/2020 Disapproved -FEE REQUIRED JGIBSON
Note: MUST HAVE STAMPED PLANS AND PLUMBING RISER ON SITE FOR INSPECTION
WATER METER INSTALLATION REQUEST 01/16/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 02/07/2020 02/11/2020
Note: Released By: TBAKER
ENGIN1 HOLD 01/31/2020 01/31/2020
Note: Held By: TBAKER Please show garage slab elevation on foundation survey
SWALE COMPLETE 09/24/2019 10/28/2019
Note: Released By: TBAKER
BLD COMPLETE 09/17/2019 09/24/2019
Note: Released By: MGARRETT
CUSVC COMPLETE 09/17/2019 09/19/2019
Note: Released By: AROSCOE
ELEC COMPLETE 09/17/2019 09/19/2019
Note: Released By: JMUNSON
ENGIN1 COMPLETE 09/17/2019 09/24/2019
Note: Released By: TBAKER
LOCATE COMPLETE 09/17/2019 09/19/2019
Note: Released By: CSTONE
MECH COMPLETE 09/17/2019 09/24/2019
Note: Released By: MGARRETT
PLUM COMPLETE 09/17/2019 09/24/2019
Note: Released By: MGARRETT
SW1 COMPLETE 09/17/2019 09/18/2019
Note: Released By: JMUNSON
UD1 COMPLETE 09/17/2019 09/20/2019
Note: Released By: AHALL
ZON COMPLETE 09/17/2019 09/18/2019
Note: Released By: ELENS

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 06/02/2020
CONTRACTOR CHANGE ¤40.00 05/06/2020
REINSPECTION FEE ¤40.00 05/06/2020
REINSPECTION FEE ¤40.00 05/06/2020
REINSPECTION FEE ¤40.00 05/06/2020
REINSPECTION FEE ¤40.00 05/06/2020
METER - DEPOSIT ¤60.00 10/28/2019
WATER- TURN ON ¤25.00 10/28/2019
ADMIN FEE ¤20.00 10/28/2019
CONNECTION FEES ¤985.25 10/28/2019
ELECTRIC FEE ¤208.20 10/28/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 10/28/2019
IMPACT FEE FIRE ¤223.38 10/28/2019
IMPACT FEE PARKS ¤849.24 10/28/2019
IMPACT FEE SCHOOL ¤3,600.00 10/28/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 10/28/2019
MECHANICAL FEE ¤208.20 10/28/2019
WATER -IRRIGATION INSPECTION ¤25.00 10/28/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 10/28/2019
PLAN CHECK FEE ¤98.80 10/28/2019
PLUMBING FEE ¤208.20 10/28/2019
NEW RESIDENTIAL INSPECTIONS ¤494.00 10/28/2019
SITE PLAN 20 ¤20.00 10/28/2019
SURCHARGE FS 533.721 ¤11.59 10/28/2019
SURCHARGE - FS 468.631 ¤17.38 10/28/2019
STORM WATER PERMIT FEES ¤80.00 10/28/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 10/28/2019
SEWER CREDIT (¤1,147.00) 10/28/2019
SEWER INSPECTION ¤25.00 10/28/2019
SEWER CAPITAL FACILITY ¤4,515.25 10/28/2019
WATER CAPITAL FACILITY FEE ¤3,314.84 10/28/2019
Fees Total Due: ¤0.00 Total Paid: ¤15,633.19