Permit #2019120799

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-00240-0280
CONDITIONED SPACE: 1589 sqft
CONDITIONED SPACE: 1589 sqft
GARAGE: 427 sqft
GARAGE: 427 sqft
OPENED PORCH (WITH ROOF) : 163 sqft
OPENED PORCH (WITH ROOF) : 163 sqft
OPENED PORCH (WITH ROOF) : 53 sqft
OPENED PORCH (WITH ROOF) : 53 sqft
Total Square Footage: 4464 sqft
Block: 00240
Subdivision: 2211 - SECTION 59-SEMINOLE PARK
Job Phone: 386-237-1210
Location Address: 1 SEATHORN PATH
Type: DU - DUPLEX
Issue Date: 02/14/2020
NOC: RECORDED
Applicant name: ANDRIY POPOV
Owner: POPOV ANDRIY

Address

27 A EMERALD LANE

PALM COAST, FL 32164

Lot: 0280
Contracted Stated Job Value: ¤250,000.00
Job Description: DUPLEX
Type: CN

Contractor

SILVER BREEZE HOMES
Status Location Address Mailing Address State License Number Phone
CANCEL

1 SEATHORN PATH

PALM COAST, FL 32164

PALM COAST, FL 32164

RR282812121 (Exp: 08/31/2023) 386-237-1210

Sub Contractors

MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
WESLEY KIRKLAND CORDELL
Status Location Address State License Number Phone
ACTIVE

