I want to search for...

Permit #2019100737

Permit Details

Status: COED

Parcel Id: 07-11-31-7029-00550-0040
CONDITIONED SPACE: 1983 sqft
GARAGE: 516 sqft
OPENED PORCH (WITH ROOF) : 106 sqft
OPENED PORCH (WITH ROOF) : 48 sqft
Total Square Footage: 2653 sqft
Block: 00550
Subdivision: 2209 - SECTION 29-ROYAL PALMS
Job Phone: 407-807-0656
Location Address: 110 RYAN DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/05/2019
NOC: RECORDED
Applicant name: NAVIN SUGRIM
Owner: DLP BRITE HOMES LLC

Address

605 PALENCIA CLUN DRIVE

ST AUGUSTINE, FL 32095

Lot: 0040
Contracted Stated Job Value: ¤135,076.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

DLP BUILDERS LLC
Status Location Address State License Number Phone
CANCEL

7345 GREENBRIAR PKWY

ORLANDO, FL 32819

CBC1263567 (Exp: 08/31/2022) 407-807-0656

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/15/2020 FINAL APPROVED MMESSER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Range blocking kitchen outlet. Bathroom sink fixtures not installed. Wall lights not installed in bath. INSPECTION STOPPED.
BLD - BUILDING FINAL 09/11/2020 CANCELLED BY APPLICANT JBODEN
Note: THIS IS A REINSPECTION Range blocking kitchen outlet. Bathroom sink fixtures not installed. Wall lights not installed in bath. INSPECTION STOPPED.
U -UTILITY RESIDENTIAL FINAL 09/02/2020 FINAL APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION
U -UTILITY RESIDENTIAL FINAL 08/31/2020 CANCELLED BY APPLICANT LFITZGERALD
BLD - BUILDING FINAL 08/31/2020 Disapproved -FEE REQUIRED MMESSER
Note: Range blocking kitchen outlet. Bathroom sink fixtures not installed. Wall lights not installed in bath. INSPECTION STOPPED.
FINAL SURVEY (OFFICE USE ONLY) 08/27/2020 FINAL APPROVED KHOWELL
ELECTRIC - EARLY POWER 08/27/2020 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION Load side conductors can not be terminated prior to early power inspection 8/27/20 EMAILED FPL RELEASED POWER 9:50
FINAL SURVEY (OFFICE USE ONLY) 08/25/2020 Disapproved - NO FEE KHOWELL
Note: SPOKE WITH SURVEYOR ABOUT 2 BAD ELEVATIONS AT THE BACK OF THE HOUSE, HE WILL HAVE RESHOT AND SUBMIT NEW SURVEY
ROW - FINAL APRON (AFTER POUR) 08/25/2020 APPROVED KHOWELL
ROW FIELD SURVEY /GRADING CERTIFICATION 08/25/2020 APPROVED - AS NOTED KHOWELL
Note: SPOKE WITH SURVEYOR ABOUT 2 BAD ELEVATIONS AT THE BACK OF THE HOUSE, HE WILL HAVE RESHOT AND SUBMIT NEW SURVEY
ROW - STORMWATER FINAL 08/25/2020 APPROVED KHOWELL
ROW - FINAL APRON (AFTER POUR) 08/24/2020 Disapproved - NO FEE KHOWELL
Note: FINAL SURVEY NEEDS TO BE APPROVED PRIOR TO SCHEDULING THIS INSPECTIONS
ROW - STORMWATER FINAL 08/24/2020 Disapproved - NO FEE KHOWELL
Note: FINAL SURVEY NEEDS TO BE APPROVED PRIOR TO SCHEDULING THIS INSPECTIONS
ELECTRIC - EARLY POWER 08/19/2020 Disapproved - NO FEE JMUNSON
Note: Load side conductors can not be terminated prior to early power inspection
ELECTRIC - EARLY POWER 08/17/2020 Disapproved - NO FEE RMARTIN
Note: ALL DOORS LOCKED, NEED ACCESS FOR INSPECTION
ROW - STORMWATER FINAL 08/17/2020 Disapproved - NO FEE KHOWELL
Note: DUMPSTER NEEDS TO BE REMOVED AND ANY DAMAGE NEEDS TO BE REPAIRED IN THE SWALE AREA / R.O.W. ASPHALT PATCH NEEDS TO BE DONE ON ALMOST THE WHOLE LOT, FINAL SURVEY NEEDS TO BE APPROVED PRIOR TO SCHEDULING THIS INSPECTIONS
ROW - FINAL APRON (AFTER POUR) 08/17/2020 Disapproved - NO FEE KHOWELL
Note: ASPHALT PATCH NEEDS TO BE DONE ON ALMOST THE WHOLE LOT, FINAL SURVEY NEEDS TO BE APPROVED PRIOR TO SCHEDULING THIS INSPECTIONS
ROW- PRE-APRON (PRE-POUR) 07/30/2020 APPROVED - AS NOTED KHOWELL
U - SEWER TIE IN 07/22/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 07/22/2020 APPROVED JGIBSON
LATH/BRICK/ WATER BARRIER 07/01/2020 APPROVED MMESSER
Note: THIS IS A REINSPECTION not ready for inspection
LATH/BRICK/ WATER BARRIER 06/30/2020 Disapproved -FEE REQUIRED MMESSER
Note: not ready for inspection
PEP TANK INSTALLATION REQUEST 06/25/2020 APPROVED CSTONE
INSULATION 06/25/2020 APPROVED MMESSER
ALL ROUGH 06/24/2020 APPROVED MMESSER
Note: THIS IS A REINSPECTION
ROOF VALLEY & METAL 06/23/2020 APPROVED MMESSER
ALL ROUGH 06/23/2020 CANCELLED BY APPLICANT MMESSER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/22/2020 APPROVED MMESSER
Note: THIS IS A REINSPECTION Wall Sheathing at front entrance incomplete. Approved plans in construction box wet ripped and unreadable. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL Twist Straps in Garage are not Wood to Masonry strap. INSPECTION DISCONTINUED.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/15/2020 Disapproved - NO FEE FWILLIS
Note: Wall Sheathing at front entrance incomplete. Approved plans in construction box wet ripped and unreadable. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL Twist Straps in Garage are not Wood to Masonry strap. INSPECTION DISCONTINUED.
ELECTRIC-TUG 06/15/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 10:15
ELECTRIC-TUG 06/10/2020 Disapproved -FEE REQUIRED JMUNSON
Note: Service not there
TIE BEAM / LINTEL 06/04/2020 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 06/03/2020 APPROVED TBAKER
MONOLITHIC SLAB 04/02/2020 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 03/30/2020 CANCELLED BY APPLICANT FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 03/27/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 03/11/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 06/03/2020 06/03/2020
Note: Released By: ELENS
ENGIN1 COMPLETE 06/03/2020 06/03/2020
Note: Released By: TBAKER
MECH COMPLETE 11/19/2019 11/20/2019
Note: Released By: CPISCITELLI
SWALE COMPLETE 10/23/2019 12/03/2019
Note: Released By: TBAKER
BLD COMPLETE 10/17/2019 10/24/2019
Note: Released By: MGARRETT
CUSVC COMPLETE 10/17/2019 10/18/2019
Note: Released By: HHAND
ELEC COMPLETE 10/17/2019 10/21/2019
Note: Released By: JMUNSON
ENGIN1 COMPLETE 10/17/2019 10/23/2019
Note: Released By: TBAKER
LOCATE COMPLETE 10/17/2019 10/21/2019
Note: Released By: CSTONE
MECH HOLD 10/17/2019 10/22/2019
Note: Held By: CPISCITELLI Verify concrete wall insulation. Plan shows R8.6 and energy calcs say R15.1. Revise to match
PLUM COMPLETE 10/17/2019 10/24/2019
Note: Released By: MGARRETT
SW1 COMPLETE 10/17/2019 10/22/2019
Note: Released By: JMUNSON
UD1 COMPLETE 10/17/2019 10/22/2019
Note: Released By: AHALL
ZON COMPLETE 10/17/2019 10/18/2019
Note: Released By: ELENS

