Permit #2019101146

Permit Details

Status: COED

Parcel Id: 07-11-31-7026-00610-0090
CONDITIONED SPACE: 1845 sqft
GARAGE: 892 sqft
OPENED PORCH (WITH ROOF) : 270 sqft
OPENED PORCH (WITH ROOF) : 43 sqft
Total Square Footage: 3050 sqft
Block: 00610
Subdivision: 2153 - SECTION 26-PINE GROVE
Job Phone: 386-447-4151
Location Address: 2 PINEASH LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/07/2019
NOC: RECORDED
Applicant name: GENE WARREN SLONE
Owner: GEIS, GERALD & SUE

Address

140 N BRANDFORD RD

WALLINGFORD, CT 06492

Lot: 0090
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

FLORIDA GREEN CONSTRUCTION INC.
Status Location Address State License Number Phone
INACTIVE

870 E RETTA STREET

DELEON SPRINGS, FL 32130

CBC1260957 (Exp: 08/31/2026) 407-580-2657

Sub Contractors

OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
GREGG A MCANALLY
Status Location Address State License Number Phone
INACTIVE

3370 AGRICULTURAL CENTER DRIVE

PALM COAST, FL 32092

CAC1815760 (Exp: 08/31/2022) 904-829-8898
JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/07/2020 FINAL APPROVED MMESSER
U -UTILITY RESIDENTIAL FINAL 08/05/2020 FINAL APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION pep panel required to be with in front corner of house (with in 5 ft from corner and 5ft from existinggrade). Please relocate electrical connection to this area and then contact Ivan at our utility dept. so pep panel can be rewired.
U -UTILITY RESIDENTIAL FINAL 08/03/2020 Disapproved - NO FEE LFITZGERALD
Note: pep panel required to be with in front corner of house (with in 5 ft from corner and 5ft from existinggrade). Please relocate electrical connection to this area and then contact Ivan at our utility dept. so pep panel can be rewired.
ROW - STORMWATER FINAL 07/31/2020 APPROVED RGROSS
ROW - FINAL APRON (AFTER POUR) 07/31/2020 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 07/29/2020 APPROVED - AS NOTED KHOWELL
Note: REMOVE THE CONCRETE THAT IS POURED PAST THE FOOTER INTO THE SWALE AREA ON BOTH SIDES OF THE MITERED END SECTIONS PRIOR TO CALLING IN AFTER-POUR INSPECTION AND ROW STORMWATER FINAL INSPECTIONS. REPAIR EROSION AROUND MITERED END SECTIONS AND CLEAN THE CULVERTS OUT.
FINAL SURVEY (OFFICE USE ONLY) 07/29/2020 APPROVED KHOWELL
GRAVITY SEWER TEST 06/12/2020 APPROVED JGIBSON
U - SEWER TIE IN 06/12/2020 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 05/20/2020 APPROVED RGROSS
PEP TANK INSTALLATION REQUEST 05/13/2020 APPROVED CSTONE
ELECTRIC - EARLY POWER 04/16/2020 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:13 am
LATH/BRICK/ WATER BARRIER 03/25/2020 APPROVED JCOLASANTI
INSULATION 03/10/2020 APPROVED JDELBONIS
ALL ROUGH 03/05/2020 APPROVED - AS NOTED JCOLASANTI
Note: Crown vent prohibited..P3106.3 a vent shall not be installed whiten two pipe diameters of the trap weir (in laundry room)
ROOF VALLEY & METAL 02/18/2020 APPROVED JDELBONIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/14/2020 APPROVED - AS NOTED JCOLASANTI
Note: nail valley strap left side of entrance
TIE BEAM / LINTEL 01/28/2020 APPROVED JDELBONIS