873 HULL RD UNIT 20

ORMOND BEACH, FL 32174

SCC131151505 (Exp: 08/31/2026) 386-852-2209

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/12/2021 FINAL APPROVED TSTAUFFACHER
U -UTILITY RESIDENTIAL FINAL 04/06/2021 FINAL APPROVED JHARDING
ROW - FINAL INSPECTION 04/05/2021 APPROVED RGROSS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION the dumpster needs to be removed and sod put in place to repair any damage NEED TO REPAIR THE SWALE ACROSS STREET,COMPLETELY REPAIR SWALE AND RE-SOD
ROW - FINAL INSPECTION 03/22/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: THIS IS A REINSPECTION the dumpster needs to be removed and sod put in place to repair any damage NEED TO REPAIR THE SWALE ACROSS STREET,COMPLETELY REPAIR SWALE AND RE-SOD
ROW FIELD SURVEY /GRADING CERTIFICATION 01/14/2021 APPROVED - AS NOTED KRUTH
Note: THIS IS A REINSPECTION DRIVEWAY ON SEATTLE TRL INVERT NUMBERS ARE OUT OF TOLERANCE INVERT 4.90 PIPE L4.56=R4.60 IS MORE THE 2/10 TOLERANCE DRIVEWAY ON RIGHT SIDE ALSO SAME PROBLEM INVERT4.70 LEFT SIDE PIPE 4.47 = RIGHT SIDE 4.42 MORE THE 2/10 TOLERANCE PLEASE MAKE SURE YOU ASK THE SURVEY TO RE-CHECK THOSE NUMBERS. RIGHT SIDE RIGHT AFTER THE SMALL WINDOW THE BERM RUN FLAT I LEFTED PAINTED WITH PINK PAINT BACK SIDE ALSO WE NEED TO RAISE THE BERM MORE TO PREVENT WATER GOING TO THE ADJACENT PROPERTY The subject lots drainage must not negatively impact any adjacent property. B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) IF YOU HAVE ANY QUESTION GIVE ME A CALL AT 3862253840 GABRIEL AT THE CORNER LEFT THE ROAD PAINT NEED TO BE CUT IT AND REPLACE WITH HOT PATCH 1/1/2021 CORRECTIONS MADE
FINAL SURVEY (OFFICE USE ONLY) 01/14/2021 APPROVED - AS NOTED KRUTH
Note: THIS IS A REINSPECTION DRIVEWAY ON SEATTLE TRL INVERT NUMBERS ARE OUT OF TOLERANCE INVERT 4.90 PIPE L4.56=R4.60 IS MORE THE 2/10 TOLERANCE DRIVEWAY ON RIGHT SIDE ALSO SAME PROBLEM INVERT4.70 LEFT SIDE PIPE 4.47 = RIGHT SIDE 4.42 MORE THE 2/10 TOLERANCE PLEASE MAKE SURE YOU ASK THE SURVEY TO RE-CHECK THOSE NUMBERS. Corrections made pipe is within tolerance
FINAL SURVEY (OFFICE USE ONLY) 12/28/2020 Disapproved -FEE REQUIRED GBERTOLA
Note: DRIVEWAY ON SEATTLE TRL INVERT NUMBERS ARE OUT OF TOLERANCE INVERT 4.90 PIPE L4.56=R4.60 IS MORE THE 2/10 TOLERANCE DRIVEWAY ON RIGHT SIDE ALSO SAME PROBLEM INVERT4.70 LEFT SIDE PIPE 4.47 = RIGHT SIDE 4.42 MORE THE 2/10 TOLERANCE PLEASE MAKE SURE YOU ASK THE SURVEY TO RE-CHECK THOSE NUMBERS.
ROW FIELD SURVEY /GRADING CERTIFICATION 12/28/2020 Disapproved - NO FEE GBERTOLA
Note: DRIVEWAY ON SEATTLE TRL INVERT NUMBERS ARE OUT OF TOLERANCE INVERT 4.90 PIPE L4.56=R4.60 IS MORE THE 2/10 TOLERANCE DRIVEWAY ON RIGHT SIDE ALSO SAME PROBLEM INVERT4.70 LEFT SIDE PIPE 4.47 = RIGHT SIDE 4.42 MORE THE 2/10 TOLERANCE PLEASE MAKE SURE YOU ASK THE SURVEY TO RE-CHECK THOSE NUMBERS. RIGHT SIDE RIGHT AFTER THE SMALL WINDOW THE BERM RUN FLAT I LEFTED PAINTED WITH PINK PAINT BACK SIDE ALSO WE NEED TO RAISE THE BERM MORE TO PREVENT WATER GOING TO THE ADJACENT PROPERTY The subject lots drainage must not negatively impact any adjacent property. B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) IF YOU HAVE ANY QUESTION GIVE ME A CALL AT 3862253840 GABRIEL AT THE CORNER LEFT THE ROAD PAINT NEED TO BE CUT IT AND REPLACE WITH HOT PATCH
ROW - FINAL INSPECTION 12/08/2020 Disapproved - NO FEE KRUTH
Note: the dumpster needs to be removed and sod put in place to repair any damage
ROW - FINAL APRON (AFTER POUR) 12/07/2020 APPROVED - AS NOTED KRUTH
