I want to search for...

Permit #2019110899

Permit Details

Status: COED

Parcel Id: 07-11-31-7057-00340-0070
CONDITIONED SPACE: 1474 sqft
GARAGE: 410 sqft
OPENED PORCH (WITH ROOF) : 40 sqft
OPENED PORCH (WITH ROOF) : 168 sqft
Total Square Footage: 2092 sqft
Block: 00340
Subdivision: 2123 - SECTION 57-ULYSSES TREES
Job Phone: (386)437-1508
Location Address: 92 UPSHIRE PATH
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/13/2020
NOC: RECORDED
Applicant name: TAMMI SUE MARQUIS
Owner: JM PROPERTIES X LLC

Address

29 COLUMBUS COURT

PALM COAST, FL 32137

Lot: 0070
Contracted Stated Job Value: ¤140,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GULFSTREAM HOMES & CONSTRUCTION, LLC
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 1092

BUNNELL, FL 32110

CRC1326418 (Exp: 08/31/2026) (386)437-1508 386-437-9769

Sub Contractors

JAMES CRAIG FISHER
Status Location Address State License Number Phone
ACTIVE

PO BOX 451

BUNNELL, FL 32110

CAC1819807 (Exp: 08/31/2026) 386-222-9549
ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/24/2020 FINAL APPROVED FWILLIS
Note: THIS IS A REINSPECTION Vent pipe needs to be sealed around penetration through ceiling. (Backside)
BLD - BUILDING FINAL 06/23/2020 Disapproved - NO FEE FWILLIS
Note: Vent pipe needs to be sealed around penetration through ceiling. (Backside)
U -UTILITY RESIDENTIAL FINAL 06/23/2020 APPROVED AHALL
ROW - FINAL APRON (AFTER POUR) 06/22/2020 APPROVED KHOWELL
ROW - STORMWATER FINAL 06/22/2020 FINAL APPROVED KHOWELL
ROW FIELD SURVEY /GRADING CERTIFICATION 06/08/2020 APPROVED MMAJEWSKI
FINAL SURVEY (OFFICE USE ONLY) 06/08/2020 APPROVED MMAJEWSKI
ELECTRIC - EARLY POWER 06/02/2020 Disapproved - NO FEE JMUNSON
Note: Main Breaker must be in the panel. NEC 2014 230.70
ELECTRIC - EARLY POWER 06/02/2020 APPROVED - AS NOTED JMUNSON
Note: THIS IS A REINSPECTION Main Breaker must be in the panel. NEC 2014 230.70 1. Above item was taken care of 2. Emailed FPL at 1:33 pm
GRAVITY SEWER TEST 05/12/2020 APPROVED JGIBSON
U - SEWER TIE IN 05/12/2020 APPROVED JGIBSON
ROW - FINAL APRON (AFTER POUR) 05/12/2020 Disapproved - NO FEE MMAJEWSKI
Note: WILL NEED A FINAL SURVEY BEFORE THIS CAN BE DONE
ROW- PRE-APRON (PRE-POUR) 05/08/2020 APPROVED - AS NOTED MMAJEWSKI
Note: IT IS THE BUILDER’S RESPONSIBILITY: TO RECHECK ELEVATIONS AND PIPE SIZE, TO INSURE THAT AN OBSTRUCTION DOES NOT EXIST UPSTREAM AND OR DOWNSTREAM, THAT THE CULVERT PIPE IS SET TO AND OR FOLLOWS THE SWALE PLAN, FORM THE DRIVEWAY TO THE APPROVED SITE PLAN AND FOLLOW THE APPROVED DRIVEWAY DETAIL SHEET PROVIDED BY THE CITY OF PALM COAST. PRIOR TO PLACEMENT OF CONCRETE.
LATH/BRICK/ WATER BARRIER 04/14/2020 APPROVED FWILLIS
INSULATION 04/09/2020 APPROVED - AS NOTED FWILLIS
Note: Light fixture in Master bedroom closet not installed as requested.
ALL ROUGH 04/06/2020 APPROVED FWILLIS
ROOF VALLEY & METAL 04/01/2020 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/27/2020 APPROVED FWILLIS
MONOLITHIC SLAB 03/25/2020 APPROVED FWILLIS
Note: Inside cut out slab. Proof of Bug Spray in the Box.
TIE BEAM / LINTEL 03/11/2020 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 03/05/2020 APPROVED TBAKER
MONOLITHIC SLAB 02/28/2020 APPROVED FWILLIS
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 02/27/2020 Disapproved -FEE REQUIRED FWILLIS
Note: Dowels missing throughout. Highlighted on approved drawings.
PLUMBING 1ST ROUGH UNDERGROUND 02/21/2020 APPROVED - AS NOTED JGIBSON
Note: NEED TO LIST CORRECT PLUMBING SUB CONTRACTOR
WATER METER INSTALLATION REQUEST 01/24/2020 APPROVED CSTONE
Note: THIS IS A REINSPECTION
WATER METER INSTALLATION REQUEST 01/21/2020 Disapproved - NO FEE CSTONE
Note: No work order has been created, not sure if fee has been paid.

