I want to search for...
Permit #2019120569
Permit Details
Status: COED
| Parcel Id: 07-11-31-7004-00250-0310 |
| CONDITIONED SPACE: 2305 sqft |
| GARAGE: 477 sqft |
| OPENED PORCH (WITH ROOF) : 80 sqft |
| OPENED PORCH (WITH ROOF) : 489 sqft |
| Total Square Footage: 3351 sqft |
| Block: 00250 |
| Subdivision: 2203 - SECTION 4-COUNTRY CLUB COVE |
| Job Phone: 386-447-4400 |
| Location Address: 14 COLD SPRING CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/28/2020 |
| NOC: RECORDED |
| Applicant name: DAVID PAUL CROCKETT |
| Owner: GONZALEZ, EDWARD J & DEBRA M |
|
Address 1860 SPRING POND POINT #128 WINTER SPRINGS, FL 32708 |
| Lot: 0310 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SALTWATER HOMES INC
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| DECEASED |
138 PALM COAST PARKWAY PALM COAST, FL 32137 |
SUITE 328 PALM COAST, FL 32137 |
RG0041345 (Exp: 08/31/2025) | 386-447-4400 | 866-244-9639 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
DENNIS GENE GAINEY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 1203 Bunnell, FL 32110 |
CFC046004 (Exp: 08/31/2026) | (386) 437-5637 | 386-437-3012 |
CHRISTOPHER DANIEL FULTON
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CCC1331939 (Exp: 08/31/2026) | 386-445-7945 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/07/2021 | FINAL APPROVED | WMILLER |
| U -UTILITY RESIDENTIAL FINAL | 01/07/2021 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 01/06/2021 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION MAJOR SEDIMENT WASHOUT ON THE ADJACENT VACANT. PER SUPER SOME WAS REMOVED BUT NEAR ENOUGH. PHOTO'S BEING ATTACHED. WASHOUT NEEDS REMOVED TO REFLECT THE REST OF THE BANK ON THE SAME VACANT. INSPECTED EARLIER. PER SUPER. SOD IS EN ROUTE AND WILL BE PLACED ON THE BANK THIS A.M. | |||
| ROW - STORMWATER FINAL | 01/04/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: MAJOR SEDIMENT WASHOUT ON THE ADJACENT VACANT. PER SUPER SOME WAS REMOVED BUT NEAR ENOUGH. PHOTO'S BEING ATTACHED. WASHOUT NEEDS REMOVED TO REFLECT THE REST OF THE BANK ON THE SAME VACANT. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/04/2021 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/29/2020 | APPROVED - AS NOTED | RGROSS |
| Note: BEFORE THE FINAL STORMWATER CAN BE APPROVED, THE BUILDER TO REMOVE SEVERAL YARDS OF SEDIMENT WASHOUT ON THE RIGHT SIDE OF THE REAR PROPERTY ON THE VACANT NEAR THE SEAWALL RETURN. ON SITE WITH SUPER TO REMOVE SOD FROM BANK, REMOVE SEDIMENT FROM CANAL AND RE-ESTABLISH THE ORIGINAL VANCANT LOT BANK WITH WASHED OUT SEDIMENT AND THEN REPLACE THE SOD. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 12/29/2020 | APPROVED | RGROSS |
| ROW- PAVER RESTRAINTS | 12/23/2020 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION NOT READY FOR INSPECTION. 12/23/2020=IT WAS DONE | |||
| ROW- PRE-APRON (PRE-POUR) | 12/23/2020 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION APPROVED FOR THE CONCRETE APRON AND PAVER RESTRAINTS ONLY. PAVER DRIVEWAY 11/13/20 - STILL REMOVING CONCRETE OVER PIPE THAT COULD STILL BE DAMAGED. DEPTH OF OF ROAD BASE IN APRON NOT DEEP ENOUGH. 12/23/2020=CORRECTION MADE | |||
| ROW- PAVER RESTRAINTS | 11/13/2020 | CANCELLED BY APPLICANT | RGROSS |
| Note: NOT READY FOR INSPECTION. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/13/2020 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION APPROVED FOR THE CONCRETE APRON AND PAVER RESTRAINTS ONLY. PAVER DRIVEWAY 11/13/20 - STILL REMOVING CONCRETE OVER PIPE THAT COULD STILL BE DAMAGED. DEPTH OF OF ROAD BASE IN APRON NOT DEEP ENOUGH. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/12/2020 | CANCELLED BY APPLICANT | RGROSS |
| Note: THIS IS A REINSPECTION APPROVED FOR THE CONCRETE APRON AND PAVER RESTRAINTS ONLY. PAVER DRIVEWAY | |||
| ROW- PRE-APRON (PRE-POUR) | 08/26/2020 | PARTIALLY APPROVED | RGROSS |
| Note: APPROVED FOR THE CONCRETE APRON AND PAVER RESTRAINTS ONLY. PAVER DRIVEWAY | |||
| ELECTRIC - EARLY POWER | 08/25/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 11:40 | |||
