Permit #2019100743
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00990-0200 |
| CONDITIONED SPACE: 2306 sqft |
| GARAGE: 466 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| OPENED PORCH (WITH ROOF) : 138 sqft |
| Total Square Footage: 2942 sqft |
| Block: 00990 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 407-807-0656 |
| Location Address: 98 BUD HOLLOW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/07/2020 |
| NOC: RECORDED |
| Applicant name: NAVIN SUGRIM |
| Owner: DLP BRITE HOMES LLC |
|
Address 605 PALENCIA CLUB DRIVE ST AUGUSTINE, FL 32095 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤148,359.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DLP BUILDERS LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
CBC1263567 (Exp: 08/31/2022) | 407-807-0656 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/25/2020 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION need weather stripping at front door...guest bath exhaust not working.....need bath exhaust installed and operating at master bath | |||
| BLD - BUILDING FINAL | 06/22/2020 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: need weather stripping at front door...guest bath exhaust not working.....need bath exhaust installed and operating at master bath | |||
| U -UTILITY RESIDENTIAL FINAL | 06/22/2020 | APPROVED | AHALL |
| ROW - FINAL APRON (AFTER POUR) | 06/18/2020 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 06/18/2020 | APPROVED - AS NOTED | RGROSS |
| Note: HIGHLY RECOMMEND INSTALLING A RIZOR ON THE PEP TANK TO PREVENT FLOODING THE TANK. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/12/2020 | APPROVED - AS NOTED | RGROSS |
| Note: HIGHLY RECOMMEND A RISOR BE INSTALLED ON THE PEP TANK LID TO PREVENT STORM WATER FROM POSSIBLE FLOODING AROUND THE LID. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/12/2020 | APPROVED - AS NOTED | RGROSS |
| Note: SEE NOTE ON FIELD SURVEY INSPECTION | |||
| ELECTRIC - EARLY POWER | 05/26/2020 | PARTIALLY APPROVED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 12:55 | |||
| ELECTRIC - EARLY POWER | 05/26/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Robert did this inspection but put in wrong result code. Emailed FPL at 4:32 pm | |||
| ROW- PRE-APRON (PRE-POUR) | 05/20/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION CULVERT OUT OF TOLERANCE. SEE SWALE PLAN. NOT 4 INCHES THICK AT THE GARAGE ENTRANCE. CULVERT NOW IN TOLERANCE BUT THE POUR AREA IS NOT 4 INCHES THICK THROUGHOUT THE POUR. PHOTO'S ATTACHED. ONLY 2 1/2 - 3 ABOUT 16 - 17 FT FROM THE ROAD EDGE. MUST BE A MINMUM OF 4 INCHES THICKNESS THROUGHOUT THE ENTIRE POUR. MORE ATTACHED PHOTO'S. READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 05/19/2020 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION CULVERT OUT OF TOLERANCE. SEE SWALE PLAN. NOT 4 INCHES THICK AT THE GARAGE ENTRANCE. CULVERT NOW IN TOLERANCE BUT THE POUR AREA IS NOT 4 INCHES THICK THROUGHOUT THE POUR. PHOTO'S ATTACHED. ONLY 2 1/2 - 3 ABOUT 16 - 17 FT FROM THE ROAD EDGE. MUST BE A MINMUM OF 4 INCHES THICKNESS THROUGHOUT THE ENTIRE POUR. MORE ATTACHED PHOTO'S. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/18/2020 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION CULVERT OUT OF TOLERANCE. SEE SWALE PLAN. NOT 4 INCHES THICK AT THE GARAGE ENTRANCE. CULVERT NOW IN TOLERANCE BUT THE POUR AREA IS NOT 4 INCHES THICK THROUGHOUT THE POUR. PHOTO'S ATTACHED. ONLY 2 1/2 - 3 ABOUT 16 - 17 FT FROM THE ROAD EDGE. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/14/2020 | Disapproved - NO FEE | RGROSS |
| Note: CULVERT OUT OF TOLERANCE. SEE SWALE PLAN. NOT 4 INCHES THICK AT THE GARAGE ENTRANCE. | |||
| U - SEWER TIE IN | 05/04/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 05/04/2020 | APPROVED | JGIBSON |
| PEP TANK INSTALLATION REQUEST | 04/07/2020 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 04/03/2020 | APPROVED | JCOLASANTI |
| INSULATION | 04/03/2020 | APPROVED | JCOLASANTI |
| ALL ROUGH | 03/26/2020 | APPROVED | JCOLASANTI |
