Permit #2019110899
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00340-0070 |
| CONDITIONED SPACE: 1474 sqft |
| GARAGE: 410 sqft |
| OPENED PORCH (WITH ROOF) : 40 sqft |
| OPENED PORCH (WITH ROOF) : 168 sqft |
| Total Square Footage: 2092 sqft |
| Block: 00340 |
| Subdivision: 2123 - SECTION 57-ULYSSES TREES |
| Job Phone: (386)437-1508 |
| Location Address: 92 UPSHIRE PATH |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/13/2020 |
| NOC: RECORDED |
| Applicant name: TAMMI SUE MARQUIS |
| Owner: JM PROPERTIES X LLC |
|
Address 29 COLUMBUS COURT PALM COAST, FL 32137 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤140,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GULFSTREAM HOMES & CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 1092 BUNNELL, FL 32110 |
CRC1326418 (Exp: 08/31/2026) | (386)437-1508 | 386-437-9769 |
Sub Contractors
JAMES CRAIG FISHER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 451 BUNNELL, FL 32110 |
CAC1819807 (Exp: 08/31/2026) | 386-222-9549 |
ARTHUR J PASCOE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 730007 ORMOND BEACH, FL 32174 |
EC13007168 (Exp: 08/31/2026) | 386-547-6439 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/24/2020 | FINAL APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Vent pipe needs to be sealed around penetration through ceiling. (Backside) | |||
| BLD - BUILDING FINAL | 06/23/2020 | Disapproved - NO FEE | FWILLIS |
| Note: Vent pipe needs to be sealed around penetration through ceiling. (Backside) | |||
| U -UTILITY RESIDENTIAL FINAL | 06/23/2020 | APPROVED | AHALL |
| ROW - FINAL APRON (AFTER POUR) | 06/22/2020 | APPROVED | KHOWELL |
| ROW - STORMWATER FINAL | 06/22/2020 | FINAL APPROVED | KHOWELL |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/08/2020 | APPROVED | MMAJEWSKI |
| FINAL SURVEY (OFFICE USE ONLY) | 06/08/2020 | APPROVED | MMAJEWSKI |
| ELECTRIC - EARLY POWER | 06/02/2020 | Disapproved - NO FEE | JMUNSON |
| Note: Main Breaker must be in the panel. NEC 2014 230.70 | |||
| ELECTRIC - EARLY POWER | 06/02/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION Main Breaker must be in the panel. NEC 2014 230.70 1. Above item was taken care of 2. Emailed FPL at 1:33 pm | |||
| GRAVITY SEWER TEST | 05/12/2020 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 05/12/2020 | APPROVED | JGIBSON |
| ROW - FINAL APRON (AFTER POUR) | 05/12/2020 | Disapproved - NO FEE | MMAJEWSKI |
| Note: WILL NEED A FINAL SURVEY BEFORE THIS CAN BE DONE | |||
| ROW- PRE-APRON (PRE-POUR) | 05/08/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: IT IS THE BUILDER’S RESPONSIBILITY: TO RECHECK ELEVATIONS AND PIPE SIZE, TO INSURE THAT AN OBSTRUCTION DOES NOT EXIST UPSTREAM AND OR DOWNSTREAM, THAT THE CULVERT PIPE IS SET TO AND OR FOLLOWS THE SWALE PLAN, FORM THE DRIVEWAY TO THE APPROVED SITE PLAN AND FOLLOW THE APPROVED DRIVEWAY DETAIL SHEET PROVIDED BY THE CITY OF PALM COAST. PRIOR TO PLACEMENT OF CONCRETE. | |||
| LATH/BRICK/ WATER BARRIER | 04/14/2020 | APPROVED | FWILLIS |
| INSULATION | 04/09/2020 | APPROVED - AS NOTED | FWILLIS |
| Note: Light fixture in Master bedroom closet not installed as requested. | |||
| ALL ROUGH | 04/06/2020 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 04/01/2020 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/27/2020 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 03/25/2020 | APPROVED | FWILLIS |
| Note: Inside cut out slab. Proof of Bug Spray in the Box. | |||
| TIE BEAM / LINTEL | 03/11/2020 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 03/05/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 02/28/2020 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 02/27/2020 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: Dowels missing throughout. Highlighted on approved drawings. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/21/2020 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED TO LIST CORRECT PLUMBING SUB CONTRACTOR | |||
| WATER METER INSTALLATION REQUEST | 01/24/2020 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION | |||