DOWN CELL 01/28/2020 APPROVED JDELBONIS
FOUND SURVEY APPROVED (OFFICE) 01/27/2020 APPROVED CMORALES
MONOLITHIC SLAB 01/03/2020 APPROVED JDELBONIS
Note: THIS IS A REINSPECTION compation report on site
MONOLITHIC SLAB 01/02/2020 Disapproved - NO FEE JCOLASANTI
Note: need compacon site at time of inspection per plan
PLUMBING 1ST ROUGH UNDERGROUND 12/30/2019 APPROVED JGIBSON
ELECTRIC TEMP POLE 11/22/2019 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 10:30
WATER METER INSTALLATION REQUEST 11/20/2019 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 07/20/2020 07/20/2020
Note: Released By: ELENS
ZON HOLD 07/17/2020 07/17/2020
Note: Held By: ELENS The pool is not part of this permit. The house requires six foundation plantings on right side facing the pubic right of way.
ZON HOLD 07/01/2020 07/02/2020
Note: Held By: TDOAK The property is 12,500 square feet and therefore requires 5 trees. A robellini palm does not as an understory tree unless it has a minimum of 3 feet of clear trunk. Please clarify.
ENGIN1 COMPLETE 07/01/2020 07/02/2020
Note: Released By: TBAKER
ZON COMPLETE 02/25/2020 02/25/2020
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 01/23/2020 01/27/2020
Note: Released By: CMORALES Foundation Survey
ENGIN1 HOLD 01/15/2020 01/17/2020
Note: Held By: TBAKER Please include slab elevation at garage
SWALE COMPLETE 11/01/2019 12/06/2019
Note: Released By: TBAKER
BLD COMPLETE 10/29/2019 11/07/2019
Note: Released By: PBUCKLEY
CUSVC COMPLETE 10/29/2019 10/30/2019
Note: Released By: AROSCOE
ELEC COMPLETE 10/29/2019 10/30/2019
Note: Released By: JMUNSON
ENGIN1 COMPLETE 10/29/2019 11/01/2019
Note: Released By: TBAKER
LOCATE COMPLETE 10/29/2019 10/31/2019
Note: Released By: CSTONE
MECH COMPLETE 10/29/2019 10/31/2019
Note: Released By: CPISCITELLI
PLUM COMPLETE 10/29/2019 11/07/2019
Note: Released By: PBUCKLEY
SW1 COMPLETE 10/29/2019 10/29/2019
Note: Released By: JMUNSON
UD1 COMPLETE 10/29/2019 11/01/2019
Note: Released By: AHALL
ZON COMPLETE 10/29/2019 10/30/2019
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
METER - DEPOSIT ¤60.00 11/07/2019
WATER- TURN ON ¤25.00 11/07/2019
ADMIN FEE ¤20.00 11/07/2019
CONNECTION FEES ¤985.25 11/07/2019
ELECTRIC FEE ¤213.00 11/07/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 11/07/2019
IMPACT FEE FIRE ¤223.38 11/07/2019
IMPACT FEE PARKS ¤849.24 11/07/2019
IMPACT FEE SCHOOL ¤3,600.00 11/07/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 11/07/2019
MECHANICAL FEE ¤213.00 11/07/2019
WATER -IRRIGATION INSPECTION ¤25.00 11/07/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 11/07/2019
PLAN CHECK FEE ¤102.00 11/07/2019
PLUMBING FEE ¤213.00 11/07/2019
NEW RESIDENTIAL INSPECTIONS ¤510.00 11/07/2019
SITE PLAN 20 ¤20.00 11/07/2019
SURCHARGE FS 533.721 ¤11.89 11/07/2019
SURCHARGE - FS 468.631 ¤17.84 11/07/2019
STORM WATER PERMIT FEES ¤80.00 11/07/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 11/07/2019
SEWER CREDIT (¤2,291.75) 11/07/2019
SEWER INSPECTION ¤25.00 11/07/2019
SEWER CAPITAL FACILITY ¤4,515.25 11/07/2019
WATER CAPITAL FACILITY FEE ¤3,314.84 11/07/2019
Fees Total Due: ¤0.00 Total Paid: ¤14,282.80