Permit #2019090998
Permit Details
Status: FINAL
| Parcel Id: 44-11-31-0000-01010-0030 |
| Block: 01010 |
| Subdivision: - |
| Job Phone: (386)671-2727 |
| Location Address: 360 PALM COAST PKWY NE |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 10/23/2019 |
| NOC: RECORDED |
| Applicant name: JOSEPH GEORGE WEBER |
| Owner: ANCHOR REAL ESTATE HOLDINGS LLC |
|
Address 160 COSTA BLANCA RD ST AUGUSTINE, FL 32095 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤198,775.00 |
| Job Description: SITE WORK - REHABILITATION MEDICAL BUILDING |
| Type: CN |
Contractor
JD WEBER CONSTRUCTION CO.
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
150 BUSINESS CENTER DRIVE ORMOND BEACH, FL 32174 |
CUC025621 (Exp: 08/31/2026) | (386)671-2727 | (386)671-2471 |
Inspection History
| Type | Request Date | Result | Inspector |
| MAINT BOND ACCEPTANCE (OFFICE) | 07/01/2020 | APPROVED | DRAMIREZ |
| Note: Maintenance bond accepted under application #4411 | |||
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | 06/30/2020 | APPROVED | LFITZGERALD |
| Note: Approved under application #4409 | |||
| IRRIGATION AFFIDAVIT | 06/29/2020 | APPROVED | BDAWSON |
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 06/29/2020 | APPROVED | BDAWSON |
| LDSC- LANDSCAPE FINAL | 06/29/2020 | APPROVED | BDAWSON |
| UC-FINAL SITE INSPECTION | 06/29/2020 | FINAL APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION | |||
| U - UTILITY COMMERCIAL FINAL | 06/29/2020 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL INSPECTION | 06/29/2020 | APPROVED - AS NOTED | LFITZGERALD |
| Note: 2 areas concerning for Beth being soddded while leaving the site;other area where loose soils were on the bank where a Sabal was placed to be placed bace as a tree well with some sod behind per conversation with Ryan-Verde Go- since his workers were on the way after i left the site | |||
| UC-FINAL SITE INSPECTION | 06/26/2020 | CANCELLED BY APPLICANT | LFITZGERALD |
| BLD- ADA VEHICULAR WAY | 06/26/2020 | Approval - Private Provider | JBODEN |
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 06/26/2020 | Approval - Private Provider | JBODEN |
| U-WATER MAIN DISINFECTION SAMPLING | 06/25/2020 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -report resulted absent for bacti sample taken by Chad at kitchen sink | |||
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 06/24/2020 | FINAL APPROVED | LFITZGERALD |
| LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) | 06/23/2020 | APPROVED - AS NOTED | BDAWSON |
| Note: - Cleanout debris from off site ditch near tree removals, stabalize bank and treat stump - Sod or mulch all bare dirt areas. - Line edge of new sidewalk with at least one row of sod. - Replace (1) Society Garlic at sign. - Sod small patch of weeds in front area of sod. - If any sod has died prior to final inspection it will need to be replaced. - Replace damaged Lantana at corner of building. - Rake up shredded tree mulch in areas where silt fence was located. - Spread pinestraw out evenly/address bare areas in front ROW area cleared for utility line. - Add shrub/tree to fill in hole between parking lot and multifamily residential property adjacent. - Update sign location and landscape beds in as-built plans (including sod/mulch areas). Provide updated mitigation/removal sheet and calculations. | |||
| LDSC-PRE-PLANTING TREE QUALITY | 06/23/2020 | APPROVED | BDAWSON |
| U-WATER MAIN DISINFECTION SAMPLING | 06/22/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: sample taken by Chad at kitchen sink | |||
| UC-SUBSTANTIAL WALK-THRU | 06/22/2020 | APPROVED | LFITZGERALD |
| UC- PRELIMINARY AS-BUILTS | 06/22/2020 | APPROVED - AS NOTED | LFITZGERALD |
| Note: list of commments taken by Chad(J D Weber)-will send Me copy via e-mail before going thru city | |||
| UROW -FINAL GRADE PRIOR SOD | 06/19/2020 | FINAL APPROVED | LFITZGERALD |
| U-WATER SERVICE INSTALLATION | 06/19/2020 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION-water tied now in bldg. | |||
| BLD- ADA PARKING | 06/19/2020 | APPROVED | FWILLIS |
| UROW - FINAL DRAINAGE | 06/19/2020 | FINAL APPROVED | LFITZGERALD |
| LDSC-PRE-CLEARING | 06/18/2020 | APPROVED | BDAWSON |
| Note: inspection for tree removal within right-of-way | |||
| LDSC-TREE BARRICADE | 06/18/2020 | APPROVED | BDAWSON |
| Note: THIS IS A REINSPECTION | |||
| PROJECT CLOSE OUT MEETING (386-986-3750) | 06/18/2020 | APPROVED | LFITZGERALD |
| U-WATER METER INSTALLATION/VERIFICATION | 06/17/2020 | APPROVED | LFITZGERALD |
| Note: Stephanie informed | |||
| UROW -FINAL GRADE PRIOR SOD | 06/17/2020 | APPROVED | LFITZGERALD |
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 06/17/2020 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION | |||
| UROW - FINAL DRAINAGE | 06/17/2020 | APPROVED | LFITZGERALD |
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 06/15/2020 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -bf pad now placed THIS IS A REINSPECTION -1" bf now installed | |||
