I want to search for...

Permit #2019100732

Permit Details

Status: COED

Parcel Id: 44-11-31-0000-01010-0030
Total Square Footage: 2992 sqft
Block: 01010
Subdivision: -
Job Phone: 386-313-6950
Location Address: 360 PALM COAST PKWY NE
Type: BC - BUILDING COMMERCIAL
Issue Date: 11/09/2019
NOC: RECORDED
Applicant name: MARK ANTHONY LANGELLO
Owner: ANCHOR REAL ESTATE HOLDINGS LLC

Address

160 COSTA BLANCA RD

ST AUGUSTINE, FL 32095

Lot: 0030
Contracted Stated Job Value: ¤295,000.00
Job Description: COASTAL REHAB
Type: CN

Contractor

M & M DEVELOPMENT & CONSTRUCTION LLC
Status Location Address State License Number Phone
CANCEL

2323 N. STATE ST

BUNNELL, FL 32110

RG291103911 (Exp: 08/31/2023) 386-313-6950

Sub Contractors

ROBERT CARLTON LITTLE
Status Location Address State License Number Phone
ACTIVE

3050 EAST MOODY BLVD

BUNNELL, FL 32110

EC13003740 (Exp: 08/31/2026) 386-931-1708
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
GLENN JAMES CANFIELD
Status Location Address State License Number Phone Fax
INACTIVE

1519 RIDGEWOOD AVE

HOLLY HILL, FL 32117

CGC1510220 (Exp: 08/31/2022) 386-257-6199 386-257-0556

Inspection History

Type Request Date Result Inspector
ELECTRIC FINAL 06/29/2020 APPROVED RMARTIN
Note: THIS IS A REINSPECTION NEED GFCI PROTECTION IN SMALL REST ROOM ON OUTLET, NEC 210.8, NEED 2GANG PLATE INSTALLED SAFED OFF NEED REVISION ON ADDED ELECTRIC AS PER PREVIOUS NOTES ON INSPECTION ALL ITEMS ARE DONE 6/29
BUILDING FINAL 06/29/2020 FINAL APPROVED JBODEN
Note: THIS IS A REINSPECTION
FIRE FINAL 06/29/2020 FINAL APPROVED JBODEN
Note: THIS IS A REINSPECTION
FIRE FINAL 06/26/2020 Disapproved - NO FEE JBODEN
ELECTRIC FINAL 06/26/2020 Disapproved - NO FEE RMARTIN
Note: NEED GFCI PROTECTION IN SMALL REST ROOM ON OUTLET, NEC 210.8, NEED 2GANG PLATE INSTALLED SAFED OFF NEED REVISION ON ADDED ELECTRIC AS PER PREVIOUS NOTES ON INSPECTION
PLUMBING FINAL 06/26/2020 APPROVED JGIBSON
HVAC FINAL 06/26/2020 FINAL APPROVED CPISCITELLI
BUILDING FINAL 06/26/2020 Disapproved - NO FEE JBODEN
U - UTILITY COMMERCIAL FINAL 06/26/2020 APPROVED LFITZGERALD
EXTERIOR ARCHITECTURAL FEATURES 06/22/2020 APPROVED BDAWSON
Note: THIS IS A REINSPECTION ADDED ON 6/18/2020 1:27:33 PM - Finalize all details on exterior prior to calling in reinspection. Door trim Door painting Complete decorative brackets above doors Signage on building
U - SEWER TIE IN 06/19/2020 APPROVED - AS NOTED JGIBSON
Note: THIS IS A REINSPECTION FINAL CONNECTION WAS MADE
GRAVITY SEWER 06/19/2020 APPROVED JGIBSON
FOUNDATION SURVEY - OFFICE USE ONLY 06/19/2020 APPROVED PBUCKLEY
EXTERIOR ARCHITECTURAL FEATURES 06/18/2020 Disapproved - NO FEE BDAWSON
Note: - Finalize all details on exterior prior to calling in reinspection. Door trim Door painting Complete decorative brackets above doors Signage on building
ELECTRIC - EARLY POWER 06/08/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 2:30
ABOVE CEILING 06/03/2020 APPROVED - AS NOTED RMARTIN
Note: NO DROP CEILING, ALL M.E.P LOOKED AT HARD CEILINGS ON ROUGH
INSULATION 04/30/2020 APPROVED JDELBONIS
HVAC ROUGH 04/28/2020 APPROVED - AS NOTED RMARTIN
Note: CHRIS WENT AND DID THE INSPECTION, PRIOR TO HIS DENTIST APPT. HE SIGNED THE PLACARD
HVAC ROUGH 04/24/2020 CANCELLED BY APPLICANT CPISCITELLI
Note: THIS IS A REINSPECTION need to inspect fresh air and bathfan venting. also need to see balancing dampers on return trip
ROOF VALLEY & METAL 04/24/2020 APPROVED JDELBONIS
FRAMING 04/24/2020 APPROVED JDELBONIS
PLUMBING 2ND ROUGH 04/22/2020 APPROVED JGIBSON
Note: THIS IS A REINSPECTION NEED 5' HEAD TEST WATER PRESSURE GOOD
PLUMBING 2ND ROUGH 04/21/2020 CANCELLED BY APPLICANT WEB
ELECTRIC 2ND ROUGH 04/21/2020 APPROVED RMARTIN
ELECTRIC 2ND ROUGH 04/21/2020 CANCELLED BY APPLICANT WEB
FRAMING 04/21/2020 CANCELLED BY APPLICANT WEB
FRAMING 04/20/2020 APPROVED - AS NOTED JDELBONIS
Note: trusses need b2by 4s added studs and top plate need repair straps doors need to be screwed as per specs
ELECTRIC 2ND ROUGH 04/20/2020 PARTIALLY APPROVED RMARTIN
Note: F/F IN REST ROOMS CHECK MISC. NAIL PLATES
PLUMBING 2ND ROUGH 04/20/2020 PARTIALLY APPROVED JGIBSON
Note: NEED 5' HEAD TEST WATER PRESSURE GOOD
HVAC ROUGH 04/20/2020 PARTIALLY APPROVED CPISCITELLI
Note: need to inspect fresh air and bathfan venting. also need to see balancing dampers on return trip
STOREFRONT 04/14/2020 APPROVED - AS NOTED JDELBONIS
Note: windows ok to install top of frame on doubble window nere side door needs sealent doors frames need to be screwed in acording to specifications in papper work
LATH/BRICK/WATER BARRIER 03/25/2020 APPROVED JDELBONIS
ROOF SHEATHING / BRACE / TIE DOWN 03/12/2020 APPROVED JDELBONIS
LINTEL 02/20/2020 APPROVED - AS NOTED FWILLIS
Note: Lintels being used are Lotts and Pro-Crete. Approved Plans show Cast Crete as being the Lintels used. Need clarification showing its okay to use Lintels other than Cast Crete. Verify before or at next Inspection.
MONOLITHIC SLAB 02/12/2020 APPROVED JDELBONIS
FOOTER 02/12/2020 APPROVED JDELBONIS
U - SEWER TIE IN 02/12/2020 PARTIALLY APPROVED JGIBSON
Note: THIS WAS FOR THE TIE IN TO SEWER MAIN FROM SITE CONYTRACTOR AND RAN UP TO WITH-IN 5' OF BUILDING MAIN DRAIN
PLUMBING 1ST ROUGH 02/10/2020 APPROVED - AS NOTED JGIBSON
Note: NEED STAMP PLANS BY NEXT INSPECTION
ELECTRIC 1ST ROUGH 02/10/2020 APPROVED - AS NOTED RMARTIN
Note: NEED TO HAVE CITY APPROVED STAMPED SET OF PLANS ON SITE

