I want to search for...
Permit #2019120249
Permit Details
Status: COED
| Parcel Id: 29-10-31-5540-00000-1000 |
| CONDITIONED SPACE: 4083 sqft |
| GARAGE: 809 sqft |
| OPENED PORCH (WITH ROOF) : 790 sqft |
| OPENED PORCH (WITH ROOF) : 136 sqft |
| Total Square Footage: 5818 sqft |
| Block: 00000 |
| Subdivision: 1005 - SANCTUARY SUBDIVISION |
| Job Phone: 386-263-8272 |
| Location Address: 4 OLD OAK DR N |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/05/2020 |
| NOC: RECORDED |
| Applicant name: ROY CHARLES WALDHAUER |
| Owner: KALUHIOKALANI KARL A & KATHLEEN B H&W |
|
Address 1637 OAKLEAF LANE PITTSBURGH, PA 15237 |
| Lot: 1000 |
| Contracted Stated Job Value: ¤450,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
BY THE SHORE INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1600 N STATE STREET # 102 , |
CRC1327300 (Exp: 08/31/2026) | 386-263-8272 | 386-263-8289 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/09/2021 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION need switched lights in all bedroomsNEC 210.70 need to patch holes in bathrom walls (back right bath) 03-09-21 notes above resolved | |||
| BLD - BUILDING FINAL | 03/08/2021 | Disapproved -FEE REQUIRED | WMILLER |
| Note: THIS IS A REINSPECTION need switched lights in all bedroomsNEC 210.70 need to patch holes in bathrom walls (back right bath) | |||
| BLD - BUILDING FINAL | 03/05/2021 | CANCELLED BY APPLICANT | WMILLER |
| U -UTILITY RESIDENTIAL FINAL | 03/01/2021 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 02/26/2021 | APPROVED | KRUTH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/25/2021 | APPROVED | KRUTH |
| ROW - FINAL APRON (AFTER POUR) | 02/25/2021 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 02/25/2021 | APPROVED | KRUTH |
| ROW- PRE-APRON (PRE-POUR) | 02/09/2021 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION APPROVED FOR THE APRON POUR ONLY. RESTRAINTS UPPER PART OF PAVER DRIVEWAY NOT READY. Base thickness was observed during the paver restraint inspection. New builder forgot to call in the 2nd part of the pre pour. Apron was poured with concrete under pavers. | |||
| ROW- PAVER RESTRAINTS | 02/09/2021 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 02/09/2021 | Disapproved - NO FEE | RGROSS |
| Note: Accidently called in by new super. No fee. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/19/2021 | PARTIALLY APPROVED | RGROSS |
| Note: APPROVED FOR THE APRON POUR ONLY. RESTRAINTS UPPER PART OF PAVER DRIVEWAY NOT READY. | |||
| ELECTRIC - EARLY POWER | 12/18/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 2:50 | |||
| GRAVITY SEWER TEST | 12/08/2020 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 12/08/2020 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 10/27/2020 | APPROVED | TSTAUFFACHER |
| INSULATION | 10/21/2020 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION need to repair destroyed Bath exhaust duct Bath on right side of house | |||
| INSULATION | 10/19/2020 | Disapproved - NO FEE | WMILLER |
| Note: need to repair destroyed Bath exhaust duct Bath on right side of house | |||
| ALL ROUGH | 10/13/2020 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: This inspection was performed 10/12/2020 during lath inspection By TS. Add screw shims to arch windows at dining room to avoid oversize gaps. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/12/2020 | APPROVED | TSTAUFFACHER |
| Note: This home has passed tie downs and all rough. System issues kept contractor from calling in all rough at the same. TS agreed to perform all rough and tie downs. All rough can be passed. Contractor was asked to call it in for the 14th and it will be signed. THIS IS A REINSPECTION only wanted roof inspection, ok to tape Zip system, call for braces and ties when ready | |||
| ROOF VALLEY & METAL | 09/11/2020 | APPROVED | TSTAUFFACHER |
| ELEV CERT-FOUNDATION APPROVAL | 09/09/2020 | APPROVED | JMYERS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/14/2020 | PARTIALLY APPROVED | JCOLASANTI |
| Note: only wanted roof inspection, ok to tape Zip system, call for braces and ties when ready | |||
| TIE BEAM / LINTEL | 07/27/2020 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 07/24/2020 | APPROVED | TBAKER |
| ELECTRIC TEMP POLE | 07/15/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 12:17 pm | |||
| ELECTRIC - EARLY POWER | 07/15/2020 | CANCELLED BY APPLICANT | JMUNSON |
| MONOLITHIC SLAB | 06/29/2020 | APPROVED | MMESSER |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/15/2020 | APPROVED | JGIBSON |
| STEM WALL FOUNDATION | 05/04/2020 | APPROVED | JDELBONIS |
| FOOTER | 04/13/2020 | APPROVED | JDELBONIS |
| STEM WALL FOUNDATION | 04/13/2020 | CANCELLED BY APPLICANT | WEB |
| WATER METER INSTALLATION REQUEST | 03/26/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 02/25/2021 | 02/26/2021 |
| Note: Released By: JMYERS The Final elevation certificate has been accepted. | |||
| PLFM | HOLD | 02/24/2021 | 02/24/2021 |
| Note: Held By: JMYERS The Final elevation certificate submitted is on the old form. A new form was released by FEMA and must be used. The machinery in C2e was the A/C on the Foundation elevation certificate but on the Final it is the pool equipment. Please provide the elevation of the A/C so staff can confirm it meets the elevation requirements. | |||
| PLFM | HOLD | 09/08/2020 | 09/08/2020 |
| Note: Held By: JMYERS The Building elevation certificate submitted is on the old form. A new form was released from FEMA and must be used. | |||
| PLFM | COMPLETE | 09/08/2020 | 09/09/2020 |