Note: THIS IS A REINSPECTION CHECK FOR DIRT AND SOD. COMPACTED DIRT AND SOD MUST BE PLACED AROUND ALL EDGES OF THE POURED CONCRETE INCLUDING THE DRIVEWAY SHOULDERS TO PREVENT WASHOUT. ? CHECK FOR PAVEMENT REPAIR. REPAIR THE ROAD ALONG THE FULL WIDTH OF THE DRIVEWAY AND ANY OTHER ROAD DAMAGE WITH HOT PATCH ASPHALT 12/7/2020 corrections made
ELECTRIC - EARLY POWER 11/03/2020 APPROVED JBODEN
ROW - FINAL APRON (AFTER POUR) 10/28/2020 Disapproved - NO FEE GBERTOLA
Note: CHECK FOR DIRT AND SOD. COMPACTED DIRT AND SOD MUST BE PLACED AROUND ALL EDGES OF THE POURED CONCRETE INCLUDING THE DRIVEWAY SHOULDERS TO PREVENT WASHOUT. ? CHECK FOR PAVEMENT REPAIR. REPAIR THE ROAD ALONG THE FULL WIDTH OF THE DRIVEWAY AND ANY OTHER ROAD DAMAGE WITH HOT PATCH ASPHALT
ROW- PRE-APRON (PRE-POUR) 10/22/2020 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION READY TO POUR. HEAVY RAIN IN FORECAST. BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING
ROW- PRE-APRON (PRE-POUR) 10/16/2020 CANCELLED BY APPLICANT KHOWELL
U - SEWER TIE IN 09/04/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 09/04/2020 APPROVED JGIBSON
TIE BEAM / LINTEL 08/17/2020 APPROVED FWILLIS
Note: Party Wall Dividing Units Patios.
INSULATION 08/14/2020 APPROVED FWILLIS
LATH/BRICK/ WATER BARRIER 08/05/2020 APPROVED FWILLIS
PEP TANK INSTALLATION REQUEST 08/04/2020 APPROVED CSTONE
ALL ROUGH 08/03/2020 APPROVED FWILLIS
ROOF VALLEY & METAL 07/16/2020 APPROVED FWILLIS
FOOTER 07/15/2020 APPROVED FWILLIS
FIREWALL 07/08/2020 APPROVED FWILLIS
Note: THIS IS A REINSPECTION Firewall in BOTH UNITS have some type of slot at the top (opening). Also some questionable penertration areas. Questionable areas are marked on the wall with a GREEN arrow pointing to the area.
FIREWALL 07/06/2020 Disapproved - NO FEE FWILLIS
Note: Firewall in BOTH UNITS have some type of slot at the top (opening). Also some questionable penertration areas. Questionable areas are marked on the wall with a GREEN arrow pointing to the area.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/29/2020 APPROVED FWILLIS
TIE BEAM / LINTEL 06/11/2020 APPROVED FWILLIS
Note: THIS IS A REINSPECTION No approved drawings on site. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL
TIE BEAM / LINTEL 06/10/2020 Disapproved -FEE REQUIRED FWILLIS
Note: No approved drawings on site. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL
FOUND SURVEY APPROVED (OFFICE) 06/03/2020 APPROVED TBAKER
MONOLITHIC SLAB 05/08/2020 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 05/01/2020 APPROVED - AS NOTED JGIBSON
Note: THIS IS A REINSPECTION ADDED ON 4/23/2020 11:24:28 AM Inspection approval from the 4/3/20 inspection removed and inspection marked disapproved - no fee. Inspection is now disapproved as an issue with the PEP tank location has come to City Utilities attentioni and the PEP tank revised location previously approved is now rescinded. The PEP tank will need to be located at its original approved location in the rear yard, underground plumbing re-worked to drain to the PEP tank location and re-inspected prior to covering / pouring monolithic slab rfoundation ALLPLUMBING HAS BEENRE-WORKED TO APPROVED PEP TANK LOCATION
PLUMBING 1ST ROUGH UNDERGROUND 04/03/2020 Disapproved - NO FEE PBUCKLEY
Note: Inspection approval from the 4/3/20 inspection removed and inspection marked disapproved - no fee. Inspection is now disapproved as an issue with the PEP tank location has come to City Utilities attentioni and the PEP tank revised location previously approved is now rescinded. The PEP tank will need to be located at its original approved location in the rear yard, underground plumbing re-worked to drain to the PEP tank location and re-inspected prior to covering / pouring monolithic slab rfoundation