| UC-MOT MAINTENANCE OF TRAFFIC | 06/11/2020 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -not required anymore THIS IS A REINSPECTION -ROW sidewalk now placed with concrete THIS IS A REINSPECTION -modified 613 index used ,same as last time,due to excavating for sidewalk ramps,unloading old s/w and to provide a means for pedestrians to travel thru as new sidewalk is constucted asphalt being placed and a lane clousure was set up to place the construction entrance | |||
| UC-DRAINAGE STRUCT PLACMNT | 06/10/2020 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -concrete flume now placed THIS IS A REINSPECTION -2MES at entrance now placed with concrete THIS IS A REINSPECTION -overflow for pond placed w/concrete | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 06/10/2020 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION bike pad placed THIS IS A REINSPECTION ROW sidewalks now placed with concrete;east transition done with approx. 10ft. to tie into non ADA existing THIS IS A REINSPECTION -due to rains cancel ROW sidewalks/ramps THIS IS A REINSPECTION -bldg sidewalk THIS IS A REINSPECTION arear being rough graded at asphalt interphase sidewalk surveyed at bldg area | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 06/09/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION ROW sidewalks now placed with concrete;east transition done with approx. 10ft. to tie into non ADA existing THIS IS A REINSPECTION -due to rains cancel ROW sidewalks/ramps THIS IS A REINSPECTION -bldg sidewalk THIS IS A REINSPECTION arear being rough graded at asphalt interphase sidewalk surveyed at bldg area | |||
| UROW- CURBING & GUTTER | 06/09/2020 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -FDOT D curbs now placedplus misc. areas THIS IS A REINSPECTION -trying to finish misssing parts in parking area THIS IS A REINSPECTION -parking area for D curb due to rains | |||
| UC-DRAINAGE STRUCT PLACMNT | 06/09/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -2MES at entrance now placed with concrete THIS IS A REINSPECTION -overflow for pond placed w/concrete | |||
| UC-MOT MAINTENANCE OF TRAFFIC | 06/09/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -ROW sidewalk now placed with concrete THIS IS A REINSPECTION -modified 613 index used ,same as last time,due to excavating for sidewalk ramps,unloading old s/w and to provide a means for pedestrians to travel thru as new sidewalk is constucted asphalt being placed and a lane clousure was set up to place the construction entrance | |||
| UC-MOT MAINTENANCE OF TRAFFIC | 06/08/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -modified 613 index used ,same as last time,due to excavating for sidewalk ramps,unloading old s/w and to provide a means for pedestrians to travel thru asphalt being placed and a lane clousure was set up to place the construction entrance | |||
| UC-DRAINAGE STRUCT PLACMNT | 06/08/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -overflow for pond placed w/concrete | |||
| UROW- CURBING & GUTTER | 06/08/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -trying to finish misssing parts in parking area THIS IS A REINSPECTION -parking area for D curb due to rains | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 06/08/2020 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: THIS IS A REINSPECTION -due to rains cancel ROW sidewalks/ramps THIS IS A REINSPECTION -bldg sidewalk THIS IS A REINSPECTION arear being rough graded at asphalt interphase sidewalk surveyed at bldg area | |||
| UROW- CURBING & GUTTER | 06/05/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -parking area for D curb due to rains | |||
| UC-DRAINAGE STRUCT PLACMNT | 06/05/2020 | CANCELLED BY APPLICANT | LFITZGERALD |
| UROW- CURBING & GUTTER | 06/04/2020 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: due to rains | |||
| UC-CONSTRUCTION ENTRANCE | 06/04/2020 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION-now with asphalt | |||
| UC-TRAF - MAINT OF TRAFFIC | 06/04/2020 | APPROVED - AS NOTED | LFITZGERALD |
| Note: not required today for concrete ramps that are not being const. due to rains. This inspection is similiar to UC-MOT which will be used from now on | |||
| UC-MOT MAINTENANCE OF TRAFFIC | 06/03/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: asphalt being placed and a lane clousure was set up to place the construction entrance | |||
| UC-ASPHALT PRE PLACEMENT | 06/03/2020 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION -now ROW/main pkg areas being rough to fine graded pkg lot area ok | |||
| UC-ASPHALT PRE PLACEMENT | 06/02/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -now ROW/main pkg areas being rough to fine graded pkg lot area ok | |||