| Note: Released By: JMYERS The Building elevation certificate has been approved. Please provide Final prior to receiving CO. | |||
| BLD | COMPLETE | 08/10/2020 | 08/14/2020 |
| Note: Released By: FREODICA Revision: Truss repair | |||
| ZON | COMPLETE | 07/23/2020 | 07/23/2020 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 07/23/2020 | 07/24/2020 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 04/10/2020 | 04/20/2020 |
| Note: Released By: PBUCKLEY | |||
| ZON | COMPLETE | 01/24/2020 | 01/27/2020 |
| Note: Released By: ELENS | |||
| PLFM | COMPLETE | 01/24/2020 | 01/27/2020 |
| Note: Released By: JMYERS The Construction elevation certificate has been approved. Please provide Building and Final prior to receiving CO. | |||
| ELEC | COMPLETE | 01/24/2020 | 01/24/2020 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 01/24/2020 | 01/26/2020 |
| Note: Released By: JPI | |||
| PLUM | COMPLETE | 01/24/2020 | 01/26/2020 |
| Note: Released By: JPI | |||
| BLD | HOLD | 12/09/2019 | 12/16/2019 |
| Note: Held By: JPI 1. THE ASCE 7 HAZARD TOOL recommends a design wind load of 133 MPH. for this address. Please update the plans. (R301.2.1). 2. On the Icemaker, add a label to install the water hammer arrestor . fbc plumbing 604.9 3. Garage door entrance. R302.5.1 Other openings between the garage and residence shall be equipped with solid wood doors not less than 13/8 inches (35 mm) in thickness, solid or honeycomb core steel doors not less than 13/8 inches (35 mm) thick, or 20-minute fire-rated doors. The door must conform to manufacturer’s requirements including the opening angle. Please label the entrance type. 4. Please label the opening width at the toilet rooms/ bathrooms. Section R320.1.1 of the Florida Residential Building Code. Such toilet rooms shall have a clear opening of not less than 29 inches. Label the dimension at the Bedroom 2 and Bedroom 3 bath. 5. The plans must designate the Occupancy and Type. Also, the plans must specify conformance to the FBC 2017, NEC 2014, and NFPA at a minimum. We apologize but we did not see it likely due to the size of text within the electronic delivery and challenges with zooming. Would you mind placing this information on the cover sheet. 6. Please provide the geotechnical report. 7. Please clarify the insulation type. The project files contain submittals for spray foam insulation and the plans detail information pertaining to vented soffits. 8. Please add the label for a Vacuum Breaker on the hose bib. | |||
| CUSVC | COMPLETE | 12/09/2019 | 12/10/2019 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 12/09/2019 | 12/11/2019 |
| Note: Held By: JMUNSON Need light switch and light for the garage door going outside, the Pool bath, and sitting room slider doors. NEC 2014 210.70 (A) (2) (a) Need outlet by the A/c units. NEC 2014 210.63 | |||
| ENGIN1 | COMPLETE | 12/09/2019 | 12/16/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 12/09/2019 | 12/12/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 12/09/2019 | 12/09/2019 |
| Note: Released By: CPISCITELLI | |||
| PLUM | HOLD | 12/09/2019 | 12/16/2019 |
| Note: Held By: JPI 2019120249 Plumbing Review (30 minutes) 1. Please provide the plumbing riser diagram. If submitted, then please direct us to the location. We apologize as we did not see it within the file directory. | |||
| SW1 | COMPLETE | 12/09/2019 | 12/09/2019 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 12/09/2019 | 12/13/2019 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 12/09/2019 | 12/09/2019 |
| Note: Held By: AMOBLEY AC must be screened with 7 gallon shrubs Landscape plan shows privacy wall. Site plan does not show a wall If installing a wall please correct site plan/survey to show wall and specify type and color of wall | |||
| PLFM | HOLD | 12/09/2019 | 12/09/2019 |
| Note: Held By: JMYERS Based on the Site Plan submitted 12/6/19 the structure will be inside the Special Flood Hazard Area. Please provide elevation certificates at 3 stages: Construction Drawings, Foundation, and Final. Elevation certificates must be turned in as hard copies. | |||
| URB | COMPLETE | 12/09/2019 | 12/10/2019 |
| Note: Released By: JBEAUDET |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 03/08/2021 |
| REINSPECTION FEE | ¤40.00 | 03/08/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 06/17/2020 |
| ELECTRIC FEE | ¤374.40 | 03/05/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 03/05/2020 |
| IMPACT FEE FIRE | ¤223.38 | 03/05/2020 |
| IMPACT FEE PARKS | ¤849.24 | 03/05/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/05/2020 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 03/05/2020 |
| MECHANICAL FEE | ¤374.40 | 03/05/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 03/05/2020 |
| PLAN CHECK FEE | ¤209.60 | 03/05/2020 |
| PLUMBING FEE | ¤374.40 | 03/05/2020 |
| SITE PLAN 20 | ¤20.00 | 03/05/2020 |
| SURCHARGE FS 533.721 | ¤22.11 | 03/05/2020 |
| SURCHARGE - FS 468.631 | ¤33.17 | 03/05/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/05/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 03/05/2020 |
| SEWER INSPECTION | ¤25.00 | 03/05/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 03/05/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 03/05/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤1,048.00 | 03/05/2020 |
| METER - DEPOSIT | ¤60.00 | 03/05/2020 |
| WATER-METER | ¤434.59 | 03/05/2020 |
| ADMIN FEE | ¤20.00 | 03/05/2020 |
| CONNECTION FEES | ¤25.00 | 03/05/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,722.93 |