Permit #2019100467
Permit Details
Status: COED
| Parcel Id: 09-12-31-0000-02030-0020 |
| Total Square Footage: 2000 sqft |
| Block: 02030 |
| Subdivision: - |
| Job Phone: 904-551-3003 |
| Location Address: 60 MEMORIAL MEDICAL PKWY |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 11/18/2019 |
| NOC: RECORDED |
| Applicant name: DANIEL TODD DAVIS |
| Owner: MEMORIAL HOSPITAL-FLAGLER INC |
|
Address 60 MEMORIAL MEDICAL PKWY PALM COAST, FL 32164 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤134,855.00 |
| Job Description: CT # 2 - 1ST FLOOR - EQUIPMENT REPLACEMENT & INTERIOR RENOVATION |
| Type: CN |
Contractor
COMMERCIAL CONSTRUCTION SERVICES INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3621 ST AUGUSTINE RD JACKSONVILLE, FL 32207 |
CBC1259753 (Exp: 08/31/2026) | 904-551-3003 | 904-551-9637 |
Sub Contractors
JAMES BRIAN SEAY
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1799 JACKSONVILLE, FL 32201 |
EC13003061 (Exp: 08/31/2026) | 904-388-8000 | 904-389-8653 |
CHARLES HENRY LEO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
8544 ALICANTA AVE JACKSONVILLE, FL 32244 |
CAC042678 (Exp: 08/31/2026) | 904-278-0900 | 904-278-0090 |
Inspection History
| Type | Request Date | Result | Inspector |
| U - UTILITY COMMERCIAL FINAL | 01/15/2020 | FINAL APPROVED | LFITZGERALD |
| FIRE FINAL | 01/10/2020 | APPROVED | WMILLER |
| Note: This was set up for inspection on 1-10-2020, however I was called out on 1-09-2020 to inspect the fire final and the result is approved | |||
| ELECTRIC FINAL | 01/09/2020 | APPROVED | RMARTIN |
| FLOOR/WALL PENETRATION | 01/09/2020 | APPROVED | FWILLIS |
| BUILDING FINAL | 01/09/2020 | FINAL APPROVED | FWILLIS |
| PLUMBING FINAL | 01/09/2020 | APPROVED | JGIBSON |
| HVAC FINAL | 01/09/2020 | FINAL APPROVED | CPISCITELLI |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING PRESSURE TEST | 01/06/2020 | CANCELLED BY INSPECTOR | JGIBSON |
| HVAC FINAL | 12/13/2019 | Disapproved -FEE REQUIRED | CPISCITELLI |
| Note: 1. Ductwork needs to be sealed on top of pillow backs with approved material. All tape needs to be approved tape. 2. Flex duct needs to be supported, not laying on grid | |||
| ELECTRIC 2ND ROUGH | 12/13/2019 | APPROVED | RMARTIN |
| ABOVE CEILING | 12/13/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: ALL M.E.P MET ON SITE, WILL NEED TO CHECK THINGS ABOVE CEILING AT FINAL | |||
| FRAMING | 12/10/2019 | APPROVED | FWILLIS |
| ELECTRIC 2ND ROUGH | 11/22/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: ELECTRIC WILL BE SURFACE MOUNT | |||
| PLUMBING 2ND ROUGH | 11/22/2019 | APPROVED | JGIBSON |
| HVAC ROUGH | 11/22/2019 | APPROVED | CPISCITELLI |
Review History
| Department | Status | Date In | Date Out |
| FI1 | COMPLETE | 11/08/2019 | 11/08/2019 |
| Note: Released By: BBEMBRY Lee Miller spoke with applicant and they are aware separate permits will be required for fire sprinkler | |||
| PLUM | COMPLETE | 10/22/2019 | 11/12/2019 |
| Note: Released By: PBUCKLEY | |||
| BLD | COMPLETE | 10/22/2019 | 11/12/2019 |
| Note: Released By: PBUCKLEY | |||
| FI1 | HOLD | 10/22/2019 | 11/05/2019 |
| Note: Held By: WMILLER Seperate Fire Sprinkler permit needed. | |||
| ELEC | COMPLETE | 10/22/2019 | 10/25/2019 |
| Note: Released By: JMUNSON | |||
| MECH | COMPLETE | 10/22/2019 | 10/23/2019 |
| Note: Released By: CPISCITELLI | |||
| BLD | HOLD | 10/10/2019 | 10/22/2019 |
| Note: Held By: LMUSGROVE plans need to be uploaded single page and each one must have digital seal on each | |||
| ELEC | HOLD | 10/10/2019 | 10/22/2019 |
| Note: Held By: LMUSGROVE plans need to be uploaded single page and each one must have digital seal on each | |||
| FI1 | HOLD | 10/10/2019 | 10/22/2019 |
| Note: Held By: LMUSGROVE plans need to be uploaded single page and each one must have digital seal on each | |||
| MECH | HOLD | 10/10/2019 | 10/22/2019 |
| Note: Held By: LMUSGROVE plans need to be uploaded single page and each one must have digital seal on each | |||
| PLUM | HOLD | 10/10/2019 | 10/22/2019 |
| Note: Held By: LMUSGROVE plans need to be uploaded single page and each one must have digital seal on each | |||
| UD1 | COMPLETE | 10/10/2019 | 10/11/2019 |
| Note: Released By: CJOHNSON | |||
| ZON | COMPLETE | 10/10/2019 | 10/11/2019 |
| Note: Released By: JGONZALEZ |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/14/2020 |
| SITE PLAN 20 | ¤20.00 | 11/18/2019 |
| SURCHARGE FS 533.721 | ¤5.03 | 11/18/2019 |
| SURCHARGE - FS 468.631 | ¤7.54 | 11/18/2019 |
| ADMIN COMMERCIAL | ¤60.00 | 11/18/2019 |
| INSPECTION - COMMERCIAL ADD | ¤943.99 | 11/18/2019 |
| ELECTRIC FEE | ¤140.91 | 11/18/2019 |
| MECHANICAL FEE | ¤140.91 | 11/18/2019 |
| PLAN CHECK FEE | ¤155.09 | 11/18/2019 |
| PLUMBING FEE | ¤140.91 | 11/18/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,654.38 |