I want to search for...

Permit #2019090594

Permit Details

Status: COED

Parcel Id: 07-11-31-7026-00730-0320
CONDITIONED SPACE: 1779 sqft
GARAGE: 451 sqft
OPENED PORCH (WITH ROOF) : 40 sqft
OPENED PORCH (WITH ROOF) : 110 sqft
Total Square Footage: 2380 sqft
Block: 00730
Subdivision: 2153 - SECTION 26-PINE GROVE
Job Phone: 407-807-0656
Location Address: 13 PITTMAN DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/24/2019
NOC: RECORDED
Applicant name: NAVIN SUGRIM
Owner: DLP BRITE HOMES LLC

Address

605 PALENCIA CLUB DRIVE

ST AUGUSTINE, FL 32095

Lot: 0320
Contracted Stated Job Value: ¤129,200.00
Job Description: single family residence
Type: CN

Contractor

DLP BUILDERS LLC
Status Location Address State License Number Phone
CANCEL

7345 GREENBRIAR PKWY

ORLANDO, FL 32819

CBC1263567 (Exp: 08/31/2022) 407-807-0656

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/03/2020 FINAL APPROVED MMESSER
U -UTILITY RESIDENTIAL FINAL 06/03/2020 FINAL APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 06/02/2020 APPROVED MMAJEWSKI
FINAL SURVEY (OFFICE USE ONLY) 06/02/2020 APPROVED MMAJEWSKI
Note: THIS IS A REINSPECTION
FINAL SURVEY (OFFICE USE ONLY) 05/22/2020 Disapproved - NO FEE KHOWELL
Note: SEE FINAL SURVEY MARK UP COMMENTS
ROW - STORMWATER FINAL 05/21/2020 APPROVED RGROSS
ROW - FINAL APRON (AFTER POUR) 05/21/2020 APPROVED RGROSS
ELECTRIC - EARLY POWER 03/31/2020 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:20 am
ROW- PRE-APRON (PRE-POUR) 03/11/2020 APPROVED RGROSS
Note: READY TO POUR
U - SEWER TIE IN 03/09/2020 APPROVED JCOLASANTI
GRAVITY SEWER TEST 03/09/2020 APPROVED JCOLASANTI
PEP TANK INSTALLATION REQUEST 02/19/2020 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 02/10/2020 APPROVED FWILLIS
INSULATION 01/29/2020 APPROVED JDELBONIS
ALL ROUGH 01/27/2020 APPROVED - AS NOTED JCOLASANTI
Note: need 5'head test on waste line....smoke detector needs to be 10' from bedroom (check distance of detector in hallway)
ROOF VALLEY & METAL 01/14/2020 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
ROOF VALLEY & METAL 01/10/2020 Disapproved -FEE REQUIRED WMILLER
Note: this was assigned to inspector JD but i was closer so I took the inspection. FLASHING, BASE AND COUNTER FLASHING, R905.2.8.1 (1 – 3), 4in X 4in L-FLASHING AT WALL ROOF INTERSECTIONS MUST BE SET IN APPROVED FLASHING CEMENT AND SET FLUSH TO THE BASE OF THE WALL AND OVER THE UNDERLAYMENT. BOTH HORIZONTAL AND VERTICLE METAL FLANGES SHALL BE FASTENED 6in OC WITH APPROVED FASTENERS. ALL LAPS SHALL BE A MINIMUM OF 4in. FULLY SEALED IN APPROVED FLASHING CEMENTTHE ENTIRE EDGE OF THE HORIZONTAL FLANGE SHALL BE SEALED COVERING ALL NAIL PENITRATIONS WITH APPROVED FLASHING CEMENT AND MEMBRANE. FLASHING SHALL START AT THE LOWER PROTION OF THE ROOF TO ENSURE WATER-SHEDDING CAPABILITIES OF
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/08/2020 APPROVED - AS NOTED JCOLASANTI
Note: remove shinners look throughout
ELECTRIC-TUG 12/27/2019 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 10:45
TIE BEAM / LINTEL 12/18/2019 APPROVED JCOLASANTI
FOUND SURVEY APPROVED (OFFICE) 12/16/2019 APPROVED CTROHA
MONOLITHIC SLAB 12/05/2019 APPROVED JCOLASANTI
PLUMBING 1ST ROUGH UNDERGROUND 12/03/2019 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 11/12/2019 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 12/13/2019 12/16/2019
Note: Released By: CTROHA Foundation Survey
SWALE COMPLETE 09/24/2019 10/16/2019
Note: Released By: TBAKER
BLD COMPLETE 09/17/2019 09/24/2019
Note: Released By: MGARRETT
CUSVC COMPLETE 09/17/2019 09/19/2019
Note: Released By: AROSCOE
ELEC COMPLETE 09/17/2019 09/19/2019
Note: Released By: JMUNSON
ENGIN1 COMPLETE 09/17/2019 09/24/2019
Note: Released By: TBAKER
LOCATE COMPLETE 09/17/2019 09/19/2019
Note: Released By: CSTONE
MECH COMPLETE 09/17/2019 09/24/2019
Note: Released By: MGARRETT
PLUM COMPLETE 09/17/2019 09/24/2019
Note: Released By: MGARRETT
SW1 COMPLETE 09/17/2019 09/18/2019
Note: Released By: JMUNSON
UD1 COMPLETE 09/17/2019 09/20/2019
Note: Released By: AHALL
ZON COMPLETE 09/17/2019 09/18/2019
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 05/06/2020
REINSPECTION FEE ¤40.00 02/21/2020
NEW RESIDENTIAL INSPECTIONS ¤444.00 10/24/2019
SITE PLAN 20 ¤20.00 10/24/2019
SURCHARGE FS 533.721 ¤10.64 10/24/2019
SURCHARGE - FS 468.631 ¤15.95 10/24/2019
STORM WATER PERMIT FEES ¤80.00 10/24/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 10/24/2019
SEWER CREDIT (¤1,147.00) 10/24/2019
SEWER INSPECTION ¤25.00 10/24/2019
SEWER CAPITAL FACILITY ¤4,515.25 10/24/2019
WATER CAPITAL FACILITY FEE ¤3,314.84 10/24/2019
ELECTRIC FEE ¤193.20 10/24/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 10/24/2019
IMPACT FEE FIRE ¤223.38 10/24/2019
IMPACT FEE PARKS ¤849.24 10/24/2019
IMPACT FEE SCHOOL ¤3,600.00 10/24/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 10/24/2019
MECHANICAL FEE ¤193.20 10/24/2019
WATER -IRRIGATION INSPECTION ¤25.00 10/24/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 10/24/2019
PLAN CHECK FEE ¤88.80 10/24/2019
PLUMBING FEE ¤193.20 10/24/2019
METER - DEPOSIT ¤60.00 10/24/2019
WATER- TURN ON ¤25.00 10/24/2019
ADMIN FEE ¤20.00 10/24/2019
CONNECTION FEES ¤985.25 10/24/2019
Fees Total Due: ¤0.00 Total Paid: ¤15,365.81