Permit #2019100414

Permit Details

Status: COED

Parcel Id: 07-11-31-7022-00250-0220
CONDITIONED SPACE: 2306 sqft
OPENED PORCH (WITH ROOF) : 138 sqft
GARAGE: 466 sqft
OPENED PORCH (WITH ROOF) : 32 sqft
Total Square Footage: 2942 sqft
Block: 00250
Subdivision: 2217 - SECTION 22-WYNNFIELD
Job Phone: 407-807-0656
Location Address: 20 WESTMORE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/08/2020
NOC: RECORDED
Applicant name: NAVIN SUGRIM
Owner: DLP BRITE HOMES LLC

Address

605 PALENCIA CLUB DRIVE

ST AUGUSTINE, FL 32095

Lot: 0220
Contracted Stated Job Value: ¤148,359.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

DLP BUILDERS LLC
Status Location Address State License Number Phone
CANCEL

7345 GREENBRIAR PKWY

ORLANDO, FL 32819

CBC1263567 (Exp: 08/31/2022) 407-807-0656

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/21/2020 FINAL APPROVED JBODEN
Note: THIS IS A REINSPECTION HOUSE LOCKED ACCESS NEEDED FOR INSPECTION.
BLD - BUILDING FINAL 07/20/2020 Disapproved -FEE REQUIRED FWILLIS
Note: HOUSE LOCKED ACCESS NEEDED FOR INSPECTION.
U -UTILITY RESIDENTIAL FINAL 07/20/2020 FINAL APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 07/16/2020 APPROVED RGROSS
ROW - STORMWATER FINAL 07/16/2020 APPROVED - AS NOTED RGROSS
Note: NOTE THAT THE SWALE IS FULL OF WATER THAT IS NO FAULT OF THE BUILDER. STREET SWALE NEEDS REGRADED AND IS ALREADY ON THE CITY SWALE REGRADE SCHEDULE.
ROW FIELD SURVEY /GRADING CERTIFICATION 07/08/2020 APPROVED RGROSS
Note: SEE NOTES ON FINAL APPROVED SURVEY
FINAL SURVEY (OFFICE USE ONLY) 07/08/2020 APPROVED - AS NOTED RGROSS
Note: DRAINAGE CONVEYANCE FLOWS INSIDE ALONG BOTH SIDES OF THE PROPERTY LINE.
ROW- PRE-APRON (PRE-POUR) 06/17/2020 APPROVED RGROSS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION TOO MUCH WATER IN PIPE. 6/1/20. MUST BE 4 INCHES OF DEPTH ALONG THE GARAGE ENTRANCE. 6/2/20 - SUPER TO MAKE ADJUSTMENTS TO THE CULVERT AND FORM BOARDS 6/16/20 - 9:45AM. MISSING DOCUMENTATION. NO SWALE OR SITE PLAN ON SITE. 6/17/20 - READY TO POUR
ROW- PRE-APRON (PRE-POUR) 06/16/2020 Disapproved - NO FEE RGROSS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION TOO MUCH WATER IN PIPE. 6/1/20. MUST BE 4 INCHES OF DEPTH ALONG THE GARAGE ENTRANCE. 6/2/20 - SUPER TO MAKE ADJUSTMENTS TO THE CULVERT AND FORM BOARDS 6/16/20 - 9:45AM. MISSING DOCUMENTATION. NO SWALE OR SITE PLAN ON SITE.
ELECTRIC - EARLY POWER 06/16/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 10:50
ROW- PRE-APRON (PRE-POUR) 06/02/2020 CANCELLED BY APPLICANT RGROSS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION TOO MUCH WATER IN PIPE. 6/1/20. MUST BE 4 INCHES OF DEPTH ALONG THE GARAGE ENTRANCE. 6/2/20 - SUPER TO MAKE ADJUSTMENTS TO THE CULVERT AND FORM BOARDS
ROW- PRE-APRON (PRE-POUR) 06/01/2020 Disapproved - NO FEE RGROSS
Note: THIS IS A REINSPECTION TOO MUCH WATER IN PIPE. 6/1/20. MUST BE 4 INCHES OF DEPTH ALONG THE GARAGE ENTRANCE.
ROW- PRE-APRON (PRE-POUR) 05/29/2020 Disapproved -FEE REQUIRED MMAJEWSKI
Note: TOO MUCH WATER IN PIPE
GRAVITY SEWER TEST 05/20/2020 APPROVED JGIBSON
U - SEWER TIE IN 05/20/2020 APPROVED JGIBSON
LATH/BRICK/ WATER BARRIER 05/19/2020 APPROVED JCOLASANTI
INSULATION 05/08/2020 APPROVED FWILLIS
ALL ROUGH 05/05/2020 APPROVED JDELBONIS
ROOF VALLEY & METAL 04/27/2020 APPROVED JCOLASANTI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/17/2020 APPROVED JCOLASANTI
TIE BEAM / LINTEL 04/02/2020 APPROVED JCOLASANTI
FOUND SURVEY APPROVED (OFFICE) 03/31/2020 APPROVED TBAKER
MONOLITHIC SLAB 03/20/2020 APPROVED JCOLASANTI
PLUMBING 1ST ROUGH UNDERGROUND 03/18/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 02/25/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 03/31/2020 03/31/2020
Note: Released By: TBAKER
SW1 COMPLETE 12/17/2019 12/18/2019
Note: Released By: CTROHA
ZON COMPLETE 11/20/2019 11/21/2019
Note: Released By: AMOBLEY
MECH COMPLETE 11/20/2019 11/21/2019
Note: Released By: CPISCITELLI
ENGIN1 COMPLETE 11/20/2019 11/21/2019
Note: Released By: TBAKER
SW1 HOLD 11/20/2019 11/21/2019
Note: Held By: CTROHA The FFE on the neighboring lot is a 1.3 ft. lower than your proposed. Eplain how you are going to build a drainage conveyance so your stormawater is not going to impact the neighboring property
SWALE COMPLETE 10/14/2019 12/02/2019
Note: Released By: TBAKER
BLD COMPLETE 10/09/2019 10/17/2019
Note: Released By: MGARRETT
CUSVC COMPLETE 10/09/2019 10/10/2019
Note: Released By: BVITALE
ELEC COMPLETE 10/09/2019 10/14/2019
Note: Released By: JMUNSON
ENGIN1 COMPLETE 10/09/2019 10/14/2019
Note: Released By: TBAKER
LOCATE COMPLETE 10/09/2019 10/14/2019
Note: Released By: CSTONE
MECH HOLD 10/09/2019 10/15/2019
Note: Held By: CPISCITELLI Verify concrete wall insulation. Plans show R8.6 and Energy calcs say R15.1. Revise to match
PLUM COMPLETE 10/09/2019 10/17/2019
Note: Released By: MGARRETT
SW1 COMPLETE 10/09/2019 10/10/2019
Note: Released By: JMUNSON
UD1 COMPLETE 10/09/2019 10/15/2019
Note: Released By: LFITZGERALD
ZON HOLD 10/09/2019 10/10/2019
Note: Held By: AMOBLEY Lot width missing on survey/site plan

