I want to search for...
Permit #2019100427
Permit Details
Status: COED
| Parcel Id: 07-11-31-7027-00080-0130 |
| CONDITIONED SPACE: 2306 sqft |
| GARAGE: 466 sqft |
| OPENED PORCH (WITH ROOF) : 138 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| Total Square Footage: 2942 sqft |
| Block: 00080 |
| Subdivision: 2128 - SECTION 27-WYNNFIELD |
| Job Phone: 407-807-0656 |
| Location Address: 37 WOODSIDE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/18/2020 |
| NOC: RECORDED |
| Applicant name: NAVIN SUGRIM |
| Owner: DLP BRITE HOMES LLC |
|
Address 605 PALENCIA CLUB DRIVE ST AUGUSTINE, FL 32095 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤148,359.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DLP BUILDERS LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
CBC1263567 (Exp: 08/31/2022) | 407-807-0656 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/07/2020 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION need to seal at ceiling fresh air duct in ac closet.....NEED TO HAVE ARC SHIELDS WHERE THERE IS MORE THAN 1/4" SPACE AT COMBUSTABLES CHECK ALL OUTLETS..NEC 314.20....need cover for elec switch in dinning room | |||
| BLD - BUILDING FINAL | 07/06/2020 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: need to seal at ceiling fresh air duct in ac closet.....NEED TO HAVE ARC SHIELDS WHERE THERE IS MORE THAN 1/4" SPACE AT COMBUSTABLES CHECK ALL OUTLETS..NEC 314.20....need cover for elec switch in dinning room | |||
| U -UTILITY RESIDENTIAL FINAL | 07/06/2020 | APPROVED | AHALL |
| ROW - STORMWATER FINAL | 07/02/2020 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 07/02/2020 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/01/2020 | APPROVED - AS NOTED | RGROSS |
| Note: SEE NOTES ON FINAL SURVEY APPROVAL | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/01/2020 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION FINISHED FLOOR ELEVATION MUST BE A MINIMUM OF 4 INCHES ABOVE THE OUTSIDE GRADE AT THE FOUNDATION. COMPARE FFE TO EACH CORNER OF THE HOUSE OUTSIDE GRADE. 7/1/20 - DRAINAGE CONVEYANCE ON THE FRONT LEFT FLOWS INSIDE THE PROPERTY LINE AROUND THE WATER METER AND ON THE RIGHT FRONT SIDE AROUND THE TELEPHONE POLE. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/26/2020 | Disapproved - NO FEE | RGROSS |
| Note: FINISHED FLOOR ELEVATION MUST BE A MINIMUM OF 4 INCHES ABOVE THE OUTSIDE GRADE AT THE FOUNDATION. COMPARE FFE TO EACH CORNER OF THE HOUSE OUTSIDE GRADE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/26/2020 | CANCELLED BY INSPECTOR | RGROSS |
| Note: FINAL SURVEY MUST BE APPROVED FIRST. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/04/2020 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION CULVERT AND MITERED ENDS FULL OF WATER. PHOTO ATTACHED. 6/4/20 - BUILDER TO PUMP THE SMALL AMOUNT OF WATER IN THE MITER OUT BEFORE POURING. MORE RAIN IN THE FORECAST. DOUBLE CHECK ELEVATIONS BEFORE POURING. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/03/2020 | Disapproved - NO FEE | RGROSS |
| Note: CULVERT AND MITERED ENDS FULL OF WATER. PHOTO ATTACHED. | |||
| U - SEWER TIE IN | 06/02/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| GRAVITY SEWER TEST | 06/02/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| ELECTRIC - EARLY POWER | 06/01/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 11:00 | |||
| GRAVITY SEWER TEST | 05/19/2020 | CANCELLED BY APPLICANT | JGIBSON |
| U - SEWER TIE IN | 05/19/2020 | CANCELLED BY APPLICANT | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 05/04/2020 | APPROVED | MMESSER |
| INSULATION | 04/28/2020 | APPROVED | JCOLASANTI |
| ALL ROUGH | 04/22/2020 | APPROVED - AS NOTED | JCOLASANTI |
| Note: need to frame electricall panel....need to seal tub trench (check at insulation) | |||
| ROOF VALLEY & METAL | 04/13/2020 | APPROVED | JCOLASANTI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/06/2020 | APPROVED | JCOLASANTI |
| ELECTRIC-TUG | 04/01/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 11:45 | |||
