I want to search for...

Permit #2019100096

Permit Details

Status: COED

Parcel Id: 07-11-31-7035-01420-0020
CONDITIONED SPACE: 1983 sqft
GARAGE: 516 sqft
OPENED PORCH (WITH ROOF) : 106 sqft
OPENED PORCH (WITH ROOF) : 48 sqft
Total Square Footage: 2653 sqft
Block: 01420
Subdivision: 2172 - SECTION 35-BELLE TERRE
Job Phone: 407-807-0656
Location Address: 210 BIRCHWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/28/2019
NOC: RECORDED
Applicant name: NAVIN SUGRIM
Owner: DLP BRITE HOMES LLC

Address

605 PALENCIA CLUB DRIVE

ST AUGUSTINE, FL 32095

Lot: 0020
Contracted Stated Job Value: ¤135,076.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

DLP BUILDERS LLC
Status Location Address State License Number Phone
CANCEL

7345 GREENBRIAR PKWY

ORLANDO, FL 32819

CBC1263567 (Exp: 08/31/2022) 407-807-0656

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/15/2020 FINAL APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 05/14/2020 CANCELLED BY APPLICANT JCOLASANTI
U -UTILITY RESIDENTIAL FINAL 05/14/2020 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 05/13/2020 APPROVED RGROSS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION STILL A LOT OF TRASH IN THE VACANTS ALL AROUND THE PROPERTY. BAHIA SOD NEEDED IN THE ROW WHERE THE DUMPSTER WAS REMOVED. SOME CORRECTIONS MADE BUT SWALE WHERE THE DUMPSTER WAS PLACED NEEDS SODDED. PHOTO ATTACHED.
ROW - STORMWATER FINAL 05/12/2020 Disapproved - NO FEE RGROSS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION STILL A LOT OF TRASH IN THE VACANTS ALL AROUND THE PROPERTY. BAHIA SOD NEEDED IN THE ROW WHERE THE DUMPSTER WAS REMOVED. SOME CORRECTIONS MADE BUT SWALE WHERE THE DUMPSTER WAS PLACED NEEDS SODDED. PHOTO ATTACHED.
ROW - STORMWATER FINAL 05/11/2020 Disapproved - NO FEE RGROSS
Note: THIS IS A REINSPECTION STILL A LOT OF TRASH IN THE VACANTS ALL AROUND THE PROPERTY. BAHIA SOD NEEDED IN THE ROW WHERE THE DUMPSTER WAS REMOVED.
ROW - STORMWATER FINAL 05/08/2020 Disapproved - NO FEE RGROSS
Note: 4 INCH BY 8 FT PVC PIPE NEEDS REMOVED FROM THE SWALE ON THE FRONT LEFT PROPERTY LINE. TRASH IN THE VACANT NEAR THE RIGHT FRONT PROPERTY LINE NEEDS REMOVED AND MORE SOD ON THE BARE EARTH AREA OF SWALE WHERE THE DUMPSTER WAS PULLED OUT.
ROW - FINAL APRON (AFTER POUR) 05/08/2020 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 05/07/2020 APPROVED RGROSS
FINAL SURVEY (OFFICE USE ONLY) 05/07/2020 APPROVED RGROSS
ELECTRIC - EARLY POWER 04/23/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 1:15
GRAVITY SEWER TEST 04/16/2020 APPROVED JGIBSON
U - SEWER TIE IN 04/16/2020 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 04/15/2020 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION NOT READY FOR INSPECTION. NOT FORMED YET. ON SITE WITH CONTRACTOR TO BURY PIPE ONLY 1/2 WAY NOT 3/4 AS SET.
ROW- PRE-APRON (PRE-POUR) 04/14/2020 Disapproved - NO FEE RGROSS
Note: NOT READY FOR INSPECTION. NOT FORMED YET.
LATH/BRICK/ WATER BARRIER 03/23/2020 APPROVED JCOLASANTI
PEP TANK INSTALLATION REQUEST 03/19/2020 APPROVED CSTONE
