I want to search for...
Permit #2019100737
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00550-0040 |
| CONDITIONED SPACE: 1983 sqft |
| GARAGE: 516 sqft |
| OPENED PORCH (WITH ROOF) : 106 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| Total Square Footage: 2653 sqft |
| Block: 00550 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Job Phone: 407-807-0656 |
| Location Address: 110 RYAN DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/05/2019 |
| NOC: RECORDED |
| Applicant name: NAVIN SUGRIM |
| Owner: DLP BRITE HOMES LLC |
|
Address 605 PALENCIA CLUN DRIVE ST AUGUSTINE, FL 32095 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤135,076.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DLP BUILDERS LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
CBC1263567 (Exp: 08/31/2022) | 407-807-0656 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/15/2020 | FINAL APPROVED | MMESSER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Range blocking kitchen outlet. Bathroom sink fixtures not installed. Wall lights not installed in bath. INSPECTION STOPPED. | |||
| BLD - BUILDING FINAL | 09/11/2020 | CANCELLED BY APPLICANT | JBODEN |
| Note: THIS IS A REINSPECTION Range blocking kitchen outlet. Bathroom sink fixtures not installed. Wall lights not installed in bath. INSPECTION STOPPED. | |||
| U -UTILITY RESIDENTIAL FINAL | 09/02/2020 | FINAL APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 08/31/2020 | CANCELLED BY APPLICANT | LFITZGERALD |
| BLD - BUILDING FINAL | 08/31/2020 | Disapproved -FEE REQUIRED | MMESSER |
| Note: Range blocking kitchen outlet. Bathroom sink fixtures not installed. Wall lights not installed in bath. INSPECTION STOPPED. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/27/2020 | FINAL APPROVED | KHOWELL |
| ELECTRIC - EARLY POWER | 08/27/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION Load side conductors can not be terminated prior to early power inspection 8/27/20 EMAILED FPL RELEASED POWER 9:50 | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/25/2020 | Disapproved - NO FEE | KHOWELL |
| Note: SPOKE WITH SURVEYOR ABOUT 2 BAD ELEVATIONS AT THE BACK OF THE HOUSE, HE WILL HAVE RESHOT AND SUBMIT NEW SURVEY | |||
| ROW - FINAL APRON (AFTER POUR) | 08/25/2020 | APPROVED | KHOWELL |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/25/2020 | APPROVED - AS NOTED | KHOWELL |
| Note: SPOKE WITH SURVEYOR ABOUT 2 BAD ELEVATIONS AT THE BACK OF THE HOUSE, HE WILL HAVE RESHOT AND SUBMIT NEW SURVEY | |||
| ROW - STORMWATER FINAL | 08/25/2020 | APPROVED | KHOWELL |
| ROW - FINAL APRON (AFTER POUR) | 08/24/2020 | Disapproved - NO FEE | KHOWELL |
| Note: FINAL SURVEY NEEDS TO BE APPROVED PRIOR TO SCHEDULING THIS INSPECTIONS | |||
| ROW - STORMWATER FINAL | 08/24/2020 | Disapproved - NO FEE | KHOWELL |
| Note: FINAL SURVEY NEEDS TO BE APPROVED PRIOR TO SCHEDULING THIS INSPECTIONS | |||
| ELECTRIC - EARLY POWER | 08/19/2020 | Disapproved - NO FEE | JMUNSON |
| Note: Load side conductors can not be terminated prior to early power inspection | |||
| ELECTRIC - EARLY POWER | 08/17/2020 | Disapproved - NO FEE | RMARTIN |
| Note: ALL DOORS LOCKED, NEED ACCESS FOR INSPECTION | |||
| ROW - STORMWATER FINAL | 08/17/2020 | Disapproved - NO FEE | KHOWELL |
| Note: DUMPSTER NEEDS TO BE REMOVED AND ANY DAMAGE NEEDS TO BE REPAIRED IN THE SWALE AREA / R.O.W. ASPHALT PATCH NEEDS TO BE DONE ON ALMOST THE WHOLE LOT, FINAL SURVEY NEEDS TO BE APPROVED PRIOR TO SCHEDULING THIS INSPECTIONS | |||
| ROW - FINAL APRON (AFTER POUR) | 08/17/2020 | Disapproved - NO FEE | KHOWELL |
| Note: ASPHALT PATCH NEEDS TO BE DONE ON ALMOST THE WHOLE LOT, FINAL SURVEY NEEDS TO BE APPROVED PRIOR TO SCHEDULING THIS INSPECTIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 07/30/2020 | APPROVED - AS NOTED | KHOWELL |
| U - SEWER TIE IN | 07/22/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 07/22/2020 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 07/01/2020 | APPROVED | MMESSER |
| Note: THIS IS A REINSPECTION not ready for inspection | |||
| LATH/BRICK/ WATER BARRIER | 06/30/2020 | Disapproved -FEE REQUIRED | MMESSER |
| Note: not ready for inspection | |||
| PEP TANK INSTALLATION REQUEST | 06/25/2020 | APPROVED | CSTONE |