| WATER METER INSTALLATION REQUEST | 01/21/2020 | Disapproved - NO FEE | CSTONE |
| Note: No work order has been created, not sure if fee has been paid. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/16/2020 | 03/23/2020 |
| Note: Released By: FREODICA Revisioin 2 dated 3-16-20, sheets A-1 & A-2 - added 2 x 4 post to support support girder truss. | |||
| ENGIN1 | COMPLETE | 03/04/2020 | 03/05/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 01/07/2020 | 01/08/2020 |
| Note: Released By: AMOBLEY | |||
| UD1 | COMPLETE | 01/07/2020 | 01/09/2020 |
| Note: Released By: LFITZGERALD | |||
| ENGIN1 | COMPLETE | 01/07/2020 | 01/13/2020 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 01/07/2020 | 01/09/2020 |
| Note: Released By: CTROHA | |||
| ZON | HOLD | 01/06/2020 | 01/06/2020 |
| Note: Held By: AMOBLEY Please put all corrections of one site plan/survey Zoning will only stamp the correct one Please show on survey/site plan the following... Total lot square footage, driveway width, walkway width, AC Pad location and show the rear setback from proposed porch to property line | |||
| ZON | HOLD | 01/03/2020 | 01/03/2020 |
| Note: Held By: AMOBLEY Total lot square footage is incorrect on survey/site plan | |||
| ZON | HOLD | 12/20/2019 | 12/20/2019 |
| Note: Held By: ELENS Repeat comment: Need to provide lot area on the site plan. (Please provide total square footage of lot on site plan.) Please also provide width of proposed concrete walk on site plan. | |||
| BLD | COMPLETE | 12/20/2019 | 12/28/2019 |
| Note: Released By: JPI | |||
| PLUM | COMPLETE | 12/20/2019 | 12/28/2019 |
| Note: Released By: JPI 1. Approved as Noted. The lavatory on the top left branch had no pipe size. Nearest pipe size labeled is 2 inches. On future submittals, please label all pipe sizes. | |||
| PLUM | COMPLETE | 12/20/2019 | 12/28/2019 |
| Note: Released By: JPI | |||
| ZON | HOLD | 12/20/2019 | 12/20/2019 |
| Note: Held By: ELENS Repeat comment: Need to provide lot area on the site plan. (Please provide total square footage of the lot on the site plan.) Please also provide the width of the proposed concrete walk on the site plan. | |||
| SW1 | COMPLETE | 12/12/2019 | 12/13/2019 |
| Note: Released By: CTROHA According to the design standard 300.04 E (3-5) states The interior elevations at no greater than a 20 foot grid. There must be sufficient elevation shots to indicate the intended drainage pattern. The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. This must be clear on your final survey | |||
| ZON | HOLD | 12/12/2019 | 12/12/2019 |
| Note: Held By: ELENS REPEAT COMMENTS: Please provide driveway width on the site plan. Need to provide lot area on the site plan. The roof pitch needs to be at least 5:12. (Please show on the elevation sheet) | |||
| ENGIN1 | COMPLETE | 12/12/2019 | 12/19/2019 |
| Note: Released By: TBAKER | |||
| ELEC | COMPLETE | 12/12/2019 | 12/13/2019 |
| Note: Released By: JMUNSON | |||
| BLD | HOLD | 12/12/2019 | 12/16/2019 |
| Note: Held By: JPI 1. We reviewed the attachments dated 12/12/19. We do not see where the resubmittal addresses comments from the 12/08/19 review. Please address comments 1, 3, and 4. We will accept the prior submittal documentation in response to comment 2 | |||
| PLUM | HOLD | 12/12/2019 | 12/17/2019 |
| Note: Held By: JPI 1. We reviewed the attachments dated 12/12/19. We do not see where the resubmittal addresses comments from the 12/08/19 review. Please submit the plumbing riser diagram. We will acknowledge that the applicant intends that future submittals will not have text over text in the notes in response to comment 1. | |||
| SWALE | COMPLETE | 11/27/2019 | 01/14/2020 |
| Note: Released By: TBAKER | |||
| ENGIN1 | HOLD | 11/27/2019 | 11/27/2019 |
| Note: Held By: TBAKER No benchmark on survey | |||
| BLD | HOLD | 11/26/2019 | 12/08/2019 |
