I want to search for...

Permit #2019110387

Permit Details

Status: COED

Parcel Id: 07-11-31-7065-00580-0030
CONDITIONED SPACE: 1779 sqft
GARAGE: 451 sqft
OPENED PORCH (WITH ROOF) : 110 sqft
OPENED PORCH (WITH ROOF) : 40 sqft
Total Square Footage: 2380 sqft
Block: 00580
Subdivision: 2169 - SECTION 65-KANKAKEE RUN
Job Phone: 407-807-0656
Location Address: 2 KARL CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/07/2020
NOC: RECORDED
Applicant name: NAVIN SUGRIM
Owner: DLP BRITE HOMES LLC

Address

605 PALENCIA CLUB DRIVE

ST AUGUSTINE, FL 32095

Lot: 0030
Contracted Stated Job Value: ¤128,295.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

DLP BUILDERS LLC
Status Location Address State License Number Phone
CANCEL

7345 GREENBRIAR PKWY

ORLANDO, FL 32819

CBC1263567 (Exp: 08/31/2022) 407-807-0656

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853
THOMAS WALTER ALBANO
Status Location Address State License Number Phone Fax
INACTIVE

P. O. BOX 352075

Palm Coast, FL 32135

CFC045991 (Exp: 08/31/2024) 386-437-2795 (386)437-2781

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/29/2020 FINAL APPROVED FWILLIS
U -UTILITY RESIDENTIAL FINAL 04/29/2020 APPROVED AHALL
ROW - STORMWATER FINAL 04/28/2020 APPROVED MMAJEWSKI
ROW - FINAL APRON (AFTER POUR) 04/28/2020 APPROVED MMAJEWSKI
ROW FIELD SURVEY /GRADING CERTIFICATION 04/24/2020 APPROVED MMAJEWSKI
FINAL SURVEY (OFFICE USE ONLY) 04/20/2020 APPROVED MMAJEWSKI
ELECTRIC - EARLY POWER 04/17/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 10:30
GRAVITY SEWER TEST 04/13/2020 APPROVED JGIBSON
U - SEWER TIE IN 04/13/2020 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 04/08/2020 APPROVED - AS NOTED MMAJEWSKI
Note: THIS IS A REINSPECTION IT IS THE BUILDER’S RESPONSIBILITY: TO RECHECK ELEVATIONS AND PIPE SIZE, TO INSURE THAT AN OBSTRUCTION DOES NOT EXIST UPSTREAM AND OR DOWNSTREAM, THAT THE CULVERT PIPE IS SET TO AND OR FOLLOWS THE SWALE PLAN, FORM THE DRIVEWAY TO THE APPROVED SITE PLAN AND FOLLOW THE APPROVED DRIVEWAY DETAIL SHEET PROVIDED BY THE CITY OF PALM COAST. PRIOR TO PLACEMENT OF CONCRETE.
ROW- PRE-APRON (PRE-POUR) 04/07/2020 Disapproved - NO FEE MMAJEWSKI
Note: FORM BOARD ALONG THE EDGE OF PAVEMENT NEEDS TO BE RAISED ABOUT A HALF AN INCH ABOVE THE ROAD THERE NEEDS TO BE A MINIMUM OF 5 INCHES DEPTH ALONG THE EDGE OF PAVEMENT.
PEP TANK INSTALLATION REQUEST 03/23/2020 APPROVED CSTONE
INSULATION 03/19/2020 APPROVED FWILLIS
LATH/BRICK/ WATER BARRIER 03/18/2020 APPROVED FWILLIS
ALL ROUGH 03/16/2020 APPROVED FWILLIS
ELECTRIC-TUG 03/04/2020 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL 9:30 am
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/03/2020 APPROVED FWILLIS
Note: THIS IS A REINSPECTION
ROOF VALLEY & METAL 03/02/2020 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/26/2020 Disapproved - NO FEE FWILLIS
Note: Missed dowel front entry pier, left side. Drill and Epoxy and fill solid.
TIE BEAM / LINTEL 02/18/2020 APPROVED FWILLIS
MONOLITHIC SLAB 02/10/2020 APPROVED - AS NOTED FWILLIS
Note: Notice of Commencement must be posted as per Chapter 713 Section 135 Florida Statutes. Checking on next Inspection.
FOUND SURVEY APPROVED (OFFICE) 02/07/2020 APPROVED TBAKER
