I want to search for...
Permit #2019110116
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00520-0020 |
| CONDITIONED SPACE: 1938 sqft |
| GARAGE: 568 sqft |
| OPENED PORCH (WITH ROOF) : 471 sqft |
| OPENED PORCH (WITH ROOF) : 154 sqft |
| Total Square Footage: 3131 sqft |
| Block: 00520 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-864-2199 |
| Location Address: 13 ELDER DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/06/2019 |
| NOC: RECORDED |
| Applicant name: MAXIM TARANNIK |
| Owner: RIVERA EFRAIN & CLEUZA F H&W |
|
Address 121 PINE LAKES PKWY N APT 514 PALM COAST, FL 32137 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤270,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLDEN MAGNOLIA, INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
RR282811984 (Exp: 08/31/2025) | 386-447-7007 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/04/2021 | FINAL APPROVED | TSTAUFFACHER |
| U -UTILITY RESIDENTIAL FINAL | 01/04/2021 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 12/22/2020 | APPROVED | KRUTH |
| ROW - STORMWATER FINAL | 11/16/2020 | CANCELLED BY APPLICANT | WEB |
| ROW - FINAL APRON (AFTER POUR) | 11/16/2020 | APPROVED | KRUTH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/09/2020 | APPROVED - AS NOTED | GBERTOLA |
| Note: FOR THE ROW FINAL NEED TO RAISE THE DRAINAGE CONVEYANCE ON THE LEFT SIDE BY THE FENCE AND ON THE RIGHT SIDE BY THE FENCE TO The subject lots drainage must not negatively impact any adjacent property. B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) | |||
| FINAL SURVEY (OFFICE USE ONLY) | 11/09/2020 | APPROVED | GBERTOLA |
| ROW- PRE-APRON (PRE-POUR) | 09/24/2020 | APPROVED - AS NOTED | KHOWELL |
| Note: * INSTALL A STRAIGHT UP AND DOWN FACE FORM BOARD SO THE INSIDE LINES UP WITH THE EXISTING EDGE OF PAVEMENT THE CONCRETE IS NOT ALLOWED TO BE POURED INTO THE ROADWAY. THE RIGHT SIDE IS WAY INTO THE ROADWAY ONLY ALLOWED TO BE 3/4" ABOVE THE EXISTING ASPHALT. * REPAIR WASHOUTS IN UPPER PAD AREA BEFORE YOU POUR AND SEND PICTURE TO 386-986-9966 OF ALL THE REPAIRS BEFORE YOU POUR. | |||
| ROW- PROJECT STATUS | 08/31/2020 | APPROVED | KHOWELL |
| ROW- PROJECT STATUS | 08/27/2020 | Disapproved - NO FEE | KHOWELL |
| Note: THIS IS A REINSPECTION EITHER PUT IN TEMPORAY CULVERT OR REMOVE DIRT THAT IS BLOCKING DRAINAGE IN SWALE AND PORT-O-LET NEEDS TO BE MOVED OF OF THE SWALE AREA, THIS WILL BE REINSPECTED ON 8-31-20 IF IT HAS NOT BE CORRECTED A REINSPECTION FEE WILL BE ADDED UNTIL THE ISSUE IS FIXED. ANY QUESTIONS GIVE ME A CALL 386-986-9966 KEVIN | |||
| ROW- PROJECT STATUS | 08/24/2020 | Disapproved - NO FEE | KHOWELL |
| Note: EITHER PUT IN TEMPORAY CULVERT OR REMOVE DIRT THAT IS BLOCKING DRAINAGE IN SWALE AND PORT-O-LET NEEDS TO BE MOVED OF OF THE SWALE AREA, THIS WILL BE REINSPECTED ON 8-27-20 IF IT HAS NOT BE CORRECTED A REINSPECTION FEE WILL BE ADDED UNTIL THE ISSUE IS FIXED. ANY QUESTIONS GIVE ME A CALL 386-986-9966 KEVIN | |||
| ELECTRIC - EARLY POWER | 07/27/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 8:50 | |||
| GRAVITY SEWER TEST | 07/10/2020 | APPROVED | FWILLIS |
| U - SEWER TIE IN | 07/10/2020 | APPROVED | FWILLIS |
| PEP TANK INSTALLATION REQUEST | 06/12/2020 | APPROVED | CSTONE |
| INSULATION | 05/05/2020 | APPROVED | FWILLIS |
| ALL ROUGH | 04/30/2020 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION need a revision submitted and approved for electrical riser diagram print calls for 200 AMP 1 panel a 300AMP 2 panel with a generator panel is installed also need nail plates on wire in front room run at bottom part of walls also need 5 foot head preshure test on drain lines | |||
| ALL ROUGH | 04/29/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: need a revision submitted and approved for electrical riser diagram print calls for 200 AMP 1 panel a 300AMP 2 panel with a generator panel is installed also need nail plates on wire in front room run at bottom part of walls also need 5 foot head preshure test on drain lines | |||
| LATH/BRICK/ WATER BARRIER | 04/23/2020 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 03/31/2020 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/25/2020 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION not ready just started sheathing the roof 3/24/20 - NOT FINISHED ON ROOF AND BRACINGS, TIES...... | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/23/2020 | Disapproved - NO FEE | FWILLIS |