| Note: Held By: BBEMBRY 1. Please label the opening width at the toilet rooms/ bathrooms. Section R320.1.1 of the Florida Residential Building Code. Such toilet rooms shall have a clear opening of not less than 29 inches. 2. Please provide the positive and negative design wind pressures at each opening. As a suggestion, number the openings, list vertically in a table, and provide the positive and negative design pressures in the table for each opening based on the ultimate wind speed. Section 1603.1.4 of the FBC 3. Openings between the garage and residence shall be equipped with solid wood doors not less than 13/8 inches (35 mm) in thickness, solid or honeycomb-core steel doors not less than 13/8 inches (35 mm) thick, or 20-minute fire-rated doors. 4. DWELLING-GARAGE SEPARATION MATERIAL From the residence and attics. Not less than 1/2-inch gypsum board or equivalent applied to the garage side Structure(s) supporting floor/ceiling assemblies used for separation required by this section Not less than 1/2-inch gypsum board or equivalent. Please add this note or callout. | |||
| CUSVC | COMPLETE | 11/26/2019 | 12/02/2019 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 11/26/2019 | 12/03/2019 |
| Note: Held By: JMUNSON Need to submitt Load Calculations. NEC 2014 art 220 Kitchen and Laundry outlets need to be GFCI Protected. NEC 2014 art 210.8 (A) Need outlet on the outside of the front of the house. NEC 2014 art 210.52 (E) (1) | |||
| ENGIN1 | COMPLETE | 11/26/2019 | 11/27/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 11/26/2019 | 12/03/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 11/26/2019 | 12/02/2019 |
| Note: Released By: CPISCITELLI | |||
| PLUM | HOLD | 11/26/2019 | 12/07/2019 |
| Note: Held By: BBEMBRY 1. On Sheet A2 and other sheets, there is text overwriting text in the notes. Please correct in the resubmittal. 2. Please submit the plumbing riser diagram. If already uploaded, then please clarify the location of the diagram as we may have overlooked it within the electronic submittal. | |||
| SW1 | HOLD | 11/26/2019 | 11/26/2019 |
| Note: Held By: KHOWELL SEE NOTES ON PROPOSED SITE PLAN OF CORRECTS NEEDED | |||
| UD1 | COMPLETE | 11/26/2019 | 12/04/2019 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 11/26/2019 | 11/27/2019 |
| Note: Held By: ELENS Please provide driveway width on the site plan. Need to show the A/C pad on the site plan. Rear setback needs to be shown from the back patio. Need to provide lot area on the site plan. Need to indicate the size of the foundation plantings on the landscape plan. (A/C pad needs to be screened with 7 gallon shrubs.) Need to indicate type of sod on the landscape plan and whether it will be irrigated. The roof pitch needs to be at least 5:12. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 06/16/2020 |
| REINSPECTION FEE | ¤40.00 | 06/16/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤378.00 | 01/13/2020 |
| SITE PLAN 20 | ¤20.00 | 01/13/2020 |
| SURCHARGE FS 533.721 | ¤9.38 | 01/13/2020 |
| SURCHARGE - FS 468.631 | ¤14.07 | 01/13/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/13/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 01/13/2020 |
| SEWER CREDIT | (¤1,147.00) | 01/13/2020 |
| SEWER INSPECTION | ¤25.00 | 01/13/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 01/13/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 01/13/2020 |
| ELECTRIC FEE | ¤173.40 | 01/13/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 01/13/2020 |
| IMPACT FEE FIRE | ¤223.38 | 01/13/2020 |
| IMPACT FEE PARKS | ¤849.24 | 01/13/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/13/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 01/13/2020 |
| MECHANICAL FEE | ¤173.40 | 01/13/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/13/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/13/2020 |
| PLAN CHECK FEE | ¤75.60 | 01/13/2020 |
| PLUMBING FEE | ¤173.40 | 01/13/2020 |
| METER - DEPOSIT | ¤60.00 | 01/13/2020 |
| WATER- TURN ON | ¤25.00 | 01/13/2020 |
| ADMIN FEE | ¤20.00 | 01/13/2020 |
| CONNECTION FEES | ¤1,002.88 | 01/13/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,381.86 |