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 10/26/2020
REINSPECTION FEE ¤40.00 08/27/2020
REINSPECTION FEE ¤40.00 08/27/2020
CONTRACTOR CHANGE ¤40.00 05/06/2020
ELECTRIC FEE ¤208.20 12/05/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 12/05/2019
IMPACT FEE FIRE ¤223.38 12/05/2019
IMPACT FEE PARKS ¤849.24 12/05/2019
IMPACT FEE SCHOOL ¤3,600.00 12/05/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 12/05/2019
MECHANICAL FEE ¤208.20 12/05/2019
WATER -IRRIGATION INSPECTION ¤25.00 12/05/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 12/05/2019
PLAN CHECK FEE ¤98.80 12/05/2019
PLUMBING FEE ¤208.20 12/05/2019
NEW RESIDENTIAL INSPECTIONS ¤494.00 12/05/2019
SITE PLAN 20 ¤20.00 12/05/2019
SURCHARGE FS 533.721 ¤11.59 12/05/2019
SURCHARGE - FS 468.631 ¤17.38 12/05/2019
STORM WATER PERMIT FEES ¤80.00 12/05/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 12/05/2019
SEWER CREDIT (¤1,466.00) 12/05/2019
SEWER INSPECTION ¤25.00 12/05/2019
SEWER CAPITAL FACILITY ¤4,515.25 12/05/2019
WATER CAPITAL FACILITY FEE ¤3,314.84 12/05/2019
METER - DEPOSIT ¤60.00 12/05/2019
WATER- TURN ON ¤25.00 12/05/2019
ADMIN FEE ¤20.00 12/05/2019
CONNECTION FEES ¤985.25 12/05/2019
Fees Total Due: ¤0.00 Total Paid: ¤15,234.19