I want to search for...
Permit #2019090588
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00380-0170 |
| CONDITIONED SPACE: 1983 sqft |
| GARAGE: 516 sqft |
| OPENED PORCH (WITH ROOF) : 106 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| Total Square Footage: 2653 sqft |
| Block: 00380 |
| Subdivision: 2191 - SECTION 23-WYNNFIELD |
| Job Phone: 407-807-0656 |
| Location Address: 7 WHITE HURST LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/28/2019 |
| NOC: RECORDED |
| Applicant name: NAVIN SUGRIM |
| Owner: DLP BRITE HOMES LLC |
|
Address 605 PALENCIA CLUB DRIVE ST AUGUSTINE, FL 32095 |
| Lot: 0170 |
| Contracted Stated Job Value: ¤135,076.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DLP BUILDERS LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
CBC1263567 (Exp: 08/31/2022) | 407-807-0656 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/22/2020 | FINAL APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION CONDENSATE DRAIN R318.5 PROTECTION AGAINST DECAY AND TRERMITES, MUST DISCHARGE AT LEAST 1FT- AWAY FROM STRUCTURE SIDEWALL 5/22/20 - Problem corrected. | |||
| BLD - BUILDING FINAL | 05/18/2020 | Disapproved - NO FEE | JCOLASANTI |
| Note: CONDENSATE DRAIN R318.5 PROTECTION AGAINST DECAY AND TRERMITES, MUST DISCHARGE AT LEAST 1FT- AWAY FROM STRUCTURE SIDEWALL | |||
| U -UTILITY RESIDENTIAL FINAL | 05/18/2020 | APPROVED - AS NOTED | LFITZGERALD |
| Note: ball valve on water meter lline upside down-UTILITY(RS) TO TAKE CARE OF | |||
| ROW - STORMWATER FINAL | 05/15/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 05/14/2020 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 05/14/2020 | Disapproved - NO FEE | RGROSS |
| Note: Port-0-potty NEEDS REMOVED FROM THE ROW AND SODDED IF SOD IS DEAD. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/12/2020 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 05/12/2020 | APPROVED | RGROSS |
| ELECTRIC - EARLY POWER | 05/07/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASE POWER 11:45 | |||
| ELECTRIC - EARLY POWER | 04/29/2020 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: POWER CAN NOT BE HOOKED UP TO HOME UNTIL EARLY POWER IS PASSED, THAT MEANS CONDUCTORS NEED TO BE OFF LOAD SIDE OF DISCONNECT. LIGHTS ARE ON | |||
| ROW- PRE-APRON (PRE-POUR) | 04/29/2020 | APPROVED - AS NOTED | RGROSS |
| Note: ON SITE WITH SUPER WHO IS TO RAISE THE FACE BOARD 1 INCH HIGHER OVER THE ROAD EDGE. HEAVY RAIN IN THE FORECAST TONIGHT. DOUBLE CHECK ELEVATIONS BEFORE POURING. | |||
| ELECTRIC - EARLY POWER | 04/28/2020 | Disapproved - NO FEE | RMARTIN |
| Note: ELECTRICIAN STILL WORKING, NOT READY | |||
| GRAVITY SEWER TEST | 04/23/2020 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 04/23/2020 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 04/14/2020 | APPROVED | JCOLASANTI |
| PEP TANK INSTALLATION REQUEST | 03/31/2020 | APPROVED | CSTONE |
| INSULATION | 03/27/2020 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 03/27/2020 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION NEED TO PHASE OUT HOT CONDUCTORS IN PANEL BOX. NEC.210.5(C)..need to seal tub trench...need to expose mastic for bath exhaust....need to staple wire hanging in kitchen....need to expose mastic for bath exhaust. | |||
| ALL ROUGH | 03/26/2020 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: THIS IS A REINSPECTION NEED TO PHASE OUT HOT CONDUCTORS IN PANEL BOX. NEC.210.5(C)..need to seal tub trench...need to expose mastic for bath exhaust....need to staple wire hanging in kitchen....need to expose mastic for bath exhaust. | |||
| INSULATION | 03/24/2020 | CANCELLED BY APPLICANT | JCOLASANTI |
| ALL ROUGH | 03/24/2020 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: NEED TO PHASE OUT HOT CONDUCTORS IN PANEL BOX. NEC.210.5(C)..need to strap wires 12'" from boxes...need to seal tub trench...need to expose mastic for bath exhaust. | |||