| LATH/BRICK/ WATER BARRIER | 07/07/2020 | APPROVED | MMESSER |
| INSULATION | 06/30/2020 | APPROVED | FWILLIS |
| ALL ROUGH | 06/25/2020 | APPROVED | MMESSER |
| ROOF VALLEY & METAL | 05/28/2020 | APPROVED | JDELBONIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/27/2020 | APPROVED - AS NOTED | JDELBONIS |
| Note: need to nail tie downs from garage to house trusses where one is over the other | |||
| TIE BEAM / LINTEL | 04/30/2020 | APPROVED | JDELBONIS |
| ELEV CERT-FOUNDATION APPROVAL | 04/29/2020 | APPROVED | JMYERS |
| FOUND SURVEY APPROVED (OFFICE) | 04/29/2020 | APPROVED | AMOBLEY |
| ELECTRIC TEMP POLE | 04/16/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 10:32 am | |||
| MONOLITHIC SLAB | 04/07/2020 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION 1816.1.7 FBC Termite Protection intention of or completion prior to slab. | |||
| MONOLITHIC SLAB | 04/06/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: 1816.1.7 FBC Termite Protection intention of or completion prior to slab. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/30/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 03/30/2020 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 03/30/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 02/18/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 12/18/2020 | 12/18/2020 |
| Note: Released By: JMYERS The Final elevation certificate has been approved. | |||
| ZON | COMPLETE | 11/17/2020 | 11/17/2020 |
| Note: Released By: AMOBLEY | |||
| ZON | HOLD | 10/26/2020 | 10/26/2020 |
| Note: Held By: AMOBLEY Please turn in the original right of way agreement to us so we can send it to recording | |||
| ZON | COMPLETE | 08/17/2020 | 08/17/2020 |
| Note: Released By: AMOBLEY | |||
| ZON | COMPLETE | 04/29/2020 | 04/29/2020 |
| Note: Released By: AMOBLEY | |||
| PLFM | COMPLETE | 04/29/2020 | 04/29/2020 |
| Note: Released By: JMYERS The building elevation certificate has been approved. Please provide Final prior to receiving CO. | |||
| PLFM | HOLD | 04/23/2020 | 04/23/2020 |
| Note: Held By: JMYERS On the Foundation survey it shows an A/C pad with an elevation of 8.9'. However, on the elevation certificate there is no elevation for accessory machinery. Please add the A/C elevation under C2. e. | |||
| ENGIN1 | COMPLETE | 04/23/2020 | 04/23/2020 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 04/23/2020 | 04/23/2020 |
| Note: Held By: ELENS Foundation survey shows house moved towards the street. Please submit a revised site plan for review/approval. | |||
| SW1 | COMPLETE | 03/06/2020 | 03/06/2020 |
| Note: Released By: CTROHA | |||
| ZON | COMPLETE | 03/06/2020 | 03/06/2020 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 01/31/2020 | 01/31/2020 |
| Note: Released By: BBEMBRY Permit issued, revision sent to JPI in error. | |||
| BLD | HOLD | 01/30/2020 | 01/30/2020 |
| Note: Held By: JPI Review forwarded to Palm Coast from consultant. Floor Plan does not depict a garage door entrance that meets R302.5.1 per prior comments. | |||
| ZON | COMPLETE | 01/22/2020 | 01/23/2020 |
| Note: Released By: AMOBLEY | |||
| ELEC | COMPLETE | 01/08/2020 | 01/09/2020 |
| Note: Released By: JMUNSON | |||
| ZON | HOLD | 01/08/2020 | 01/09/2020 |
| Note: Held By: AMOBLEY No new landscape plan submitted... Must have a total of four shrubs along each side of home. This lot backs to canal so four additional foundation plantings required along the rear | |||
| BLD | HOLD | 01/08/2020 | 01/08/2020 |
| Note: Held By: PBUCKLEY 1. On the product approval listing, please provide the product approval information for the lintels, soffits, and structural components. 2. Garage door entrance. R302.5.1 Other openings between the garage and residence shall be equipped with solid wood doors not less than 13/8 inches (35 mm) in thickness, solid or honeycomb core steel doors not less than 13/8 inches (35 mm) thick, or 20-minute fire-rated doors. Please label the door option. | |||
| BLD | HOLD | 01/08/2020 | 01/08/2020 |