Review History

Department Status Date In Date Out
BLD COMPLETE 03/16/2020 03/23/2020
Note: Released By: FREODICA Revisioin 2 dated 3-16-20, sheets A-1 & A-2 - added 2 x 4 post to support support girder truss.
ENGIN1 COMPLETE 03/04/2020 03/05/2020
Note: Released By: TBAKER
ZON COMPLETE 01/07/2020 01/08/2020
Note: Released By: AMOBLEY
UD1 COMPLETE 01/07/2020 01/09/2020
Note: Released By: LFITZGERALD
ENGIN1 COMPLETE 01/07/2020 01/13/2020
Note: Released By: TBAKER
SW1 COMPLETE 01/07/2020 01/09/2020
Note: Released By: CTROHA
ZON HOLD 01/06/2020 01/06/2020
Note: Held By: AMOBLEY Please put all corrections of one site plan/survey Zoning will only stamp the correct one Please show on survey/site plan the following... Total lot square footage, driveway width, walkway width, AC Pad location and show the rear setback from proposed porch to property line
ZON HOLD 01/03/2020 01/03/2020
Note: Held By: AMOBLEY Total lot square footage is incorrect on survey/site plan
ZON HOLD 12/20/2019 12/20/2019
Note: Held By: ELENS Repeat comment: Need to provide lot area on the site plan. (Please provide total square footage of lot on site plan.) Please also provide width of proposed concrete walk on site plan.
BLD COMPLETE 12/20/2019 12/28/2019
Note: Released By: JPI
PLUM COMPLETE 12/20/2019 12/28/2019
Note: Released By: JPI 1. Approved as Noted. The lavatory on the top left branch had no pipe size. Nearest pipe size labeled is 2 inches. On future submittals, please label all pipe sizes.
PLUM COMPLETE 12/20/2019 12/28/2019
Note: Released By: JPI
ZON HOLD 12/20/2019 12/20/2019
Note: Held By: ELENS Repeat comment: Need to provide lot area on the site plan. (Please provide total square footage of the lot on the site plan.) Please also provide the width of the proposed concrete walk on the site plan.
SW1 COMPLETE 12/12/2019 12/13/2019
Note: Released By: CTROHA According to the design standard 300.04 E (3-5) states The interior elevations at no greater than a 20 foot grid. There must be sufficient elevation shots to indicate the intended drainage pattern. The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. This must be clear on your final survey
ZON HOLD 12/12/2019 12/12/2019
Note: Held By: ELENS REPEAT COMMENTS: Please provide driveway width on the site plan. Need to provide lot area on the site plan. The roof pitch needs to be at least 5:12. (Please show on the elevation sheet)
ENGIN1 COMPLETE 12/12/2019 12/19/2019
Note: Released By: TBAKER
ELEC COMPLETE 12/12/2019 12/13/2019
Note: Released By: JMUNSON
BLD HOLD 12/12/2019 12/16/2019
Note: Held By: JPI 1. We reviewed the attachments dated 12/12/19. We do not see where the resubmittal addresses comments from the 12/08/19 review. Please address comments 1, 3, and 4. We will accept the prior submittal documentation in response to comment 2
PLUM HOLD 12/12/2019 12/17/2019
Note: Held By: JPI 1. We reviewed the attachments dated 12/12/19. We do not see where the resubmittal addresses comments from the 12/08/19 review. Please submit the plumbing riser diagram. We will acknowledge that the applicant intends that future submittals will not have text over text in the notes in response to comment 1.
SWALE COMPLETE 11/27/2019 01/14/2020
Note: Released By: TBAKER
ENGIN1 HOLD 11/27/2019 11/27/2019
Note: Held By: TBAKER No benchmark on survey
BLD HOLD 11/26/2019 12/08/2019