Review History

Department Status Date In Date Out
ELEC COMPLETE 06/26/2020 06/29/2020
Note: Released By: JMUNSON
BLD COMPLETE 06/08/2020 06/12/2020
Note: Released By: FREODICA
BLD COMPLETE 03/11/2020 03/25/2020
Note: Released By: FREODICA Revision: Changed lintels from cast-crete to Lott's concrete FL 17867.1 and Pro-crete precast FL 23932.
BLD HOLD 02/24/2020 03/09/2020
Note: Held By: FREODICA Revision: lintel subtitute. Provide Florida product approval Number for Lott's and Procrete lintels as substitute from Cast- Crete per FS 553.842. FReodica-386-986-4734.
MECH COMPLETE 01/30/2020 01/31/2020
Note: Released By: CPISCITELLI
MECH HOLD 12/20/2019 12/23/2019
Note: Held By: CPISCITELLI Unable to read layout. Not dark enough
MECH COMPLETE 11/03/2019 11/05/2019
Note: Released By: PBUCKLEY
BLD COMPLETE 11/03/2019 11/06/2019
Note: Released By: PBUCKLEY
PLUM COMPLETE 11/03/2019 11/05/2019
Note: Released By: PBUCKLEY
ARCHR COMPLETE 10/17/2019 10/29/2019
Note: Released By: BDAWSON
BLD COMPLETE 10/17/2019 10/28/2019
Note: Released By: PBUCKLEY Held By: PBUCKLEY Please see plan correction notes on Plan Sheet A1.1. Corrections necessary to Plan Sheet A1.1 and A4.0. Please contact Patrick Buckley at 386-986-3786 with questions.
DSD COMPLETE 10/17/2019 10/23/2019
Note: Released By: DRAMIREZ
ELEC COMPLETE 10/17/2019 10/28/2019
Note: Released By: JMUNSON
FI1 COMPLETE 10/17/2019 10/31/2019
Note: Released By: WMILLER
MECH HOLD 10/17/2019 10/28/2019
Note: Held By: CPISCITELLI Provide mechanical drawings, duct drawings, and equipment specs
PLUM HOLD 10/17/2019 10/28/2019
Note: Held By: PBUCKLEY Please provide plumbing isometric plan (sometimes referred to as a plumbing riser diagram) for drain, waste, vent system and water piping system.
UD1 COMPLETE 10/17/2019 10/23/2019
Note: Released By: CJOHNSON

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 06/22/2020
SITE PLAN 20 ¤20.00 11/09/2019
SURCHARGE FS 533.721 ¤24.14 11/09/2019
SURCHARGE - FS 468.631 ¤36.20 11/09/2019
3% TRANS IMPACT FEE CREDIT (¤323.85) 11/09/2019
ADMIN COMMERCIAL ¤60.00 11/09/2019
ELECTRIC FEE ¤237.00 11/09/2019
3% FIRE IMPACT FEE CREDIT (¤25.42) 11/09/2019
IMPACT FEE FIRE ¤815.62 11/09/2019
IMPACT FEE FIRE ¤31.72 11/09/2019
IMPACT FEE TRANSPORTATION ¤404.10 11/09/2019
IMPACT FEE TRANSPORTATION ¤10,391.04 11/09/2019
MECHANICAL FEE ¤237.00 11/09/2019
PERMIT FEE ¤1,622.50 11/09/2019
PLAN CHECK FEE ¤339.25 11/09/2019
PLUMBING FEE ¤237.00 11/09/2019
Fees Total Due: ¤0.00 Total Paid: ¤14,146.30