Permit #2019100139
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-2060 |
| CONDITIONED SPACE: 2850 sqft |
| GARAGE: 560 sqft |
| OPENED PORCH (WITH ROOF) : 332 sqft |
| OPENED PORCH (WITH ROOF) : 52 sqft |
| Total Square Footage: 3794 sqft |
| Block: 00000 |
| Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH |
| Job Phone: (386)383-0376 |
| Location Address: 499 SWEETGUM LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/18/2019 |
| NOC: RECORDED |
| Applicant name: ANTHONY CRAIG GUCCIONE |
| Owner: LANNAMAN HAZELDENE J & BRUCE T W&H |
|
Address 2300 OLINVILLE AVE, #20E BRONX, NY 10467 |
| Lot: 2060 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLD COAST HOME BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 354707 PALM COAST, FL 32137 |
CGC1507791 (Exp: 08/31/2026) | 386-313-6221 |
Sub Contractors
BERT S MCLAUGHLIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13006455 (Exp: 08/31/2026) | 386-265-2687 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
PATRICK FRANCIS MCADAMS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1201 South Flagler Ave Flagler Beach, FL 32136 |
CFC057805 (Exp: 08/31/2026) | 386-283-9236 | 321-248-0447 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/28/2020 | FINAL APPROVED | MMESSER |
| U -UTILITY RESIDENTIAL FINAL | 10/28/2020 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 10/27/2020 | APPROVED | RGROSS |
| ROW DAMAGE | 10/27/2020 | Disapproved - NO FEE | RGROSS |
| Note: MICKEY MOUSE REPAIR JOB ON THE MIAMI CURB ON THE LEFT SIDE APRON NEEDS TO BE REPAIRED PROFESSIONALLY. | |||
| ROW DAMAGE | 10/27/2020 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION MICKEY MOUSE REPAIR JOB ON THE MIAMI CURB ON THE LEFT SIDE APRON NEEDS TO BE REPAIRED PROFESSIONALLY. 10/27/20 - THIS INSPECTION WAS RESCHEDULED THE SAME DAY BY THE INSPECTOR BECAUSE THE BUILDER PROVED THAT THE DAMAGE WAS PREEXISTING BEFORE CONSTRUCTION. BUILDER SHOWED DOCUMENTATION OF THE HOA BEING NOTIFIED. THEREFORE BEING APPROVED AS NOTED. | |||
| WATER METER INSTALLATION REQUEST | 10/27/2020 | APPROVED | CSTONE |
| ROW - FINAL APRON (AFTER POUR) | 10/27/2020 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/26/2020 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 10/26/2020 | APPROVED | RGROSS |
| FOOTER | 09/18/2020 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION This is the footer for the paver extension lanai | |||
| ROW- PRE-APRON (PRE-POUR) | 09/10/2020 | APPROVED | RGROSS |
| FOOTER | 09/09/2020 | CANCELLED BY APPLICANT | FWILLIS |
| Note: This is the footer for the paver extension lanai | |||
| ELECTRIC - EARLY POWER | 08/31/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 1:55 | |||
| FOOTER | 08/27/2020 | CANCELLED BY INSPECTOR | WMILLER |
| Note: No footing on Plans, need revision or approved screen room plans withn this footing on it | |||
| ROW- PAVER RESTRAINTS | 08/26/2020 | APPROVED | RGROSS |
| U - SEWER TIE IN | 06/02/2020 | APPROVED - AS NOTED | JGIBSON |
| Note: 6'' C/O NEEDS TO BE RAISED TO FINAL GRADE AT BUILDING FINAL | |||
| GRAVITY SEWER TEST | 06/02/2020 | APPROVED | JGIBSON |
| INSULATION | 03/26/2020 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION WHIRLPOOL PUMPS BONDING 680.62 (B) METAL PARTS OF ELECTRICAL EQUIPMENT ASSOCIATED WITH TUB WATER CIRCULATING SYSTEM INCLUDING PUMP MOTORS SHALL BE BONDED......need energy calcs on site at time of insulation inspection | |||
| INSULATION | 03/20/2020 | Disapproved - NO FEE | JCOLASANTI |
| Note: WHIRLPOOL PUMPS BONDING 680.62 (B) METAL PARTS OF ELECTRICAL EQUIPMENT ASSOCIATED WITH TUB WATER CIRCULATING SYSTEM INCLUDING PUMP MOTORS SHALL BE BONDED......need energy calcs on site at time of insulation inspection | |||
| LATH/BRICK/ WATER BARRIER | 03/17/2020 | APPROVED | JDELBONIS |
