I want to search for...
Permit #2019110760
Permit Details
Status: COED
| Parcel Id: 07-11-31-7064-00200-0150 |
| CONDITIONED SPACE: 2331 sqft |
| GARAGE: 610 sqft |
| OPENED PORCH (WITH ROOF) : 176 sqft |
| OPENED PORCH (WITH ROOF) : 96 sqft |
| Total Square Footage: 3213 sqft |
| Block: 00200 |
| Subdivision: 2178 - SECTION 64-LAGUNA FOREST |
| Job Phone: (386) 672-8285 |
| Location Address: 12 LLOLEETA PATH |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/03/2019 |
| NOC: RECORDED |
| Applicant name: JOSEPH TODD VANACORE |
| Owner: MARTIN, ROBERT G & THYRA F |
|
Address TRUSTEES PALM COAST, FL 32164 |
|
Address 14 LLOLEETA PATH PALM COAST, FL 32164 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤240,000.00 |
| Job Description: Single family residence |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Sub Contractors
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
Inspection History
| Type | Request Date | Result | Inspector |
| PLUMBING FINAL | 07/20/2020 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 07/20/2020 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 07/20/2020 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 07/20/2020 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 07/14/2020 | APPROVED | AHALL |
| Note: THIS IS A REINSPECTION No power to pep panel, unable to gain access to service panel door locked. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/13/2020 | Disapproved - NO FEE | AHALL |
| Note: No power to pep panel, unable to gain access to service panel door locked. | |||
| ROW - FINAL APRON (AFTER POUR) | 07/10/2020 | FINAL APPROVED | KHOWELL |
| ROW - STORMWATER FINAL | 07/09/2020 | APPROVED | KHOWELL |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/08/2020 | APPROVED | KHOWELL |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/07/2020 | Disapproved - NO FEE | KHOWELL |
| Note: SOD ALONG FENCE ON LEFT SIDE PROPERTY LINE IS NOT ALLOWED TO BE ABOVE THE BOTTOM RAIL OF OF THE FENCE PER CITY TECHNICAL MANULA 300.04 A B (6) | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/07/2020 | APPROVED | KHOWELL |
| ROW - FINAL APRON (AFTER POUR) | 07/06/2020 | Disapproved - NO FEE | KHOWELL |
| Note: FINAL OFFICE SURVEY AND FIELD SURVEY ARE REQUIRED TO BE APPROVED BEFORE THIS INSPECTION AND ROW FINAL STORMWATER INSPECTION CAN BE SCHEDULED | |||
| ROW- PRE-APRON (PRE-POUR) | 06/03/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION IT IS THE BUILDER’S RESPONSIBILITY: TO RECHECK ELEVATIONS AND PIPE SIZE, TO INSURE THAT AN OBSTRUCTION DOES NOT EXIST UPSTREAM AND OR DOWNSTREAM, THAT THE CULVERT PIPE IS SET TO AND OR FOLLOWS THE SWALE PLAN, FORM THE DRIVEWAY TO THE APPROVED SITE PLAN AND FOLLOW THE APPROVED DRIVEWAY DETAIL SHEET PROVIDED BY THE CITY OF PALM COAST. PRIOR TO PLACEMENT OF CONCRETE. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/02/2020 | Disapproved -FEE REQUIRED | MMAJEWSKI |
| Note: PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE WASH OUTS NEED TO BE FIXED MATERIAL SHOULD ONLY BE HALF WAY UP THE PIPE | |||
| U - SEWER TIE IN | 05/14/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 05/14/2020 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 05/13/2020 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 04/29/2020 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 04/02/2020 | Approval - Private Provider | PPROVIDER |
| INSULATION | 03/13/2020 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 03/11/2020 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 02/26/2020 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/24/2020 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 01/30/2020 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 01/21/2020 | APPROVED | TBAKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/13/2020 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 01/13/2020 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 12/13/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 01/21/2020 | 01/21/2020 |
| Note: Released By: TBAKER | |||
| CUSVC | COMPLETE | 11/21/2019 | 11/22/2019 |
| Note: Released By: HHAND | |||
| ENGIN1 | COMPLETE | 11/21/2019 | 11/21/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 11/21/2019 | 12/02/2019 |
| Note: Released By: CSTONE | |||
| SW1 | COMPLETE | 11/21/2019 | 11/22/2019 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 11/21/2019 | 12/03/2019 |
| Note: Released By: AHALL | |||
| ZON | COMPLETE | 11/21/2019 | 11/25/2019 |
| Note: Released By: AMOBLEY | |||
| SWALE | COMPLETE | 11/21/2019 | 12/18/2019 |
| Note: Released By: TBAKER |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/24/2020 |
| SITE PLAN 20 | ¤20.00 | 12/03/2019 |
| SURCHARGE FS 533.721 | ¤2.00 | 12/03/2019 |
| SURCHARGE - FS 468.631 | ¤2.18 | 12/03/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 12/03/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 12/03/2019 |
| SEWER CREDIT | (¤2,331.17) | 12/03/2019 |
| SEWER INSPECTION | ¤25.00 | 12/03/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 12/03/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 12/03/2019 |
| METER - DEPOSIT | ¤60.00 | 12/03/2019 |
| WATER- TURN ON | ¤25.00 | 12/03/2019 |
| CONNECTION FEES | ¤985.25 | 12/03/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 12/03/2019 |
| IMPACT FEE FIRE | ¤223.38 | 12/03/2019 |
| IMPACT FEE PARKS | ¤849.24 | 12/03/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 12/03/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 12/03/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/03/2019 |
| PERMIT FEE | ¤125.00 | 12/03/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 12/03/2019 |
| PLAN CHECK FEE | ¤118.00 | 12/03/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,229.83 |