| INSULATION | 06/25/2020 | APPROVED | MMESSER |
| ALL ROUGH | 06/24/2020 | APPROVED | MMESSER |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 06/23/2020 | APPROVED | MMESSER |
| ALL ROUGH | 06/23/2020 | CANCELLED BY APPLICANT | MMESSER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/22/2020 | APPROVED | MMESSER |
| Note: THIS IS A REINSPECTION Wall Sheathing at front entrance incomplete. Approved plans in construction box wet ripped and unreadable. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL Twist Straps in Garage are not Wood to Masonry strap. INSPECTION DISCONTINUED. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/15/2020 | Disapproved - NO FEE | FWILLIS |
| Note: Wall Sheathing at front entrance incomplete. Approved plans in construction box wet ripped and unreadable. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL Twist Straps in Garage are not Wood to Masonry strap. INSPECTION DISCONTINUED. | |||
| ELECTRIC-TUG | 06/15/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 10:15 | |||
| ELECTRIC-TUG | 06/10/2020 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: Service not there | |||
| TIE BEAM / LINTEL | 06/04/2020 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 06/03/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 04/02/2020 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 03/30/2020 | CANCELLED BY APPLICANT | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/27/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 03/11/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 06/03/2020 | 06/03/2020 |
| Note: Released By: ELENS | |||
| ENGIN1 | COMPLETE | 06/03/2020 | 06/03/2020 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 11/19/2019 | 11/20/2019 |
| Note: Released By: CPISCITELLI | |||
| SWALE | COMPLETE | 10/23/2019 | 12/03/2019 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 10/17/2019 | 10/24/2019 |
| Note: Released By: MGARRETT | |||
| CUSVC | COMPLETE | 10/17/2019 | 10/18/2019 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 10/17/2019 | 10/21/2019 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 10/17/2019 | 10/23/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 10/17/2019 | 10/21/2019 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 10/17/2019 | 10/22/2019 |
| Note: Held By: CPISCITELLI Verify concrete wall insulation. Plan shows R8.6 and energy calcs say R15.1. Revise to match | |||
| PLUM | COMPLETE | 10/17/2019 | 10/24/2019 |
| Note: Released By: MGARRETT | |||
| SW1 | COMPLETE | 10/17/2019 | 10/22/2019 |
| Note: Released By: JMUNSON | |||
| UD1 | COMPLETE | 10/17/2019 | 10/22/2019 |
| Note: Released By: AHALL | |||
| ZON | COMPLETE | 10/17/2019 | 10/18/2019 |
| Note: Released By: ELENS |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 10/26/2020 |
| REINSPECTION FEE | ¤40.00 | 08/27/2020 |
| REINSPECTION FEE | ¤40.00 | 08/27/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 05/06/2020 |
| ELECTRIC FEE | ¤208.20 | 12/05/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 12/05/2019 |
| IMPACT FEE FIRE | ¤223.38 | 12/05/2019 |
| IMPACT FEE PARKS | ¤849.24 | 12/05/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 12/05/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 12/05/2019 |
| MECHANICAL FEE | ¤208.20 | 12/05/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/05/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 12/05/2019 |
| PLAN CHECK FEE | ¤98.80 | 12/05/2019 |
| PLUMBING FEE | ¤208.20 | 12/05/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤494.00 | 12/05/2019 |
| SITE PLAN 20 | ¤20.00 | 12/05/2019 |
| SURCHARGE FS 533.721 | ¤11.59 | 12/05/2019 |
| SURCHARGE - FS 468.631 | ¤17.38 | 12/05/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 12/05/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 12/05/2019 |
| SEWER CREDIT | (¤1,466.00) | 12/05/2019 |
| SEWER INSPECTION | ¤25.00 | 12/05/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 12/05/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 12/05/2019 |
| METER - DEPOSIT | ¤60.00 | 12/05/2019 |
| WATER- TURN ON | ¤25.00 | 12/05/2019 |
| ADMIN FEE | ¤20.00 | 12/05/2019 |
| CONNECTION FEES | ¤985.25 | 12/05/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,234.19 |