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/22/2020
REINSPECTION FEE ¤40.00 06/16/2020
CONTRACTOR CHANGE ¤40.00 05/04/2020
ELECTRIC FEE ¤229.20 01/08/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 01/08/2020
IMPACT FEE FIRE ¤223.38 01/08/2020
IMPACT FEE PARKS ¤849.24 01/08/2020
IMPACT FEE SCHOOL ¤3,600.00 01/08/2020
IMPACT FEE TRANSPORTATION ¤1,632.00 01/08/2020
MECHANICAL FEE ¤229.20 01/08/2020
WATER -IRRIGATION INSPECTION ¤25.00 01/08/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 01/08/2020
PLAN CHECK FEE ¤112.80 01/08/2020
PLUMBING FEE ¤229.20 01/08/2020
NEW RESIDENTIAL INSPECTIONS ¤564.00 01/08/2020
SITE PLAN 20 ¤20.00 01/08/2020
SURCHARGE FS 533.721 ¤12.92 01/08/2020
SURCHARGE - FS 468.631 ¤19.37 01/08/2020
STORM WATER PERMIT FEES ¤80.00 01/08/2020
3% TRANS IMPACT FEE CREDIT (¤48.96) 01/08/2020
SEWER CREDIT (¤1,147.00) 01/08/2020
SEWER INSPECTION ¤25.00 01/08/2020
SEWER CAPITAL FACILITY ¤4,515.25 01/08/2020
WATER CAPITAL FACILITY FEE ¤3,314.84 01/08/2020
METER - DEPOSIT ¤60.00 01/08/2020
WATER- TURN ON ¤25.00 01/08/2020
ADMIN FEE ¤20.00 01/08/2020
CONNECTION FEES ¤985.25 01/08/2020
Fees Total Due: ¤0.00 Total Paid: ¤15,663.51