| ROOF VALLEY & METAL | 03/06/2020 | APPROVED | JCOLASANTI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/04/2020 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION need to stap trusses at beam rear porch | |||
| ELECTRIC-TUG | 03/04/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 10:10 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/02/2020 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: need to stap trusses at beam rear porch | |||
| TIE BEAM / LINTEL | 02/18/2020 | APPROVED | JCOLASANTI |
| MONOLITHIC SLAB | 02/10/2020 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 02/07/2020 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: missing (3) #5 right side footer per plan | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/07/2020 | APPROVED | TBAKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/04/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 01/10/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| PLUM | COMPLETE | 02/18/2020 | 03/03/2020 |
| Note: Released By: FREODICA Revision : changed plumbing riser diagram. | |||
| ENGIN1 | COMPLETE | 02/04/2020 | 02/07/2020 |
| Note: Released By: TBAKER | |||
| ENGIN1 | HOLD | 01/30/2020 | 01/31/2020 |
| Note: Held By: TBAKER Please show garage slab elevation on foundation survey | |||
| MECH | COMPLETE | 12/17/2019 | 12/17/2019 |
| Note: Released By: CPISCITELLI | |||
| ZON | COMPLETE | 12/17/2019 | 12/18/2019 |
| Note: Released By: AMOBLEY | |||
| SWALE | COMPLETE | 10/23/2019 | 12/03/2019 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 10/17/2019 | 10/24/2019 |
| Note: Released By: MGARRETT | |||
| CUSVC | COMPLETE | 10/17/2019 | 10/18/2019 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 10/17/2019 | 10/22/2019 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 10/17/2019 | 10/23/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 10/17/2019 | 10/21/2019 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 10/17/2019 | 10/23/2019 |
| Note: Held By: CPISCITELLI Verify concrete wall insulation. Plan shows R8.6 and energy calcs say R15.1. Revise to match | |||
| PLUM | COMPLETE | 10/17/2019 | 10/24/2019 |
| Note: Released By: MGARRETT | |||
| SW1 | COMPLETE | 10/17/2019 | 10/22/2019 |
| Note: Released By: JMUNSON | |||
| UD1 | COMPLETE | 10/17/2019 | 10/22/2019 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 10/17/2019 | 10/18/2019 |
| Note: Held By: AMOBLEY AC pad location does not match on landscape and site plan Flood map number is incorrect on survey |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/29/2020 |
| REINSPECTION FEE | ¤40.00 | 05/06/2020 |
| REINSPECTION FEE | ¤40.00 | 05/06/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 05/06/2020 |
| REVISION | ¤40.00 | 05/06/2020 |
| SITE PLAN 20 | ¤20.00 | 01/07/2020 |
| SURCHARGE FS 533.721 | ¤12.92 | 01/07/2020 |
| SURCHARGE - FS 468.631 | ¤19.37 | 01/07/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/07/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 01/07/2020 |
| SEWER CREDIT | (¤1,028.98) | 01/07/2020 |
| SEWER INSPECTION | ¤25.00 | 01/07/2020 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 01/07/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 01/07/2020 |
| ELECTRIC FEE | ¤229.20 | 01/07/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 01/07/2020 |
| IMPACT FEE FIRE | ¤223.38 | 01/07/2020 |
| IMPACT FEE PARKS | ¤849.24 | 01/07/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/07/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 01/07/2020 |
| MECHANICAL FEE | ¤229.20 | 01/07/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/07/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/07/2020 |
| PLAN CHECK FEE | ¤112.80 | 01/07/2020 |
| PLUMBING FEE | ¤229.20 | 01/07/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤564.00 | 01/07/2020 |
| METER - DEPOSIT | ¤60.00 | 01/07/2020 |
| WATER- TURN ON | ¤25.00 | 01/07/2020 |
| ADMIN FEE | ¤20.00 | 01/07/2020 |
| CONNECTION FEES | ¤985.25 | 01/07/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,861.53 |