Note: Held By: BBEMBRY 1. Please label the opening width at the toilet rooms/ bathrooms. Section R320.1.1 of the Florida Residential Building Code. Such toilet rooms shall have a clear opening of not less than 29 inches. 2. Please provide the positive and negative design wind pressures at each opening. As a suggestion, number the openings, list vertically in a table, and provide the positive and negative design pressures in the table for each opening based on the ultimate wind speed. Section 1603.1.4 of the FBC 3. Openings between the garage and residence shall be equipped with solid wood doors not less than 13/8 inches (35 mm) in thickness, solid or honeycomb-core steel doors not less than 13/8 inches (35 mm) thick, or 20-minute fire-rated doors. 4. DWELLING-GARAGE SEPARATION MATERIAL From the residence and attics. Not less than 1/2-inch gypsum board or equivalent applied to the garage side Structure(s) supporting floor/ceiling assemblies used for separation required by this section Not less than 1/2-inch gypsum board or equivalent. Please add this note or callout.
CUSVC COMPLETE 11/26/2019 12/02/2019
Note: Released By: HHAND
ELEC HOLD 11/26/2019 12/03/2019
Note: Held By: JMUNSON Need to submitt Load Calculations. NEC 2014 art 220 Kitchen and Laundry outlets need to be GFCI Protected. NEC 2014 art 210.8 (A) Need outlet on the outside of the front of the house. NEC 2014 art 210.52 (E) (1)
ENGIN1 COMPLETE 11/26/2019 11/27/2019
Note: Released By: TBAKER
LOCATE COMPLETE 11/26/2019 12/03/2019
Note: Released By: CSTONE
MECH COMPLETE 11/26/2019 12/02/2019
Note: Released By: CPISCITELLI
PLUM HOLD 11/26/2019 12/07/2019
Note: Held By: BBEMBRY 1. On Sheet A2 and other sheets, there is text overwriting text in the notes. Please correct in the resubmittal. 2. Please submit the plumbing riser diagram. If already uploaded, then please clarify the location of the diagram as we may have overlooked it within the electronic submittal.
SW1 HOLD 11/26/2019 11/26/2019
Note: Held By: KHOWELL SEE NOTES ON PROPOSED SITE PLAN OF CORRECTS NEEDED
UD1 COMPLETE 11/26/2019 12/04/2019
Note: Released By: AHALL
ZON HOLD 11/26/2019 11/27/2019
Note: Held By: ELENS Please provide driveway width on the site plan. Need to show the A/C pad on the site plan. Rear setback needs to be shown from the back patio. Need to provide lot area on the site plan. Need to indicate the size of the foundation plantings on the landscape plan. (A/C pad needs to be screened with 7 gallon shrubs.) Need to indicate type of sod on the landscape plan and whether it will be irrigated. The roof pitch needs to be at least 5:12.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 06/16/2020
REINSPECTION FEE ¤40.00 06/16/2020
NEW RESIDENTIAL INSPECTIONS ¤378.00 01/13/2020
SITE PLAN 20 ¤20.00 01/13/2020
SURCHARGE FS 533.721 ¤9.38 01/13/2020
SURCHARGE - FS 468.631 ¤14.07 01/13/2020
STORM WATER PERMIT FEES ¤80.00 01/13/2020
3% TRANS IMPACT FEE CREDIT (¤48.96) 01/13/2020
SEWER CREDIT (¤1,147.00) 01/13/2020
SEWER INSPECTION ¤25.00 01/13/2020
SEWER CAPITAL FACILITY ¤4,596.07 01/13/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 01/13/2020
ELECTRIC FEE ¤173.40 01/13/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 01/13/2020
IMPACT FEE FIRE ¤223.38 01/13/2020
IMPACT FEE PARKS ¤849.24 01/13/2020
IMPACT FEE SCHOOL ¤3,600.00 01/13/2020
IMPACT FEE TRANSPORTATION ¤1,632.00 01/13/2020
MECHANICAL FEE ¤173.40 01/13/2020
WATER -IRRIGATION INSPECTION ¤25.00 01/13/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 01/13/2020
PLAN CHECK FEE ¤75.60 01/13/2020
PLUMBING FEE ¤173.40 01/13/2020
METER - DEPOSIT ¤60.00 01/13/2020
WATER- TURN ON ¤25.00 01/13/2020
ADMIN FEE ¤20.00 01/13/2020
CONNECTION FEES ¤1,002.88 01/13/2020
Fees Total Due: ¤0.00 Total Paid: ¤15,381.86