WATER METER INSTALLATION REQUEST 03/13/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN COMPLETE 01/13/2021 01/13/2021
Note: Released By: MDEFREITAS
BADMIN HOLD 01/12/2021 01/12/2021
Note: Held By: STHOMAS NOC HAS EXPIRED
BADMIN HOLD 01/12/2021 01/12/2021
Note: Held By: STHOMAS 1. NOTARY AT BOTTOM MUST PRINT OWNER NAME AS BEING NOTARIZED. NOT 'OWNER'. PLEASE RESUBMIT.
BADMIN HOLD 12/23/2020 12/23/2020
Note: Held By: MDEFREITAS I CANNOT SQUEDULE THE FINAL SURVEY DUE THERE IS A INSPECTION HOLD BY PATRICK BUCKLEY PLEASE CONTACT AT 986-3786
BADMIN COMPLETE 12/23/2020 12/23/2020
Note: Released By: MDEFREITAS
ZON COMPLETE 12/15/2020 12/15/2020
Note: Released By: ELENS Enclosing proposed lanai. Zoning review not required.
BLD COMPLETE 12/15/2020 12/22/2020
Note: Released By: FREODICA Revision - added screen enclosure a the back porch.
SW1 COMPLETE 12/15/2020 12/18/2020
Note: Released By: CTROHA Stormwater review not requested on Permit Correction/Revision Form
BLD COMPLETE 06/10/2020 06/17/2020
Note: Released By: FREODICA Revision dated 6-10-20- No change on building plans.
ZON COMPLETE 06/10/2020 06/11/2020
Note: Released By: ELENS
ENGIN1 COMPLETE 06/06/2020 06/08/2020
Note: Released By: TBAKER Foundation Survey
ZON COMPLETE 06/06/2020 06/08/2020
Note: Released By: ELENS Foundation Survey
BLD COMPLETE 06/06/2020 06/10/2020
Note: Released By: FREODICA Rev. 3 - added private wall at back porch.
UD1 COMPLETE 04/03/2020 04/06/2020
Note: Released By: AHALL
LOCATE COMPLETE 04/03/2020 04/09/2020
Note: Released By: CSTONE
ZON COMPLETE 02/12/2020 02/12/2020
Note: Released By: AMOBLEY
BLD COMPLETE 02/12/2020 02/14/2020
Note: Released By: JPI
ZON HOLD 02/03/2020 02/03/2020
Note: Held By: ELENS Repeat comment: In addition to banding, another form of articulation is required: LDC 13.03.03: B.Articulation. Facade articulation is required to add interest to a building. The following features shall be acceptable techniques of exterior articulation:1.A base course or plinth course; banding, moldings, or string courses; quoins; oriels; cornices; arches; balconies; brackets; shutters; keystones; dormers; louvers as part of the exterior wall construction.2.Quoins and banding shall wrap around the corners of the structure for at least two feet.3.Banding placed around the windows and doors visible from the right-of-way, golf course, canals, lakes, or other similar highly visible areas. Window shutters may substitute for banding.4.Horizontal banding continuing the length of the wall that faces a street, golf course, saltwater canal, or other similar highly visible areas.
ELEC COMPLETE 02/03/2020 02/04/2020
Note: Released By: JMUNSON
BLD HOLD 02/03/2020 02/05/2020
Note: Held By: JPI 1. Repeating comment. Please complete the product approval listing for structural components for the project.
PLUM COMPLETE 02/03/2020 02/05/2020
Note: Released By: JPI
UD1 COMPLETE 02/03/2020 02/06/2020
Note: Released By: LFITZGERALD
SW1 COMPLETE 02/03/2020 02/05/2020
Note: Released By: CTROHA
ENGIN1 COMPLETE 02/03/2020 02/03/2020
Note: Released By: TBAKER
SWALE COMPLETE 01/02/2020 01/29/2020
Note: Released By: TBAKER
BLD HOLD 12/23/2019 12/29/2019