PLUMBING 1ST ROUGH UNDERGROUND 02/05/2020 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 02/04/2020 Disapproved -FEE REQUIRED JGIBSON
Note: NOT PER PLANRISER SHOWS C/O IN BATH ROOM , NEED REVISION TO CHANGE RISER AND PLUMBING CONTRACTOR
WATER METER INSTALLATION REQUEST 01/22/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 02/04/2020 02/07/2020
Note: Released By: TBAKER
BLD COMPLETE 12/16/2019 12/27/2019
Note: Released By: FREODICA
ZON COMPLETE 12/16/2019 12/17/2019
Note: Released By: AMOBLEY
SWALE COMPLETE 11/15/2019 12/13/2019
Note: Released By: TBAKER
BLD HOLD 11/12/2019 11/21/2019
Note: Held By: FREODICA Sheet A5.0: 1. Verify if the attic is vented or unvented as constuctions notes 1 and 9 are not clear. If unvented, provide manufacturer's specifications, method of application for icynene insulation to be used per FBCR 6th editon sec R806.5. 2. For clarity, provide only specific construction notes and details applicable to the project per FBCR 6th edition sec.107.2.1. Product Approval Sheet per FS 553.842: 1. Product approval FL 21465 for garage door shows sevearal models and at different design pressures. Provide specific number to match with the required design pressure. 2. Provide FL product approval for the miissing items such as soffit, lintel, anchors and connectors to bes used. FReodica-386-9864734
CUSVC COMPLETE 11/12/2019 11/12/2019
Note: Released By: HHAND
ELEC COMPLETE 11/12/2019 11/14/2019
Note: Released By: JMUNSON
ENGIN1 COMPLETE 11/12/2019 11/15/2019
Note: Released By: TBAKER
LOCATE COMPLETE 11/12/2019 11/15/2019
Note: Released By: CSTONE
MECH COMPLETE 11/12/2019 11/15/2019
Note: Released By: CPISCITELLI
PLUM COMPLETE 11/12/2019 11/25/2019
Note: Released By: PBUCKLEY
SW1 COMPLETE 11/12/2019 11/13/2019
Note: Released By: CTROHA
UD1 COMPLETE 11/12/2019 11/19/2019
Note: Released By: LFITZGERALD
ZON HOLD 11/12/2019 11/13/2019
Note: Held By: ELENS Need width of driveway on the Site Plan. 5 trees are required for this lot. Need one more. 8 foundation plantings (shrubs) are required in the front of the home.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 05/04/2020
CONTRACTOR CHANGE ¤40.00 05/04/2020
REINSPECTION FEE ¤40.00 05/04/2020
NEW RESIDENTIAL INSPECTIONS ¤444.00 01/07/2020
SITE PLAN 20 ¤20.00 01/07/2020
SURCHARGE FS 533.721 ¤10.64 01/07/2020
SURCHARGE - FS 468.631 ¤15.95 01/07/2020
STORM WATER PERMIT FEES ¤80.00 01/07/2020
3% TRANS IMPACT FEE CREDIT (¤48.96) 01/07/2020
SEWER CREDIT (¤3,087.14) 01/07/2020
SEWER INSPECTION ¤25.00 01/07/2020
SEWER CAPITAL FACILITY ¤4,596.07 01/07/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 01/07/2020
ELECTRIC FEE ¤193.20 01/07/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 01/07/2020
IMPACT FEE FIRE ¤223.38 01/07/2020
IMPACT FEE PARKS ¤849.24 01/07/2020
IMPACT FEE SCHOOL ¤3,600.00 01/07/2020
IMPACT FEE TRANSPORTATION ¤1,632.00 01/07/2020
MECHANICAL FEE ¤193.20 01/07/2020
WATER -IRRIGATION INSPECTION ¤25.00 01/07/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 01/07/2020
PLAN CHECK FEE ¤88.80 01/07/2020
PLUMBING FEE ¤193.20 01/07/2020
METER - DEPOSIT ¤60.00 01/07/2020
WATER- TURN ON ¤25.00 01/07/2020
ADMIN FEE ¤20.00 01/07/2020
CONNECTION FEES ¤1,002.88 01/07/2020
Fees Total Due: ¤0.00 Total Paid: ¤13,623.46