| TIE BEAM / LINTEL | 03/23/2020 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 03/20/2020 | Disapproved - NO FEE | JCOLASANTI |
| Note: still working on block | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/16/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/12/2020 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/05/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 02/20/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/16/2020 | 03/16/2020 |
| Note: Released By: TBAKER Foundation Survey | |||
| ZON | COMPLETE | 01/22/2020 | 01/23/2020 |
| Note: Released By: AMOBLEY | |||
| ZON | HOLD | 12/17/2019 | 12/18/2019 |
| Note: Held By: AMOBLEY Please provide total width of driveway on site plan survey | |||
| LOCATE | COMPLETE | 12/17/2019 | 12/18/2019 |
| Note: Released By: CSTONE | |||
| UD1 | COMPLETE | 12/17/2019 | 12/19/2019 |
| Note: Released By: AHALL | |||
| MECH | COMPLETE | 12/17/2019 | 12/17/2019 |
| Note: Released By: CPISCITELLI | |||
| ENGIN1 | COMPLETE | 12/17/2019 | 12/30/2019 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 12/17/2019 | 01/03/2020 |
| Note: Released By: FREODICA | |||
| ELEC | COMPLETE | 12/17/2019 | 12/18/2019 |
| Note: Released By: JMUNSON | |||
| MECH | COMPLETE | 12/17/2019 | 12/17/2019 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 12/17/2019 | 01/03/2020 |
| Note: Released By: FREODICA | |||
| ENGIN1 | HOLD | 12/03/2019 | 12/03/2019 |
| Note: Held By: TBAKER Wrong survey | |||
| SWALE | COMPLETE | 10/14/2019 | 01/08/2020 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 10/10/2019 | 10/17/2019 |
| Note: Released By: MGARRETT | |||
| CUSVC | COMPLETE | 10/10/2019 | 10/10/2019 |
| Note: Released By: BVITALE | |||
| ELEC | COMPLETE | 10/10/2019 | 10/14/2019 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 10/10/2019 | 10/14/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | REJECT | 10/10/2019 | 10/14/2019 |
| Note: Rejected By: CSTONE Site plans do not match address. Please upload correct plans. | |||
| MECH | HOLD | 10/10/2019 | 10/16/2019 |
| Note: Held By: CPISCITELLI Verify concrete wall insulation. Plan shows R8.6 and energy calcs say R15.1. Revise to match | |||
| PLUM | COMPLETE | 10/10/2019 | 10/17/2019 |
| Note: Released By: MGARRETT | |||
| SW1 | COMPLETE | 10/10/2019 | 10/10/2019 |
| Note: Released By: JMUNSON | |||
| UD1 | HOLD | 10/10/2019 | 10/15/2019 |
| Note: Held By: LFITZGERALD site plan does not match application address | |||
| ZON | HOLD | 10/10/2019 | 10/11/2019 |
| Note: Held By: AMOBLEY All documents submitted are for a different address.Can not complete review |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/21/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 05/06/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 05/06/2020 |
| ELECTRIC FEE | ¤229.20 | 02/18/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 02/18/2020 |
| IMPACT FEE FIRE | ¤223.38 | 02/18/2020 |
| IMPACT FEE PARKS | ¤849.24 | 02/18/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/18/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 02/18/2020 |
| MECHANICAL FEE | ¤229.20 | 02/18/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/18/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 02/18/2020 |
| PLAN CHECK FEE | ¤112.80 | 02/18/2020 |
| PLUMBING FEE | ¤229.20 | 02/18/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤564.00 | 02/18/2020 |
| SITE PLAN 20 | ¤20.00 | 02/18/2020 |
| SURCHARGE FS 533.721 | ¤12.92 | 02/18/2020 |
| SURCHARGE - FS 468.631 | ¤19.37 | 02/18/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/18/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 02/18/2020 |
| SEWER CREDIT | (¤1,342.00) | 02/18/2020 |
| SEWER INSPECTION | ¤25.00 | 02/18/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 02/18/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 02/18/2020 |
| METER - DEPOSIT | ¤60.00 | 02/18/2020 |
| WATER- TURN ON | ¤25.00 | 02/18/2020 |
| ADMIN FEE | ¤20.00 | 02/18/2020 |
| CONNECTION FEES | ¤1,002.88 | 02/18/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,626.30 |