| ALL ROUGH | 03/06/2020 | APPROVED | JDELBONIS |
| ELECTRIC-TUG | 01/27/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: emailed FPL at 1:45 pm | |||
| ELECTRIC-TUG | 01/24/2020 | Disapproved - NO FEE | RMARTIN |
| Note: NEEDS PLANS ON SITE TO VERIFY SERVICE SIZE | |||
| WALL SHEATHING | 01/24/2020 | APPROVED | JDELBONIS |
| ROOF VALLEY & METAL | 01/24/2020 | APPROVED | JDELBONIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/14/2020 | APPROVED | JDELBONIS |
| TIE BEAM / LINTEL | 12/16/2019 | APPROVED | JDELBONIS |
| FOUND SURVEY APPROVED (OFFICE) | 12/06/2019 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 11/19/2019 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/13/2019 | APPROVED | FWILLIS |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 10/13/2020 | 10/14/2020 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 10/13/2020 | 10/13/2020 |
| Note: Released By: CTROHA | |||
| UTL | COMPLETE | 10/13/2020 | 10/15/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | COMPLETE | 10/13/2020 | 10/13/2020 |
| Note: Released By: TDOAK | |||
| ENGIN1 | COMPLETE | 08/27/2020 | 08/28/2020 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 08/27/2020 | 09/03/2020 |
| Note: Released By: FREODICA Revision screen enclosure at lanai extension. | |||
| ZON | COMPLETE | 08/27/2020 | 08/28/2020 |
| Note: Released By: ELENS | |||
| SW1 | COMPLETE | 08/27/2020 | 08/28/2020 |
| Note: Released By: CTROHA • Stormwater review not requested on Permit Correction/Revision Form | |||
| UTL | COMPLETE | 08/27/2020 | 09/01/2020 |
| Note: Released By: LFITZGERALD | |||
| ENGIN1 | COMPLETE | 12/20/2019 | 01/02/2020 |
| Note: Released By: TBAKER | |||
| ENGIN1 | COMPLETE | 12/04/2019 | 12/06/2019 |
| Note: Released By: TBAKER | |||
| ELEC | COMPLETE | 10/16/2019 | 10/16/2019 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 10/03/2019 | 10/09/2019 |
| Note: Released By: MGARRETT | |||
| CUSVC | COMPLETE | 10/03/2019 | 10/04/2019 |
| Note: Released By: AROSCOE | |||
| ELEC | HOLD | 10/03/2019 | 10/07/2019 |
| Note: Held By: JMUNSON Load Calculations say 200 amp service. Print and riser diagram say 300 amp service. They need to match. | |||
| ENGIN1 | COMPLETE | 10/03/2019 | 10/03/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 10/03/2019 | 10/07/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 10/03/2019 | 10/09/2019 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 10/03/2019 | 10/09/2019 |
| Note: Released By: MGARRETT | |||
| SW1 | COMPLETE | 10/03/2019 | 10/03/2019 |
| Note: Released By: JMUNSON | |||
| UD1 | COMPLETE | 10/03/2019 | 10/08/2019 |
| Note: Released By: AHALL | |||
| ZON | COMPLETE | 10/03/2019 | 10/04/2019 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 10/28/2020 |
| SITE PLAN 20 | ¤20.00 | 10/18/2019 |
| SURCHARGE FS 533.721 | ¤17.40 | 10/18/2019 |
| SURCHARGE - FS 468.631 | ¤26.10 | 10/18/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/18/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 10/18/2019 |
| SEWER INSPECTION | ¤25.00 | 10/18/2019 |
| METER - DEPOSIT | ¤60.00 | 10/18/2019 |
| WATER-METER | ¤426.95 | 10/18/2019 |
| ADMIN FEE | ¤20.00 | 10/18/2019 |
| CONNECTION FEES | ¤25.00 | 10/18/2019 |
| ELECTRIC FEE | ¤300.00 | 10/18/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 10/18/2019 |
| IMPACT FEE FIRE | ¤223.38 | 10/18/2019 |
| IMPACT FEE PARKS | ¤849.24 | 10/18/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/18/2019 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 10/18/2019 |
| MECHANICAL FEE | ¤300.00 | 10/18/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/18/2019 |
| PLAN CHECK FEE | ¤160.00 | 10/18/2019 |
| PLUMBING FEE | ¤300.00 | 10/18/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤800.00 | 10/18/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,132.46 |