| Note: THIS IS A REINSPECTION not ready just started sheathing the roof 3/24/20 - NOT FINISHED ON ROOF AND BRACINGS, TIES...... | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/18/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: not ready just started sheathing the roof | |||
| TIE BEAM / LINTEL | 02/26/2020 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 02/13/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/28/2020 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/21/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 12/20/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | COMPLETE | 11/06/2020 | 11/06/2020 |
| Note: Released By: JMONTARULI | |||
| BADMIN | HOLD | 11/05/2020 | 11/05/2020 |
| Note: Held By: JMONTARULI Notice of Commencement expired | |||
| ELEC | COMPLETE | 04/29/2020 | 04/29/2020 |
| Note: Released By: JMUNSON | |||
| ELEC | COMPLETE | 04/22/2020 | 04/23/2020 |
| Note: Released By: JMUNSON | |||
| ELEC | HOLD | 04/21/2020 | 04/21/2020 |
| Note: Held By: JMUNSON Riser diagram needs to match the 300 amp service. | |||
| ENGIN1 | COMPLETE | 02/12/2020 | 02/13/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 11/26/2019 | 11/27/2019 |
| Note: Released By: AMOBLEY | |||
| UD1 | COMPLETE | 11/26/2019 | 12/04/2019 |
| Note: Released By: AHALL | |||
| SW1 | COMPLETE | 11/26/2019 | 11/27/2019 |
| Note: Released By: CTROHA | |||
| ENGIN1 | COMPLETE | 11/26/2019 | 11/27/2019 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 11/22/2019 | 11/25/2019 |
| Note: Held By: AMOBLEY Survey/Site Plan footprint (rear) does not match the landscape plan nor the floor plan. | |||
| MECH | COMPLETE | 11/22/2019 | 11/25/2019 |
| Note: Released By: CPISCITELLI | |||
| ELEC | COMPLETE | 11/22/2019 | 11/25/2019 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 11/05/2019 | 11/14/2019 |
| Note: Released By: PBUCKLEY | |||
| CUSVC | COMPLETE | 11/05/2019 | 11/06/2019 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 11/05/2019 | 11/08/2019 |
| Note: Held By: JMUNSON Need to show Generator Specs and riser diagram. Need to show GFCI in Kitchen. NEC 2014 art 210.8 (A) Need to show outlet by A/C unit 210.63 | |||
| ENGIN1 | COMPLETE | 11/05/2019 | 11/05/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 11/05/2019 | 11/07/2019 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 11/05/2019 | 11/06/2019 |
| Note: Held By: CPISCITELLI Plans show R4.1 on block walls. Energy calcs say R5. Revise to match | |||
| PLUM | COMPLETE | 11/05/2019 | 11/14/2019 |
| Note: Released By: PBUCKLEY | |||
| SW1 | COMPLETE | 11/05/2019 | 11/06/2019 |
| Note: Released By: JMUNSON | |||
| UD1 | COMPLETE | 11/05/2019 | 11/12/2019 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 11/05/2019 | 11/06/2019 |
| Note: Held By: ELENS Site Plan footprint (rear) does not match the landscape plan nor the floor plan. Four shrubs are required in the rear facing the golf course. | |||
| SWALE | COMPLETE | 11/05/2019 | 12/11/2019 |
| Note: Released By: TBAKER |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 11/06/2020 |
| REINSPECTION FEE | ¤40.00 | 11/06/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤540.00 | 12/06/2019 |
| SITE PLAN 20 | ¤20.00 | 12/06/2019 |
| SURCHARGE FS 533.721 | ¤12.46 | 12/06/2019 |
| SURCHARGE - FS 468.631 | ¤18.69 | 12/06/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 12/06/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 12/06/2019 |
| SEWER CREDIT | (¤850.00) | 12/06/2019 |
| SEWER INSPECTION | ¤25.00 | 12/06/2019 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 12/06/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 12/06/2019 |
| METER - DEPOSIT | ¤60.00 | 12/06/2019 |
| WATER- TURN ON | ¤25.00 | 12/06/2019 |
| ADMIN FEE | ¤20.00 | 12/06/2019 |
| CONNECTION FEES | ¤1,002.88 | 12/06/2019 |
| ELECTRIC FEE | ¤222.00 | 12/06/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 12/06/2019 |
| IMPACT FEE FIRE | ¤223.38 | 12/06/2019 |
| IMPACT FEE PARKS | ¤849.24 | 12/06/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 12/06/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 12/06/2019 |
| MECHANICAL FEE | ¤222.00 | 12/06/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/06/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 12/06/2019 |
| PLAN CHECK FEE | ¤108.00 | 12/06/2019 |
| PLUMBING FEE | ¤222.00 | 12/06/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,026.76 |