| ELECTRIC-TUG | 03/20/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 10:30 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/12/2020 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION need to do truss engineering..nail strap truss R09 rear porch | |||
| ROOF VALLEY & METAL | 03/12/2020 | APPROVED | JCOLASANTI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/04/2020 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: need to do truss engineering..nail strap truss R09 rear porch | |||
| TIE BEAM / LINTEL | 02/12/2020 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 02/11/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/28/2020 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/22/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/21/2020 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: MUST HAVE STAMPED PLANS AND PLUMBING RISER ON SITE FOR INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 01/16/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 02/07/2020 | 02/11/2020 |
| Note: Released By: TBAKER | |||
| ENGIN1 | HOLD | 01/31/2020 | 01/31/2020 |
| Note: Held By: TBAKER Please show garage slab elevation on foundation survey | |||
| SWALE | COMPLETE | 09/24/2019 | 10/28/2019 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 09/17/2019 | 09/24/2019 |
| Note: Released By: MGARRETT | |||
| CUSVC | COMPLETE | 09/17/2019 | 09/19/2019 |
| Note: Released By: AROSCOE | |||
| ELEC | COMPLETE | 09/17/2019 | 09/19/2019 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 09/17/2019 | 09/24/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 09/17/2019 | 09/19/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 09/17/2019 | 09/24/2019 |
| Note: Released By: MGARRETT | |||
| PLUM | COMPLETE | 09/17/2019 | 09/24/2019 |
| Note: Released By: MGARRETT | |||
| SW1 | COMPLETE | 09/17/2019 | 09/18/2019 |
| Note: Released By: JMUNSON | |||
| UD1 | COMPLETE | 09/17/2019 | 09/20/2019 |
| Note: Released By: AHALL | |||
| ZON | COMPLETE | 09/17/2019 | 09/18/2019 |
| Note: Released By: ELENS |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/02/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 05/06/2020 |
| REINSPECTION FEE | ¤40.00 | 05/06/2020 |
| REINSPECTION FEE | ¤40.00 | 05/06/2020 |
| REINSPECTION FEE | ¤40.00 | 05/06/2020 |
| REINSPECTION FEE | ¤40.00 | 05/06/2020 |
| METER - DEPOSIT | ¤60.00 | 10/28/2019 |
| WATER- TURN ON | ¤25.00 | 10/28/2019 |
| ADMIN FEE | ¤20.00 | 10/28/2019 |
| CONNECTION FEES | ¤985.25 | 10/28/2019 |
| ELECTRIC FEE | ¤208.20 | 10/28/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 10/28/2019 |
| IMPACT FEE FIRE | ¤223.38 | 10/28/2019 |
| IMPACT FEE PARKS | ¤849.24 | 10/28/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/28/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 10/28/2019 |
| MECHANICAL FEE | ¤208.20 | 10/28/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/28/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/28/2019 |
| PLAN CHECK FEE | ¤98.80 | 10/28/2019 |
| PLUMBING FEE | ¤208.20 | 10/28/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤494.00 | 10/28/2019 |
| SITE PLAN 20 | ¤20.00 | 10/28/2019 |
| SURCHARGE FS 533.721 | ¤11.59 | 10/28/2019 |
| SURCHARGE - FS 468.631 | ¤17.38 | 10/28/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/28/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 10/28/2019 |
| SEWER CREDIT | (¤1,147.00) | 10/28/2019 |
| SEWER INSPECTION | ¤25.00 | 10/28/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 10/28/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 10/28/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,633.19 |