Permit #2019110945
Permit Details
Status: COED
| Parcel Id: 07-11-31-7016-00120-0190 |
| CONDITIONED SPACE: 1907 sqft |
| GARAGE: 551 sqft |
| OPENED PORCH (WITH ROOF) : 168 sqft |
| OPENED PORCH (WITH ROOF) : 45 sqft |
| Total Square Footage: 2671 sqft |
| Block: 00120 |
| Subdivision: 2201 - SECTION 16-COUNTRY CLUB COVE |
| Job Phone: (386) 672-8285 |
| Location Address: 8 CRISTON CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/23/2019 |
| NOC: RECORDED |
| Applicant name: JOSEPH TODD VANACORE |
| Owner: DEBUCK ALLAN |
|
Address 19890 30 MILE ROAD RAY, MI 48906 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤180,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Sub Contractors
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/13/2020 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 08/11/2020 | FINAL APPROVED | JHARDING |
| PLUMBING FINAL | 08/11/2020 | Approval - Private Provider | PPROVIDER |
| PLUMBING FINAL | 08/11/2020 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 08/11/2020 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 08/11/2020 | Approval - Private Provider | PPROVIDER |
| ROW - STORMWATER FINAL | 08/10/2020 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 08/10/2020 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/07/2020 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 08/07/2020 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 07/01/2020 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION MISSING DOCUMENTATION. NO SWALE PLAN ON SITE. 7/1/20 - READY TO POUR. NOTE THAT HEAVY RAIN IS IN THE FORECAST. BUILDER SHOULD DOUBLE CHCCK CULVERT ELEVATIONS JUST BEFORE POURING. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/30/2020 | Disapproved - NO FEE | RGROSS |
| Note: MISSING DOCUMENTATION. NO SWALE PLAN ON SITE. | |||
| ELECTRIC - EARLY POWER | 06/10/2020 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 06/09/2020 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 06/09/2020 | APPROVED | JGIBSON |
| ROW - DRAINAGE | 05/20/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION PORT-OLET NEEDS MOVED OUT OF THE SWALE. NOT MOVED OUT OF THE RIGHT OF WAY YET. NEXT INSECTION WILL BE ON 5/20/20 AND A FEE WILL BE ADDED IF PORT O POTTY NOT REMOVED FROM THE ROW. | |||
| ROW - DRAINAGE | 05/15/2020 | Disapproved - NO FEE | RGROSS |
| Note: PORT-OLET NEEDS MOVED OUT OF THE SWALE. NOT MOVED OUT OF THE RIGHT OF WAY YET. NEXT INSECTION WILL BE ON 5/20/20 AND A FEE WILL BE ADDED IF PORT O POTTY NOT REMOVED FROM THE ROW. | |||
| LATH/BRICK/ WATER BARRIER | 04/23/2020 | Approval - Private Provider | PPROVIDER |
| INSULATION | 04/23/2020 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 04/17/2020 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 04/06/2020 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/01/2020 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 03/16/2020 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 03/05/2020 | APPROVED | TBAKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/24/2020 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 02/24/2020 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 01/07/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/04/2020 | 03/05/2020 |
| Note: Released By: TBAKER | |||
| MECH | CANCEL | 12/20/2019 | 12/20/2019 |
| ZON | COMPLETE | 12/11/2019 | 12/11/2019 |
| Note: Released By: AMOBLEY | |||
| PLFM | COMPLETE | 12/11/2019 | 12/11/2019 |
| Note: Released By: JMYERS Based on the Site Plan submitted on 12/10/19 the structure will be outside of the SFHA, no elevation certificates will be required. | |||
| MECH | HOLD | 12/11/2019 | 12/11/2019 |
| Note: Held By: CPISCITELLI Second Request. Provide Duct layout by Licensed HVAC contractor | |||
| ELEC | COMPLETE | 12/11/2019 | 12/11/2019 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 12/11/2019 | 12/17/2019 |
| Note: Released By: JPI comments addressed | |||
| PLUM | COMPLETE | 12/11/2019 | 12/17/2019 |
| Note: Released By: JPI comments addressed | |||
| BLD | HOLD | 11/27/2019 | 12/08/2019 |
| Note: Held By: BBEMBRY 1. From the Master Bedroom to the Master Bath. Please label the opening width at the toilet rooms/ bathrooms. Section R320.1.1 of the Florida Residential Building Code. Such toilet rooms shall have a clear opening of not less than 29 inches. 2. Please provide product approvals for the sun tunnel. 3. The City observes a 140 mph wind load for this category and use. Please see the design statement on the floor plan. | |||
| CUSVC | COMPLETE | 11/27/2019 | 11/27/2019 |
| Note: Released By: AROSCOE | |||
| ELEC | HOLD | 11/27/2019 | 12/04/2019 |
| Note: Held By: JMUNSON Need Light and Switch for the outside garage door. NEC 2014 art 210.70 (A) (2) | |||
| ENGIN1 | COMPLETE | 11/27/2019 | 11/27/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 11/27/2019 | 12/03/2019 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 11/27/2019 | 12/03/2019 |
| Note: Held By: CPISCITELLI Provide Duct layout by Licensed HVAC contractor | |||
| PLUM | HOLD | 11/27/2019 | 12/08/2019 |
| Note: Held By: BBEMBRY 1. Please add the label for a Vacuum Breaker on the hose bib. See General Note 4. Also, the floor plan appears do already locate the hose bibs. 2. For the water closet and shower (in addition the tub) on downstream branch of the plumbing riser diagram, please provide the trap arm length from trap weir to vent (wet) P3108.5 | |||
| SW1 | COMPLETE | 11/27/2019 | 12/02/2019 |
| Note: Released By: RGROSS | |||
| UD1 | COMPLETE | 11/27/2019 | 12/04/2019 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 11/27/2019 | 11/27/2019 |
| Note: Held By: ELENS FEMA FIRM Map number needs to be fixed on site plan. (....0126E - not ".....D") | |||
| SWALE | COMPLETE | 11/27/2019 | 01/07/2020 |
| Note: Released By: TBAKER | |||
| PLFM | HOLD | 11/27/2019 | 12/02/2019 |
| Note: Held By: JMYERS The flood zone on the survey is incorrect, the lot has both X-shaded and AE zones. The Panel number is also incorrect, it needs to be followed by an E for the 6/6/18 maps. Please provide an updated Site Plan that shows the extent of the AE zone on the property. If the structure or any accessory machinery falls within the AE zone elevation certificates will be required at 3 stages. Construction Drawings, Foundation, and Final. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 12/23/2019 |
| WATER- TURN ON | ¤25.00 | 12/23/2019 |
| CONNECTION FEES | ¤985.25 | 12/23/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 12/23/2019 |
| IMPACT FEE FIRE | ¤223.38 | 12/23/2019 |
| IMPACT FEE PARKS | ¤849.24 | 12/23/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 12/23/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 12/23/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/23/2019 |
| PERMIT FEE | ¤125.00 | 12/23/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 12/23/2019 |
| SITE PLAN 20 | ¤20.00 | 12/23/2019 |
| SURCHARGE FS 533.721 | ¤2.00 | 12/23/2019 |
| SURCHARGE - FS 468.631 | ¤2.18 | 12/23/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 12/23/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 12/23/2019 |
| SEWER CREDIT | (¤1,342.00) | 12/23/2019 |
| SEWER INSPECTION | ¤25.00 | 12/23/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 12/23/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 12/23/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,061.00 |