Permit #2019120812

Permit Details

Status: COED

Parcel Id: 48-11-31-1710-00000-0150
CONDITIONED SPACE: 3021 sqft
GARAGE: 792 sqft
OPENED PORCH (WITH ROOF) : 440 sqft
OPENED PORCH (WITH ROOF) : 71 sqft
Total Square Footage: 4324 sqft
Block: 00000
Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II
Job Phone: 386-947-4481
Location Address: 206 WILLOW OAK WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/24/2020
NOC: RECORDED
Applicant name: ERIC CHRISTOPHER OLSEN
Owner: BLINN DONALD & PATRICIA H&W

Address

26 LAKESIDE DRIVE

PALM COAST, FL 32137

Lot: 0150
Contracted Stated Job Value: ¤519,200.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

OLSEN CUSTOM HOMES AND CONSULTING INC
Status Location Address State License Number Phone Fax
ACTIVE

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

CGC1508852 (Exp: 08/31/2026) 386-947-4481 (386)947-4484

Sub Contractors

BERT S MCLAUGHLIN
Status Location Address State License Number Phone
ACTIVE

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

EC13006455 (Exp: 08/31/2026) 386-265-2687
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
JEFFREY DALE KNIGHT
Status Location Address State License Number Phone Fax
INACTIVE

923 ASHMEADE CT

PORT ORANGE, FL 32127

CFC057351 (Exp: 08/31/2026) 386-345-3857 386-345-4443
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
MARK A RUGGIERO
Status Location Address State License Number Phone
INACTIVE