| Note: Held By: PBUCKLEY 1. On the product approval listing, please provide the product approval information for the lintels, soffits, and structural components. Garage / house door identified on Plan sheet No. 7. No revision or response required. Ok. | |||
| BLD | COMPLETE | 01/08/2020 | 01/17/2020 |
| Note: Released By: PBUCKLEY | |||
| UD1 | COMPLETE | 01/08/2020 | 01/13/2020 |
| Note: Released By: AHALL | |||
| SW1 | COMPLETE | 01/08/2020 | 01/09/2020 |
| Note: Released By: CTROHA | |||
| SWALE | COMPLETE | 01/02/2020 | 01/15/2020 |
| Note: Released By: TBAKER | |||
| PLFM | COMPLETE | 12/18/2019 | 12/18/2019 |
| Note: Released By: JMYERS The construction Elevation Certificate has been approved. Please provide Building and Final prior to receiving CO. | |||
| BLD | HOLD | 12/17/2019 | 12/22/2019 |
| Note: Held By: JPI 1. On the product approval listing, please provide the product approval information for the lintels, soffits, and structural components. 2. Please add the label for a Vacuum Breaker on the hose bib. (R2902.4) 3. Garage door entrance. R302.5.1 Other openings between the garage and residence shall be equipped with solid wood doors not less than 13/8 inches (35 mm) in thickness, solid or honeycomb core steel doors not less than 13/8 inches (35 mm) thick, or 20-minute fire-rated doors. Please label the door option. 4. Provide safety device at water heater (tap and thermal expansion device). Add note. P607.3. | |||
| CUSVC | COMPLETE | 12/17/2019 | 12/19/2019 |
| Note: Released By: AROSCOE | |||
| ELEC | HOLD | 12/17/2019 | 12/18/2019 |
| Note: Held By: JMUNSON Load Calculations dont match the address on the permit. | |||
| ENGIN1 | COMPLETE | 12/17/2019 | 01/02/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 12/17/2019 | 12/18/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 12/17/2019 | 12/17/2019 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 12/17/2019 | 12/22/2019 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 12/17/2019 | 12/18/2019 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 12/17/2019 | 12/19/2019 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 12/17/2019 | 12/18/2019 |
| Note: Held By: AMOBLEY Please provide a right of way utilization agreement signed by all owners on the deed and notarized for paver driveway Must have a total of four shrubs along each side of home. This lot backs to canal so four additional foundation plantings required along the rear |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 01/07/2021 |
| REINSPECTION FEE | ¤40.00 | 01/07/2021 |
| REINSPECTION FEE | ¤40.00 | 01/07/2021 |
| REINSPECTION FEE | ¤40.00 | 01/07/2021 |
| RECORDING FEE REIMBURSE DOC | ¤52.50 | 01/07/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 01/28/2020 |
| MECHANICAL FEE | ¤270.00 | 01/28/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/28/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/28/2020 |
| PLAN CHECK FEE | ¤140.00 | 01/28/2020 |
| PLUMBING FEE | ¤270.00 | 01/28/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤700.00 | 01/28/2020 |
| SITE PLAN 20 | ¤20.00 | 01/28/2020 |
| SURCHARGE FS 533.721 | ¤15.50 | 01/28/2020 |
| SURCHARGE - FS 468.631 | ¤23.25 | 01/28/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/28/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 01/28/2020 |
| SEWER CREDIT | (¤213.09) | 01/28/2020 |
| SEWER INSPECTION | ¤25.00 | 01/28/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 01/28/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 01/28/2020 |
| ELECTRIC FEE | ¤270.00 | 01/28/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 01/28/2020 |
| IMPACT FEE FIRE | ¤223.38 | 01/28/2020 |
| IMPACT FEE PARKS | ¤849.24 | 01/28/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/28/2020 |
| METER - DEPOSIT | ¤60.00 | 01/28/2020 |
| WATER- TURN ON | ¤25.00 | 01/28/2020 |
| ADMIN FEE | ¤20.00 | 01/28/2020 |
| CONNECTION FEES | ¤1,002.88 | 01/28/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,139.77 |