Permit #2019090593
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00730-0330 |
| CONDITIONED SPACE: 1983 sqft |
| GARAGE: 516 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| OPENED PORCH (WITH ROOF) : 106 sqft |
| Total Square Footage: 2653 sqft |
| Block: 00730 |
| Subdivision: 2153 - SECTION 26-PINE GROVE |
| Job Phone: 407-807-0656 |
| Location Address: 11 PITTMAN DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/24/2019 |
| NOC: RECORDED |
| Applicant name: NAVIN SUGRIM |
| Owner: DLP BRITE HOMES LLC |
|
Address 605 PALENCIA CLUB DRIVE ST AUGUSTINE, FL 32095 |
| Lot: 0330 |
| Contracted Stated Job Value: ¤135,076.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DLP BUILDERS LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
CBC1263567 (Exp: 08/31/2022) | 407-807-0656 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/27/2020 | FINAL APPROVED | MMESSER |
| U -UTILITY RESIDENTIAL FINAL | 05/22/2020 | FINAL APPROVED | MBACON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/21/2020 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 05/21/2020 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 05/21/2020 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 05/21/2020 | APPROVED - AS NOTED | RGROSS |
| Note: DRAINAGE CONVEYANCE ALONG THE LEFT SIDE PROPERTY LINE FLOWS INSIDE THE PROPERTY AROUND THE PEP TANK. | |||
| ELECTRIC - EARLY POWER | 03/31/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:20 am | |||
| ROW- PRE-APRON (PRE-POUR) | 03/12/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION IT IS THE BUILDER’S RESPONSIBILITY: TO RECHECK ELEVATIONS AND PIPE SIZE, TO INSURE THAT AN OBSTRUCTION DOES NOT EXIST UPSTREAM AND OR DOWNSTREAM, THAT THE CULVERT PIPE IS SET TO AND OR FOLLOWS THE SWALE PLAN, FORM THE DRIVEWAY TO THE APPROVEDSITE PLAN AND FOLLOW THE APPROVED DRIVEWAY DETAIL SHEET PROVIDED BY THE CITY OF PALM COAST. PRIOR TO PLACEMENT OF CONCRETE. ON SITE WITH CONTRACTOR RIGHT SIDE FORM BOARD ALOND DEGE OF PAVEMENT NEEDS TO BE MOVED FURTHER AWAY FROM THE ROAD | |||
| ROW- PRE-APRON (PRE-POUR) | 03/11/2020 | Disapproved -FEE REQUIRED | RGROSS |
| Note: CULVERT OUT OF TOLERANCE ON THE LEFT SIDE. SEE SWALE PLAN | |||
| U - SEWER TIE IN | 03/09/2020 | APPROVED | JCOLASANTI |
| GRAVITY SEWER TEST | 03/09/2020 | APPROVED | JCOLASANTI |
| PEP TANK INSTALLATION REQUEST | 02/24/2020 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 02/07/2020 | APPROVED | JCOLASANTI |
| INSULATION | 01/27/2020 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 01/24/2020 | Disapproved - NO FEE | FWILLIS |
| Note: Water lines not fire caulked going through the top plate. Check all. | |||
| ALL ROUGH | 01/22/2020 | APPROVED - AS NOTED | JCOLASANTI |
| Note: Crown vent prohibited..P3106.3 a vent shall not be installed whiten two pipe diameters of the trap weir | |||
| ROOF VALLEY & METAL | 01/14/2020 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 01/10/2020 | Disapproved -FEE REQUIRED | WMILLER |
| Note: this was assigned to inspector JD but i was closer so I took the inspection. FLASHING, BASE AND COUNTER FLASHING, R905.2.8.1 (1 – 3), 4in X 4in L-FLASHING AT WALL ROOF INTERSECTIONS MUST BE SET IN APPROVED FLASHING CEMENT AND SET FLUSH TO THE BASE OF THE WALL AND OVER THE UNDERLAYMENT. BOTH HORIZONTAL AND VERTICLE METAL FLANGES SHALL BE FASTENED 6in OC WITH APPROVED FASTENERS. ALL LAPS SHALL BE A MINIMUM OF 4in. FULLY SEALED IN APPROVED FLASHING CEMENTTHE ENTIRE EDGE OF THE HORIZONTAL FLANGE SHALL BE SEALED COVERING ALL NAIL PENITRATIONS WITH APPROVED FLASHING CEMENT AND MEMBRANE. FLASHING SHALL START AT THE LOWER PROTION OF THE ROOF TO ENSURE WATER-SHEDDING CAPABILITIES OF | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/06/2020 | APPROVED | JCOLASANTI |
| ELECTRIC-TUG | 12/27/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 10:45 | |||
| TIE BEAM / LINTEL | 12/18/2019 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 12/16/2019 | APPROVED | CTROHA |
| MONOLITHIC SLAB | 12/05/2019 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/03/2019 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 11/12/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 12/13/2019 | 12/16/2019 |
| Note: Released By: CTROHA Foundation Survey | |||
| SWALE | COMPLETE | 09/24/2019 | 10/16/2019 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 09/17/2019 | 09/24/2019 |
| Note: Released By: MGARRETT | |||
| CUSVC | COMPLETE | 09/17/2019 | 09/19/2019 |
| Note: Released By: AROSCOE | |||
| ELEC | COMPLETE | 09/17/2019 | 09/19/2019 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 09/17/2019 | 09/24/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 09/17/2019 | 09/19/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 09/17/2019 | 09/24/2019 |
| Note: Released By: MGARRETT | |||
| PLUM | COMPLETE | 09/17/2019 | 09/24/2019 |
| Note: Released By: MGARRETT | |||
| SW1 | COMPLETE | 09/17/2019 | 09/18/2019 |
| Note: Released By: JMUNSON | |||
| UD1 | COMPLETE | 09/17/2019 | 09/20/2019 |
| Note: Released By: AHALL | |||
| ZON | COMPLETE | 09/17/2019 | 09/18/2019 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/13/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 06/02/2020 |
| REINSPECTION FEE | ¤40.00 | 02/21/2020 |
| 10/24/2019 | ||
| METER - DEPOSIT | ¤60.00 | 10/24/2019 |
| WATER- TURN ON | ¤25.00 | 10/24/2019 |
| ADMIN FEE | ¤20.00 | 10/24/2019 |
| CONNECTION FEES | ¤985.25 | 10/24/2019 |
| ELECTRIC FEE | ¤208.20 | 10/24/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 10/24/2019 |
| IMPACT FEE FIRE | ¤223.38 | 10/24/2019 |
| IMPACT FEE PARKS | ¤849.24 | 10/24/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/24/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 10/24/2019 |
| MECHANICAL FEE | ¤208.20 | 10/24/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/24/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/24/2019 |
| PLAN CHECK FEE | ¤98.80 | 10/24/2019 |
| PLUMBING FEE | ¤208.20 | 10/24/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤494.00 | 10/24/2019 |
| SITE PLAN 20 | ¤20.00 | 10/24/2019 |
| SURCHARGE FS 533.721 | ¤11.59 | 10/24/2019 |
| SURCHARGE - FS 468.631 | ¤17.38 | 10/24/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/24/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 10/24/2019 |
| SEWER CREDIT | (¤1,147.00) | 10/24/2019 |
| SEWER INSPECTION | ¤25.00 | 10/24/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 10/24/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 10/24/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,513.19 |