Permit #2019100427

Permit Details

Status: COED

Parcel Id: 07-11-31-7027-00080-0130
CONDITIONED SPACE: 2306 sqft
GARAGE: 466 sqft
OPENED PORCH (WITH ROOF) : 138 sqft
OPENED PORCH (WITH ROOF) : 32 sqft
Total Square Footage: 2942 sqft
Block: 00080
Subdivision: 2128 - SECTION 27-WYNNFIELD
Job Phone: 407-807-0656
Location Address: 37 WOODSIDE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/18/2020
NOC: RECORDED
Applicant name: NAVIN SUGRIM
Owner: DLP BRITE HOMES LLC

Address

605 PALENCIA CLUB DRIVE

ST AUGUSTINE, FL 32095

Lot: 0130
Contracted Stated Job Value: ¤148,359.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

DLP BUILDERS LLC
Status Location Address State License Number Phone
CANCEL

7345 GREENBRIAR PKWY

ORLANDO, FL 32819

CBC1263567 (Exp: 08/31/2022) 407-807-0656

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853
THOMAS WALTER ALBANO
Status Location Address State License Number Phone Fax
INACTIVE

P. O. BOX 352075

Palm Coast, FL 32135

CFC045991 (Exp: 08/31/2024) 386-437-2795 (386)437-2781

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/07/2020 FINAL APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION need to seal at ceiling fresh air duct in ac closet.....NEED TO HAVE ARC SHIELDS WHERE THERE IS MORE THAN 1/4" SPACE AT COMBUSTABLES CHECK ALL OUTLETS..NEC 314.20....need cover for elec switch in dinning room
BLD - BUILDING FINAL 07/06/2020 Disapproved -FEE REQUIRED JCOLASANTI
Note: need to seal at ceiling fresh air duct in ac closet.....NEED TO HAVE ARC SHIELDS WHERE THERE IS MORE THAN 1/4" SPACE AT COMBUSTABLES CHECK ALL OUTLETS..NEC 314.20....need cover for elec switch in dinning room
U -UTILITY RESIDENTIAL FINAL 07/06/2020 APPROVED AHALL
ROW - STORMWATER FINAL 07/02/2020 APPROVED RGROSS
ROW - FINAL APRON (AFTER POUR) 07/02/2020 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 07/01/2020 APPROVED - AS NOTED RGROSS
Note: SEE NOTES ON FINAL SURVEY APPROVAL
FINAL SURVEY (OFFICE USE ONLY) 07/01/2020 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION FINISHED FLOOR ELEVATION MUST BE A MINIMUM OF 4 INCHES ABOVE THE OUTSIDE GRADE AT THE FOUNDATION. COMPARE FFE TO EACH CORNER OF THE HOUSE OUTSIDE GRADE. 7/1/20 - DRAINAGE CONVEYANCE ON THE FRONT LEFT FLOWS INSIDE THE PROPERTY LINE AROUND THE WATER METER AND ON THE RIGHT FRONT SIDE AROUND THE TELEPHONE POLE.
FINAL SURVEY (OFFICE USE ONLY) 06/26/2020 Disapproved - NO FEE RGROSS
Note: FINISHED FLOOR ELEVATION MUST BE A MINIMUM OF 4 INCHES ABOVE THE OUTSIDE GRADE AT THE FOUNDATION. COMPARE FFE TO EACH CORNER OF THE HOUSE OUTSIDE GRADE.
ROW FIELD SURVEY /GRADING CERTIFICATION 06/26/2020 CANCELLED BY INSPECTOR RGROSS
Note: FINAL SURVEY MUST BE APPROVED FIRST.
ROW- PRE-APRON (PRE-POUR) 06/04/2020 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION CULVERT AND MITERED ENDS FULL OF WATER. PHOTO ATTACHED. 6/4/20 - BUILDER TO PUMP THE SMALL AMOUNT OF WATER IN THE MITER OUT BEFORE POURING. MORE RAIN IN THE FORECAST. DOUBLE CHECK ELEVATIONS BEFORE POURING.
ROW- PRE-APRON (PRE-POUR) 06/03/2020 Disapproved - NO FEE RGROSS
Note: CULVERT AND MITERED ENDS FULL OF WATER. PHOTO ATTACHED.
U - SEWER TIE IN 06/02/2020 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
GRAVITY SEWER TEST 06/02/2020 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
ELECTRIC - EARLY POWER 06/01/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 11:00
GRAVITY SEWER TEST 05/19/2020 CANCELLED BY APPLICANT JGIBSON
U - SEWER TIE IN 05/19/2020 CANCELLED BY APPLICANT JGIBSON
LATH/BRICK/ WATER BARRIER 05/04/2020 APPROVED MMESSER
INSULATION 04/28/2020 APPROVED JCOLASANTI
ALL ROUGH 04/22/2020 APPROVED - AS NOTED JCOLASANTI
Note: need to frame electricall panel....need to seal tub trench (check at insulation)
ROOF VALLEY & METAL 04/13/2020 APPROVED JCOLASANTI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/06/2020 APPROVED JCOLASANTI
ELECTRIC-TUG 04/01/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 11:45
TIE BEAM / LINTEL 03/23/2020 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 03/20/2020 Disapproved - NO FEE JCOLASANTI
Note: still working on block
FOUND SURVEY APPROVED (OFFICE) 03/16/2020 APPROVED TBAKER
MONOLITHIC SLAB 03/12/2020 APPROVED JCOLASANTI
PLUMBING 1ST ROUGH UNDERGROUND 03/05/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 02/20/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 03/16/2020 03/16/2020
Note: Released By: TBAKER Foundation Survey
ZON COMPLETE 01/22/2020 01/23/2020
Note: Released By: AMOBLEY
ZON HOLD 12/17/2019 12/18/2019
Note: Held By: AMOBLEY Please provide total width of driveway on site plan survey
LOCATE COMPLETE 12/17/2019 12/18/2019
Note: Released By: CSTONE
UD1 COMPLETE 12/17/2019 12/19/2019
Note: Released By: AHALL
MECH COMPLETE 12/17/2019 12/17/2019
Note: Released By: CPISCITELLI
ENGIN1 COMPLETE 12/17/2019 12/30/2019
Note: Released By: TBAKER
BLD COMPLETE 12/17/2019 01/03/2020
Note: Released By: FREODICA
ELEC COMPLETE 12/17/2019 12/18/2019
Note: Released By: JMUNSON
MECH COMPLETE 12/17/2019 12/17/2019
Note: Released By: CPISCITELLI
PLUM COMPLETE 12/17/2019 01/03/2020
Note: Released By: FREODICA
ENGIN1 HOLD 12/03/2019 12/03/2019
Note: Held By: TBAKER Wrong survey
SWALE COMPLETE 10/14/2019 01/08/2020
Note: Released By: TBAKER
BLD COMPLETE 10/10/2019 10/17/2019
Note: Released By: MGARRETT
CUSVC COMPLETE 10/10/2019 10/10/2019
Note: Released By: BVITALE
ELEC COMPLETE 10/10/2019 10/14/2019
Note: Released By: JMUNSON
ENGIN1 COMPLETE 10/10/2019 10/14/2019
Note: Released By: TBAKER
LOCATE REJECT 10/10/2019 10/14/2019
Note: Rejected By: CSTONE Site plans do not match address. Please upload correct plans.
MECH HOLD 10/10/2019 10/16/2019
Note: Held By: CPISCITELLI Verify concrete wall insulation. Plan shows R8.6 and energy calcs say R15.1. Revise to match
PLUM COMPLETE 10/10/2019 10/17/2019
Note: Released By: MGARRETT
SW1 COMPLETE 10/10/2019 10/10/2019
Note: Released By: JMUNSON
UD1 HOLD 10/10/2019 10/15/2019
Note: Held By: LFITZGERALD site plan does not match application address
ZON HOLD 10/10/2019 10/11/2019
Note: Held By: AMOBLEY All documents submitted are for a different address.Can not complete review