411 6TH STREET

HOLLY HILL , FL 32117

01612 (Exp: 07/23/2023) 386-252-5555

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 08/03/2020 FINAL APPROVED LFITZGERALD
U-CROSS CONNECTION 07/31/2020 APPROVED LFITZGERALD
ROW - STORMWATER FINAL 07/30/2020 APPROVED RGROSS
ROW - FINAL APRON (AFTER POUR) 07/30/2020 APPROVED RGROSS
FINAL SURVEY (OFFICE USE ONLY) 07/29/2020 Disapproved - NO FEE RGROSS
Note: THIS IS A REINSPECTION SOD MUST BE PLACED BEFORE FINAL SURVEY CAN BE ACCURATELY COMPLETE. 7/29/20 - Existing interior elevations on a 20’ grid needed. (E). As well as outside finished sod elevations near the foundation. Land Development Code Technical Manual, Section 300.01 (A)(1)(B)(6)
BLD - BUILDING FINAL 07/27/2020 Approval - Private Provider PPROVIDER
Note: THIS IS A REINSPECTION ADDED ON 7/23/2020 2:23:32 PM
BLD - BUILDING FINAL 07/23/2020 Disapproved- Private Provider PPROVIDER
FINAL SURVEY (OFFICE USE ONLY) 07/20/2020 Disapproved - NO FEE RGROSS
Note: SOD MUST BE PLACED BEFORE FINAL SURVEY CAN BE ACCURATELY COMPLETE.
GRAVITY SEWER TEST 07/16/2020 APPROVED JGIBSON
U - SEWER TIE IN 07/16/2020 APPROVED - AS NOTED JGIBSON
Note: PALM COAST UTILITY DEPARTMENT MADE U-SEWER TIE IN CONNECTION
ROW- PRE-APRON (PRE-POUR) 07/10/2020 APPROVED RGROSS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION APPROVED FOR THE APRON AND PAVER RESTRAINTS ONLY. PAVER DRIVEWAY 7/9/20 7:35am - NO PAVERS SHOULD BE PLACED UNTIL THIS 2ND PART OF THE PRE POUR HAS BEEN APPROVED. 7/10/20 - READY FOR PAVERS
ROW- PRE-APRON (PRE-POUR) 07/09/2020 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION APPROVED FOR THE APRON AND PAVER RESTRAINTS ONLY. PAVER DRIVEWAY 7/9/20 7:35am - NO PAVERS SHOULD BE PLACED UNTIL THIS 2ND PART OF THE PRE POUR HAS BEEN APPROVED.
FINAL SURVEY (OFFICE USE ONLY) 07/03/2020 APPROVED RGROSS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION SOD MUST BE PLACED BEFORE FINAL SURVEY CAN BE ACCURATELY COMPLETE. 7/29/20 - Existing interior elevations on a 20’ grid needed. (E). As well as outside finished sod elevations near the foundation. Land Development Code Technical Manual, Section 300.01 (A)(1)(B)(6)
ROW- PAVER RESTRAINTS 06/24/2020 APPROVED RGROSS
ROW- PRE-APRON (PRE-POUR) 06/24/2020 PARTIALLY APPROVED RGROSS
Note: APPROVED FOR THE APRON AND PAVER RESTRAINTS ONLY. PAVER DRIVEWAY
U - SEWER TIE IN 06/23/2020 CANCELLED BY APPLICANT WEB
GRAVITY SEWER TEST 06/23/2020 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION
ELECTRIC - EARLY POWER 06/01/2020 Approval - Private Provider PPROVIDER
ELEV CERT-FOUNDATION APPROVAL 04/13/2020 APPROVED JMYERS
LATH/BRICK/ WATER BARRIER 04/08/2020 Approval - Private Provider PPROVIDER
INSULATION 04/08/2020 Approval - Private Provider PPROVIDER
GAS ROUGH 04/06/2020 Approval - Private Provider PPROVIDER
ALL ROUGH 04/06/2020 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 03/19/2020 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/16/2020 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 03/16/2020 APPROVED TBAKER
ELECTRIC-TUG 03/16/2020 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 03/05/2020 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 02/19/2020 Disapproved -FEE REQUIRED JGIBSON
Note: P-2503.2 CONCEALMENT OF SEWER SYSYTEM OR BUILDING DRAIN
MONOLITHIC SLAB 02/17/2020 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 02/06/2020 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 01/31/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
PLFM COMPLETE 07/31/2020 07/31/2020
Note: Released By: JMYERS The Final elevation certificate has been approved.
PLFM HOLD 07/17/2020 07/17/2020
Note: Held By: JMYERS There is no finished floor elevation noted for the garage on the Final Survey. Please update the Final Survey to match the elevation for the garage on the Elevation Certificate.
PLFM COMPLETE 04/13/2020 04/13/2020
Note: Released By: JMYERS The Building elevation certificate has been accepted. Please provide Final prior to receiving CO.
PLFM HOLD 04/08/2020 04/09/2020
Note: Held By: JMYERS In Section C2, the measurement boxes must be checked if there is a measurement. C2 a,d,e,f,g,h are all missing the measurement box check. In Section D there must be a date on top of the seal inside the box along with the signature. There must also be a signature and current date where it notes Signature below the surveyors information.
PLFM HOLD 04/06/2020 04/06/2020
Note: Held By: JMYERS All pages of the elevation certificate must be turned in. In Section C2, the measurement boxes must be checked if there is a measurement. C2 a,d,e,f,g,h are all missing the measurement box check. Please write the date on top of the seal in the provided box in Section D. If you have questions about these comments please call 386-986-2320.
PLFM HOLD 03/24/2020 03/24/2020
Note: Held By: JMYERS Comments not addressed. The Construction elevation certificate has already been turned in, if this is supposed to be a Foundation elevation certificate the Building Under Construction box must be checked. Also FEMA released a new elevation certificate that must be used.
ENGIN1 COMPLETE 03/12/2020 03/16/2020
Note: Released By: TBAKER
PLFM HOLD 03/12/2020 03/13/2020
Note: Held By: JMYERS The Construction elevation certificate has already been turned in, if this is supposed to be a Foundation elevation certificate the Building Under Construction box must be checked. Also FEMA released a new elevation certificate that must be used.
BLD COMPLETE 03/11/2020 03/18/2020
Note: Released By: FREODICA Revision: Truss repair
ZON COMPLETE 02/05/2020 02/06/2020
Note: Released By: AMOBLEY
BLD COMPLETE 01/30/2020 01/30/2020
Note: Released By: JPI
ZON HOLD 01/30/2020 01/30/2020
Note: Held By: ELENS Revision sheet states the house is being moved back 30 feet but the survey/site plan submitted shows the house in the same place as previously approved.
SW1 COMPLETE 01/30/2020 02/04/2020
Note: Released By: CTROHA
PLFM COMPLETE 01/30/2020 01/30/2020
Note: Released By: JMYERS No comments