INSULATION 03/11/2020 APPROVED JCOLASANTI
ALL ROUGH 03/06/2020 APPROVED - AS NOTED JCOLASANTI
Note: need to fill completely fill cells rear of house, can still see steel, will check at insulation
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/20/2020 APPROVED JCOLASANTI
ROOF VALLEY & METAL 02/20/2020 APPROVED JCOLASANTI
TIE BEAM / LINTEL 02/07/2020 APPROVED JCOLASANTI
ELECTRIC-TUG 02/07/2020 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 10:50 am
FOUND SURVEY APPROVED (OFFICE) 02/06/2020 APPROVED TBAKER
MONOLITHIC SLAB 01/24/2020 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 01/23/2020 Disapproved -FEE REQUIRED JCOLASANTI
Note: CONCRETE FORMS SHALL PROVIDE SUFFICIENT STRENGTH TO CONTAIN CONCRET DURING THE PLACEMENT OPERATION (STAY IN PLACE FORMS) FBC404.1.2.3.6.....need termite intent letter in box
PLUMBING 1ST ROUGH UNDERGROUND 01/22/2020 APPROVED - AS NOTED JGIBSON
Note: THIS WAS DONE ON 1/21/20
WATER METER INSTALLATION REQUEST 12/17/2019 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 02/05/2020 02/06/2020
Note: Released By: TBAKER
ENGIN1 HOLD 01/28/2020 01/28/2020
Note: Held By: TBAKER Please show garage slab elevation on foundation survey
SWALE COMPLETE 10/03/2019 11/05/2019
Note: Released By: TBAKER
BLD COMPLETE 10/02/2019 10/08/2019
Note: Released By: MGARRETT
CUSVC COMPLETE 10/02/2019 10/03/2019
Note: Released By: AROSCOE
ELEC COMPLETE 10/02/2019 10/03/2019
Note: Released By: JMUNSON
ENGIN1 COMPLETE 10/02/2019 10/03/2019
Note: Released By: TBAKER
LOCATE COMPLETE 10/02/2019 10/07/2019
Note: Released By: CSTONE
MECH COMPLETE 10/02/2019 10/08/2019
Note: Released By: MGARRETT
PLUM COMPLETE 10/02/2019 10/08/2019
Note: Released By: MGARRETT
SW1 COMPLETE 10/02/2019 10/02/2019
Note: Released By: JMUNSON
UD1 COMPLETE 10/02/2019 10/08/2019
Note: Released By: AHALL
ZON COMPLETE 10/02/2019 10/03/2019
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 06/13/2020
REINSPECTION FEE ¤40.00 02/21/2020
NEW RESIDENTIAL INSPECTIONS ¤494.00 10/28/2019
SITE PLAN 20 ¤20.00 10/28/2019
SURCHARGE FS 533.721 ¤11.59 10/28/2019
SURCHARGE - FS 468.631 ¤17.38 10/28/2019
STORM WATER PERMIT FEES ¤80.00 10/28/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 10/28/2019
SEWER CREDIT (¤1,466.00) 10/28/2019
SEWER INSPECTION ¤25.00 10/28/2019
SEWER CAPITAL FACILITY ¤4,515.25 10/28/2019
WATER CAPITAL FACILITY FEE ¤3,314.84 10/28/2019
ELECTRIC FEE ¤208.20 10/28/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 10/28/2019
IMPACT FEE FIRE ¤223.38 10/28/2019
IMPACT FEE PARKS ¤849.24 10/28/2019
IMPACT FEE SCHOOL ¤3,600.00 10/28/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 10/28/2019
MECHANICAL FEE ¤208.20 10/28/2019
WATER -IRRIGATION INSPECTION ¤25.00 10/28/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 10/28/2019
PLAN CHECK FEE ¤98.80 10/28/2019
PLUMBING FEE ¤208.20 10/28/2019
METER - DEPOSIT ¤60.00 10/28/2019
WATER- TURN ON ¤25.00 10/28/2019
ADMIN FEE ¤20.00 10/28/2019
CONNECTION FEES ¤985.25 10/28/2019
Fees Total Due: ¤0.00 Total Paid: ¤15,154.19