Permit #2019100399
Permit Details
Status: COED
| Parcel Id: 07-11-31-7063-00160-0080 |
| CONDITIONED SPACE: 2331 sqft |
| GARAGE: 610 sqft |
| OPENED PORCH (WITH ROOF) : 176 sqft |
| OPENED PORCH (WITH ROOF) : 96 sqft |
| Total Square Footage: 3213 sqft |
| Block: 00160 |
| Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL |
| Job Phone: (386) 672-8285 |
| Location Address: 10 ZONAL GERANIUM CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/01/2019 |
| NOC: RECORDED |
| Applicant name: JOSEPH TODD VANACORE |
| Owner: VANACORE CONSTRUCTION INC A FLORIDA COORP |
|
Address 1451 N US HWY 1 ORMOND BEACH, FL 32174 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤190,000.00 |
| Job Description: BUILD SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Sub Contractors
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL SURVEY (OFFICE USE ONLY) | 06/17/2020 | CANCELLED BY INSPECTOR | KHOWELL |
| Note: INSPECTION HAS BEEN COMPLETED ALREADY | |||
| BLD - BUILDING FINAL | 06/08/2020 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 06/08/2020 | APPROVED | AHALL |
| ROW - STORMWATER FINAL | 06/05/2020 | APPROVED | MMAJEWSKI |
| ROW - FINAL APRON (AFTER POUR) | 06/05/2020 | APPROVED | MMAJEWSKI |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/04/2020 | APPROVED | MMAJEWSKI |
| FINAL SURVEY (OFFICE USE ONLY) | 06/04/2020 | APPROVED | MMAJEWSKI |
| ROW- PRE-APRON (PRE-POUR) | 05/06/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: IT IS THE BUILDER’S RESPONSIBILITY: TO RECHECK ELEVATIONS AND PIPE SIZE, TO INSURE THAT AN OBSTRUCTION DOES NOT EXIST UPSTREAM AND OR DOWNSTREAM, THAT THE CULVERT PIPE IS SET TO AND OR FOLLOWS THE SWALE PLAN, FORM THE DRIVEWAY TO THE APPROVED SITE PLAN AND FOLLOW THE APPROVED DRIVEWAY DETAIL SHEET PROVIDED BY THE CITY OF PALM COAST. PRIOR TO PLACEMENT OF CONCRETE. | |||
| U - SEWER TIE IN | 05/05/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 05/05/2020 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 04/29/2020 | Approval - Private Provider | PPROVIDER |
| Note: THIS IS A REINSPECTION ADDED ON 4/27/2020 1:19:16 PM | |||
| SEWER SERVICE | 04/27/2020 | Approval - Private Provider | PPROVIDER |
| ELECTRIC - EARLY POWER | 04/27/2020 | Disapproved- Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 04/13/2020 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 03/25/2020 | Approval - Private Provider | PPROVIDER |
| INSULATION | 02/27/2020 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 02/24/2020 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/10/2020 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 02/10/2020 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/06/2020 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 01/16/2020 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 01/06/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 12/26/2019 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/23/2019 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 11/18/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | HOLD | 06/03/2020 | 06/03/2020 |
| Note: Held By: STHOMAS RENAME TO FINAL SURVEY.PDF | |||
| BADMIN | COMPLETE | 06/03/2020 | 06/03/2020 |
| Note: Released By: MDEFREITAS | |||
| ENGIN1 | COMPLETE | 01/03/2020 | 01/03/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 11/12/2019 | 11/12/2019 |
| Note: Released By: AMOBLEY | |||
| SWALE | COMPLETE | 10/31/2019 | 12/04/2019 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 10/28/2019 | 10/29/2019 |
| Note: Released By: JMUNSON foundation | |||
| ZON | COMPLETE | 10/24/2019 | 10/25/2019 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 10/24/2019 | 10/31/2019 |
| Note: Released By: TBAKER | |||
| CUSVC | COMPLETE | 10/09/2019 | 10/14/2019 |
| Note: Released By: AROSCOE | |||
| ENGIN1 | HOLD | 10/09/2019 | 10/14/2019 |
| Note: Held By: TBAKER Benchmark elevation not shown on survey. | |||
| LOCATE | COMPLETE | 10/09/2019 | 10/10/2019 |
| Note: Released By: CSTONE | |||
| SW1 | COMPLETE | 10/09/2019 | 10/10/2019 |
| Note: Released By: JMUNSON | |||
| UD1 | COMPLETE | 10/09/2019 | 10/15/2019 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 10/09/2019 | 10/10/2019 |
| Note: Held By: ELENS Site plan lists sheet 1 of 2 but only sheet 1 is uploaded. Missing the legal description, flood zone, flood map, lot area, etc. Color of residence does not meet our definition of an earth tone, nor a pastel. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 11/01/2019 |
| WATER- TURN ON | ¤25.00 | 11/01/2019 |
| CONNECTION FEES | ¤985.25 | 11/01/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 11/01/2019 |
| IMPACT FEE FIRE | ¤223.38 | 11/01/2019 |
| IMPACT FEE PARKS | ¤849.24 | 11/01/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/01/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 11/01/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/01/2019 |
| PERMIT FEE | ¤125.00 | 11/01/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 11/01/2019 |
| SITE PLAN 20 | ¤20.00 | 11/01/2019 |
| SURCHARGE FS 533.721 | ¤2.00 | 11/01/2019 |
| SURCHARGE - FS 468.631 | ¤2.18 | 11/01/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/01/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 11/01/2019 |
| SEWER CREDIT | (¤90.45) | 11/01/2019 |
| SEWER INSPECTION | ¤25.00 | 11/01/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 11/01/2019 |
| WATER CREDIT | (¤112.82) | 11/01/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 11/01/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,199.73 |