PLFM COMPLETE 01/22/2020 01/22/2020
Note: Released By: DBEVAN The 01-21-20 dated elevation certificate was found sufficient. Note that elevation certificates will be required for "Building Under Construction" and "Finished Construction.
BLD COMPLETE 01/15/2020 01/23/2020
Note: Released By: PBUCKLEY
ZON COMPLETE 01/15/2020 01/15/2020
Note: Released By: ELENS
ZON HOLD 01/15/2020 01/15/2020
Note: Held By: ELENS Repeat comments: 1. Site plan must note material for proposed driveway. 2. Site plan must show width of proposed driveway at garage doors. Note that it must be a minimum of 24' wide.
PLFM HOLD 01/15/2020 01/15/2020
Note: Held By: JMYERS On the Elevation Certificate: In Section C2, there are no elevations noted for the proposed structure. These elevations must be included to show that the finished floor elevation will be at least 1ft above BFE. Also in Section C2, please do not check the measurement box if the elevation is N/A. In Section D it must be signed both on top of the raised seal inside the provided box as well as where a signature is noted. Only the actual Elevation Certificate document is required, not all of the instructions. Elevation certificates must be turned in hard copy. On the Survey: in the Flood Zone Information it notes that there is no Base Flood Elevation, this is incorrect as Zone AE has an established BFE. Please correct the Flood Zone Information.
SW1 COMPLETE 01/15/2020 01/16/2020
Note: Released By: CTROHA
PLUM COMPLETE 01/15/2020 01/15/2020
Note: Released By: JPI
BLD HOLD 01/02/2020 01/02/2020
Note: Held By: PBUCKLEY SPOKE WITH SARAH AND TOLD HER THE TRUSS LAYOUT PLAN SIGNED AND SEALED B THE ENGINEER IS ACCEPTABLE AND SATISFIES THE COMMENT ABOUT TRUSSES. THAT COMMENT NOW REMOVED. PLEASE MAKE REMAINING PLAN REVISIONS AS NOTED BELOW. 1. Please complete the product approval listing for siding, soffits, all structural components, and other information for the project. . 2. On the roofing worksheet, for underlayment weight, please enter the the mils if using peel and stick (application says tile roof). 3. Add label with note at garage walls. R302.5.2 Duct penetration. Ducts in the garage and ducts penetrating the walls or ceilings separating the dwelling from the garage shall be constructed of a minimum No. 26 gage (0.48 mm) sheet steel, 1 inch (25.4 mm) minimum rigid nonmetallic Class 0 or Class 1 duct board, or other approved material and shall not have openings into the garage. 4. Please add the label for a Vacuum Breaker on the hose bib. (R2902.4)
BLD HOLD 12/23/2019 12/31/2019
Note: Held By: JPI 1. Please complete the product approval listing for siding, soffits, all structural components, and other information for the project. The truss layout sheet is not the signed and sealed package which typically would list the structural components. 2. On the roofing worksheet, for underlayment weight, please enter the the mils if using peel and stick (application says tile roof). 3. Add label with note at garage walls. R302.5.2 Duct penetration. Ducts in the garage and ducts penetrating the walls or ceilings separating the dwelling from the garage shall be constructed of a minimum No. 26 gage (0.48 mm) sheet steel, 1 inch (25.4 mm) minimum rigid nonmetallic Class 0 or Class 1 duct board, or other approved material and shall not have openings into the garage. 4. Please add the label for a Vacuum Breaker on the hose bib. (R2902.4)
CUSVC COMPLETE 12/23/2019 12/31/2019
Note: Released By: HHAND
ELEC COMPLETE 12/23/2019 12/27/2019
Note: Released By: JMUNSON
ENGIN1 COMPLETE 12/23/2019 01/03/2020
Note: Released By: TBAKER
LOCATE COMPLETE 12/23/2019 12/27/2019
Note: Released By: CSTONE
MECH COMPLETE 12/23/2019 12/23/2019
Note: Released By: CPISCITELLI
PLUM HOLD 12/23/2019 12/31/2019
Note: Held By: PBUCKLEY Released By: LFITZGERALD Held By: JPI 1. Please provide a vent for the kitchen sink or show an AAV. FPC 905.1 2. Please show the exterior cleanout location and label the sewer pipe size. The diagram does not show the sewer. Typical legend for the c/o is a circle at the cleanout location.
SW1 HOLD 12/23/2019 12/30/2019
Note: Held By: CTROHA Applicant needs to provide FFE on adjacent improved lots and elevations 10' ouside of the property lines Applicant needs to show proposed elevations on a 20' grid also show proposed drainage elevations. Applicant must match existing elevations at the property line of improved lots and show proposed drainage conveyance inside the property line. Applicant needs to provide final sod elevations at all four corners of the foundation
UD1 COMPLETE 12/23/2019 01/03/2020
Note: Released By: AHALL
ZON HOLD 12/23/2019 12/23/2019
Note: Held By: TDOAK 1. Site plan must note material for proposed driveway. 2. Site plan must show width of proposed driveway at garage doors. Note that it must be a minimum of 24' wide.
URB COMPLETE 12/23/2019 01/13/2020
Note: Released By: JBEAUDET
PLFM HOLD 12/23/2019 12/23/2019
Note: Held By: JMYERS The entire property is located in an AE Zone. Elevation Certificates will be required at 3 stages: Construction Drawings, Foundation, and Final. Elevation Certificates must be turned in hard copy.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/31/2020
REINSPECTION FEE ¤40.00 07/31/2020
REVISION ¤40.00 07/31/2020
SITE PLAN 20 ¤20.00 01/24/2020
SURCHARGE FS 533.721 ¤21.96 01/24/2020
SURCHARGE - FS 468.631 ¤32.94 01/24/2020
STORM WATER PERMIT FEES ¤80.00 01/24/2020
3% TRANS IMPACT FEE CREDIT (¤89.43) 01/24/2020
SEWER INSPECTION ¤25.00 01/24/2020
METER - DEPOSIT ¤60.00 01/24/2020
WATER-METER ¤434.59 01/24/2020
WATER-METER ¤361.04 01/24/2020
ADMIN FEE ¤20.00 01/24/2020
CONNECTION FEES ¤25.00 01/24/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 01/24/2020
IMPACT FEE FIRE ¤223.38 01/24/2020
IMPACT FEE PARKS ¤849.24 01/24/2020
IMPACT FEE SCHOOL ¤3,600.00 01/24/2020
IMPACT FEE TRANSPORTATION ¤2,981.00 01/24/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 01/24/2020
PLAN CHECK FEE ¤208.00 01/24/2020
Fees Total Due: ¤0.00 Total Paid: ¤8,940.54