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/21/2020
CONTRACTOR CHANGE ¤40.00 05/06/2020
CONTRACTOR CHANGE ¤40.00 05/06/2020
ELECTRIC FEE ¤229.20 02/18/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 02/18/2020
IMPACT FEE FIRE ¤223.38 02/18/2020
IMPACT FEE PARKS ¤849.24 02/18/2020
IMPACT FEE SCHOOL ¤3,600.00 02/18/2020
IMPACT FEE TRANSPORTATION ¤1,632.00 02/18/2020
MECHANICAL FEE ¤229.20 02/18/2020
WATER -IRRIGATION INSPECTION ¤25.00 02/18/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 02/18/2020
PLAN CHECK FEE ¤112.80 02/18/2020
PLUMBING FEE ¤229.20 02/18/2020
NEW RESIDENTIAL INSPECTIONS ¤564.00 02/18/2020
SITE PLAN 20 ¤20.00 02/18/2020
SURCHARGE FS 533.721 ¤12.92 02/18/2020
SURCHARGE - FS 468.631 ¤19.37 02/18/2020
STORM WATER PERMIT FEES ¤80.00 02/18/2020
3% TRANS IMPACT FEE CREDIT (¤48.96) 02/18/2020
SEWER CREDIT (¤1,342.00) 02/18/2020
SEWER INSPECTION ¤25.00 02/18/2020
SEWER CAPITAL FACILITY ¤4,596.07 02/18/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 02/18/2020
METER - DEPOSIT ¤60.00 02/18/2020
WATER- TURN ON ¤25.00 02/18/2020
ADMIN FEE ¤20.00 02/18/2020
CONNECTION FEES ¤1,002.88 02/18/2020
Fees Total Due: ¤0.00 Total Paid: ¤15,626.30