I want to search for...
Permit #2019101146
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00610-0090 |
| CONDITIONED SPACE: 1845 sqft |
| GARAGE: 892 sqft |
| OPENED PORCH (WITH ROOF) : 270 sqft |
| OPENED PORCH (WITH ROOF) : 43 sqft |
| Total Square Footage: 3050 sqft |
| Block: 00610 |
| Subdivision: 2153 - SECTION 26-PINE GROVE |
| Job Phone: 386-447-4151 |
| Location Address: 2 PINEASH LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/07/2019 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: GEIS, GERALD & SUE |
|
Address 140 N BRANDFORD RD WALLINGFORD, CT 06492 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
GREGG A MCANALLY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE PALM COAST, FL 32092 |
CAC1815760 (Exp: 08/31/2022) | 904-829-8898 |
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/07/2020 | FINAL APPROVED | MMESSER |
| U -UTILITY RESIDENTIAL FINAL | 08/05/2020 | FINAL APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION pep panel required to be with in front corner of house (with in 5 ft from corner and 5ft from existinggrade). Please relocate electrical connection to this area and then contact Ivan at our utility dept. so pep panel can be rewired. | |||
| U -UTILITY RESIDENTIAL FINAL | 08/03/2020 | Disapproved - NO FEE | LFITZGERALD |
| Note: pep panel required to be with in front corner of house (with in 5 ft from corner and 5ft from existinggrade). Please relocate electrical connection to this area and then contact Ivan at our utility dept. so pep panel can be rewired. | |||
| ROW - STORMWATER FINAL | 07/31/2020 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 07/31/2020 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/29/2020 | APPROVED - AS NOTED | KHOWELL |
| Note: REMOVE THE CONCRETE THAT IS POURED PAST THE FOOTER INTO THE SWALE AREA ON BOTH SIDES OF THE MITERED END SECTIONS PRIOR TO CALLING IN AFTER-POUR INSPECTION AND ROW STORMWATER FINAL INSPECTIONS. REPAIR EROSION AROUND MITERED END SECTIONS AND CLEAN THE CULVERTS OUT. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/29/2020 | APPROVED | KHOWELL |
| GRAVITY SEWER TEST | 06/12/2020 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 06/12/2020 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 05/20/2020 | APPROVED | RGROSS |
| PEP TANK INSTALLATION REQUEST | 05/13/2020 | APPROVED | CSTONE |
| ELECTRIC - EARLY POWER | 04/16/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:13 am | |||
| LATH/BRICK/ WATER BARRIER | 03/25/2020 | APPROVED | JCOLASANTI |
| INSULATION | 03/10/2020 | APPROVED | JDELBONIS |
| ALL ROUGH | 03/05/2020 | APPROVED - AS NOTED | JCOLASANTI |
| Note: Crown vent prohibited..P3106.3 a vent shall not be installed whiten two pipe diameters of the trap weir (in laundry room) | |||
| ROOF VALLEY & METAL | 02/18/2020 | APPROVED | JDELBONIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/14/2020 | APPROVED - AS NOTED | JCOLASANTI |
| Note: nail valley strap left side of entrance | |||
| TIE BEAM / LINTEL | 01/28/2020 | APPROVED | JDELBONIS |
| DOWN CELL | 01/28/2020 | APPROVED | JDELBONIS |
| FOUND SURVEY APPROVED (OFFICE) | 01/27/2020 | APPROVED | CMORALES |
| MONOLITHIC SLAB | 01/03/2020 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION compation report on site | |||
| MONOLITHIC SLAB | 01/02/2020 | Disapproved - NO FEE | JCOLASANTI |
| Note: need compacon site at time of inspection per plan | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/30/2019 | APPROVED | JGIBSON |
| ELECTRIC TEMP POLE | 11/22/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 10:30 | |||
| WATER METER INSTALLATION REQUEST | 11/20/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 07/20/2020 | 07/20/2020 |
| Note: Released By: ELENS | |||
| ZON | HOLD | 07/17/2020 | 07/17/2020 |
| Note: Held By: ELENS The pool is not part of this permit. The house requires six foundation plantings on right side facing the pubic right of way. | |||
| ZON | HOLD | 07/01/2020 | 07/02/2020 |
| Note: Held By: TDOAK The property is 12,500 square feet and therefore requires 5 trees. A robellini palm does not as an understory tree unless it has a minimum of 3 feet of clear trunk. Please clarify. | |||
| ENGIN1 | COMPLETE | 07/01/2020 | 07/02/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 02/25/2020 | 02/25/2020 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 01/23/2020 | 01/27/2020 |
| Note: Released By: CMORALES Foundation Survey | |||
| ENGIN1 | HOLD | 01/15/2020 | 01/17/2020 |
| Note: Held By: TBAKER Please include slab elevation at garage | |||
| SWALE | COMPLETE | 11/01/2019 | 12/06/2019 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 10/29/2019 | 11/07/2019 |
| Note: Released By: PBUCKLEY | |||
| CUSVC | COMPLETE | 10/29/2019 | 10/30/2019 |
| Note: Released By: AROSCOE | |||
| ELEC | COMPLETE | 10/29/2019 | 10/30/2019 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 10/29/2019 | 11/01/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 10/29/2019 | 10/31/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 10/29/2019 | 10/31/2019 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 10/29/2019 | 11/07/2019 |
| Note: Released By: PBUCKLEY | |||
| SW1 | COMPLETE | 10/29/2019 | 10/29/2019 |
| Note: Released By: JMUNSON | |||
| UD1 | COMPLETE | 10/29/2019 | 11/01/2019 |
| Note: Released By: AHALL | |||
| ZON | COMPLETE | 10/29/2019 | 10/30/2019 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 11/07/2019 |
| WATER- TURN ON | ¤25.00 | 11/07/2019 |
| ADMIN FEE | ¤20.00 | 11/07/2019 |
| CONNECTION FEES | ¤985.25 | 11/07/2019 |
| ELECTRIC FEE | ¤213.00 | 11/07/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 11/07/2019 |
| IMPACT FEE FIRE | ¤223.38 | 11/07/2019 |
| IMPACT FEE PARKS | ¤849.24 | 11/07/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/07/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 11/07/2019 |
| MECHANICAL FEE | ¤213.00 | 11/07/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/07/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 11/07/2019 |
| PLAN CHECK FEE | ¤102.00 | 11/07/2019 |
| PLUMBING FEE | ¤213.00 | 11/07/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤510.00 | 11/07/2019 |
| SITE PLAN 20 | ¤20.00 | 11/07/2019 |
| SURCHARGE FS 533.721 | ¤11.89 | 11/07/2019 |
| SURCHARGE - FS 468.631 | ¤17.84 | 11/07/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/07/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 11/07/2019 |
| SEWER CREDIT | (¤2,291.75) | 11/07/2019 |
| SEWER INSPECTION | ¤25.00 | 11/07/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 11/07/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 11/07/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,282.80 |