Note: Held By: JPI 1. Please complete the product approval listing for siding, soffits, all structural components, and other information for the project. 2. On the roofing worksheet, for underlayment weight, please enter the # weight if using felt, or the mils if using peel and stick. 3. Provide safety device at water heater (tap and thermal expansion device). Add note. P607.3 4. Add label with note at garage walls. R302.5.2 Duct penetration. Ducts in the garage and ducts penetrating the walls or ceilings separating the dwelling from the garage shall be constructed of a minimum No. 26 gage (0.48 mm) sheet steel, 1 inch (25.4 mm) minimum rigid nonmetallic Class 0 or Class 1 duct board, or other approved material and shall not have openings into the garage. 5. Please add the label for a Vacuum Breaker on the hose bib. (R2902.4) 6. Please add the NFPA as a code reference.
CUSVC COMPLETE 12/23/2019 12/30/2019
Note: Released By: HHAND
ELEC HOLD 12/23/2019 12/27/2019
Note: Held By: JMUNSON Need outlet by A/C unit NEC 2014 art 210.63
ENGIN1 COMPLETE 12/23/2019 01/02/2020
Note: Released By: TBAKER
LOCATE COMPLETE 12/23/2019 01/02/2020
Note: Released By: CSTONE
MECH COMPLETE 12/23/2019 12/23/2019
Note: Released By: CPISCITELLI
PLUM COMPLETE 12/23/2019 12/29/2019
Note: Released By: JPI
SW1 COMPLETE 12/23/2019 12/30/2019
Note: Released By: CTROHA
UD1 COMPLETE 12/23/2019 01/02/2020
Note: Released By: LFITZGERALD
ZON HOLD 12/23/2019 12/23/2019
Note: Held By: ELENS A/C unit on right side cannot encroach in easement. A/C Pad on right side is not shown on the landscape plan. (Must also be screened with 7 gallon shrubs.) Need to remove left driveway on Seathorn Path from Site plan and Landscape Plan. (Driveways must lead to garage entrances.) Banding is required on all windows and doors facing public right of way. (Front and left sides.) In addition to banding, another form of articulation is required: LDC 13.03.03: B.Articulation. Facade articulation is required to add interest to a building. The following features shall be acceptable techniques of exterior articulation:1.A base course or plinth course; banding, moldings, or string courses; quoins; oriels; cornices; arches; balconies; brackets; shutters; keystones; dormers; louvers as part of the exterior wall construction.2.Quoins and banding shall wrap around the corners of the structure for at least two feet.3.Banding placed around the windows and doors visible from the right-of-way, golf course, canals, lakes, or other similar highly visible areas. Window shutters may substitute for banding.4.Horizontal banding continuing the length of the wall that faces a street, golf course, saltwater canal, or other similar highly visible areas.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 04/15/2021
REVISION ¤40.00 04/15/2021
STORMWATER REINSPECTION FEE ¤40.00 04/15/2021
CONTRACTOR CHANGE ¤40.00 12/15/2020
CONTRACTOR CHANGE ¤40.00 12/15/2020
REINSPECTION FEE ¤40.00 06/10/2020
REVISION ¤40.00 06/10/2020
CONTRACTOR CHANGE ¤40.00 03/12/2020
NEW RESIDENTIAL INSPECTIONS ¤810.00 02/14/2020
METER - DEPOSIT ¤120.00 02/14/2020
WATER- TURN ON ¤50.00 02/14/2020
ADMIN FEE ¤20.00 02/14/2020
CONNECTION FEES ¤2,005.76 02/14/2020
ELECTRIC FEE ¤303.00 02/14/2020
3% FIRE IMPACT FEE CREDIT (¤13.40) 02/14/2020
IMPACT FEE FIRE ¤446.76 02/14/2020
IMPACT FEE PARKS ¤1,698.48 02/14/2020
IMPACT FEE SCHOOL ¤7,200.00 02/14/2020
IMPACT FEE TRANSPORTATION ¤2,532.00 02/14/2020
MECHANICAL FEE ¤303.00 02/14/2020
WATER -IRRIGATION INSPECTION ¤50.00 02/14/2020
3% PARKS IMPACT FEE CREDIT (¤50.95) 02/14/2020
PLAN CHECK FEE ¤162.00 02/14/2020
PLUMBING FEE ¤303.00 02/14/2020
SITE PLAN 20 ¤20.00 02/14/2020
SURCHARGE FS 533.721 ¤17.59 02/14/2020
SURCHARGE - FS 468.631 ¤26.39 02/14/2020
STORM WATER PERMIT FEES ¤80.00 02/14/2020
3% TRANS IMPACT FEE CREDIT (¤75.96) 02/14/2020
SEWER CREDIT (¤2,932.00) 02/14/2020
SEWER INSPECTION ¤25.00 02/14/2020
SEWER CAPITAL FACILITY ¤9,192.14 02/14/2020
WATER CAPITAL FACILITY FEE ¤6,748.36 02/14/2020
Fees Total Due: ¤0.00 Total Paid: ¤29,361.17