| UC-ASPHALT PRE PLACEMENT | 06/01/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: pkg lot area ok | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 05/29/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -bldg sidewalk THIS IS A REINSPECTION arear being rough graded at asphalt interphase sidewalk surveyed at bldg area | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 05/28/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION arear being rough graded at asphalt interphase sidewalk surveyed at bldg area | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 05/28/2020 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -pipe for mes's at entranvce noe installed stat placementof 15"ads at entrance | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 05/28/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -1" bf now installed | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 05/27/2020 | PARTIALLY APPROVED | LFITZGERALD |
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 05/27/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: stat placementof 15"ads at entrance | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 05/27/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: sidewalk surveyed at bldg area | |||
| UC - PROJECT STATUS | 05/20/2020 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -pond exfiltration now completed THIS IS A REINSPECTION day 2 with 1 side(north) 90%complete acccording to detail from PE JKellog THIS IS A REINSPECTION -side bank filtration for pond as designed by SJWMD now being installled(using a black-gold media)between 2layers of 57 stone that leads to a underdrain pipe where water will be discharged to existing north-south ditch THIS IS A REINSPECTION-shoudof been noted earlier-geofabric with stone placed correctly | |||
| UC - PROJECT STATUS | 05/15/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -side bank filtration for pond as designed by SJWMD now being installled(using a black-gold media)between 2layers of 57 stone that leads to a underdrain pipe where water will be discharged to existing north-south ditch THIS IS A REINSPECTION-shoudof been noted earlier-geofabric with stone placed correctly | |||
| UC - PROJECT STATUS | 05/15/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION day 2 with 1 side(north) 90%complete acccording to detail from PE JKellog THIS IS A REINSPECTION -side bank filtration for pond as designed by SJWMD now being installled(using a black-gold media)between 2layers of 57 stone that leads to a underdrain pipe where water will be discharged to existing north-south ditch THIS IS A REINSPECTION-shoudof been noted earlier-geofabric with stone placed correctly | |||
| UC - PROJECT STATUS | 04/07/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION-shoudof been noted earlier-geofabric with stone placed correctly | |||
| U-GRAVITY SEWER INSTALL/TESTING | 02/18/2020 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION | |||
| U-GRAVITY SEWER INSTALL/TESTING | 02/12/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 6inch from builging now tie into 1 piece of 8in. 8IN TAP to stub also installed | |||
| LDSC-TREE BARRICADE | 02/12/2020 | Disapproved -FEE REQUIRED | BDAWSON |
| Note: - Tree protection fence needs to be re-installed in City right-of-way. The two areas of fencing need to be connected with additional fencing so the entire path for the utilities is protected. | |||
| UC - PROJECT STATUS | 02/11/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION-sewer stub was located today and planning to tie in once all required parts are in | |||
| LDSC-PRE-CLEARING | 02/06/2020 | CANCELLED BY INSPECTOR | BDAWSON |
| UC - PROJECT STATUS | 01/31/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION-met with Chad and showed him where possible sewer stub is located based on CITYTV work done in the AM which put it at a 45degreee angle towards the sidewAlk from the original plan location. | |||
| UC - PROJECT STATUS | 01/28/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: ROOT PRUNING only done around proposed building footprint. SOME AIR SPADING WAS PERFORMD WHERE recommended by arborist per on site meeting and initial removal of dredge material removed and geo with rock starting to be placed | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 01/24/2020 | PARTIALLY APPROVED | LFITZGERALD |
| UC-CONSTRUCTION ENTRANCE | 01/09/2020 | PARTIALLY APPROVED | LFITZGERALD |
| U-WATER SERVICE INSTALLATION | 01/07/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 1 in saddle/corp on 12in main for future | |||
| PLAN - PRE-CON 386-986-3750 | 11/18/2019 | APPROVED | LFITZGERALD |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 09/26/2019 | 10/01/2019 |
| Note: Released By: CMORALES | |||
| PLLA | COMPLETE | 09/26/2019 | 09/27/2019 |
| Note: Released By: BDAWSON | |||
| UD1 | COMPLETE | 09/26/2019 | 10/02/2019 |
| Note: Released By: CJOHNSON |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| INSPECTION 40 | ¤640.00 | 10/23/2019 |
| PERMIT FEE | ¤125.00 | 10/23/2019 |
| SITE PLAN 20 | ¤20.00 | 10/23/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤785.00 |