Permit #2019120847
Permit Details
Status: COED
| Parcel Id: 07-11-31-7007-00460-0130 |
| CONDITIONED SPACE: 1938 sqft |
| GARAGE: 568 sqft |
| OPENED PORCH (WITH ROOF) : 200 sqft |
| OPENED PORCH (WITH ROOF) : 154 sqft |
| Total Square Footage: 2860 sqft |
| Block: 00460 |
| Subdivision: - |
| Job Phone: 386-864-2199 |
| Location Address: 11 FREEMONT CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/22/2020 |
| NOC: RECORDED |
| Applicant name: MAXIM TARANNIK |
| Owner: ALVARADO MARIBEL & MANUEL ALVARADO W&H |
|
Address 3 FORRESTER COURT PALM COAST, FL 32137 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤258,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLDEN MAGNOLIA, INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
RR282811984 (Exp: 08/31/2025) | 386-447-7007 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/28/2021 | FINAL APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION FRONT DOOR LOCKED NO ACCESS AND NO SPECIAL INSTRUCTIONS OR COMBINATION FOR LOCK. CALLED MAX. 01-27-21... missing locking caps on o/c unit FBC.M 1411.6 valve in master shower leaking 01-28-21... deficiencies noted above resolved | |||
| BLD - BUILDING FINAL | 01/27/2021 | Disapproved - NO FEE | WMILLER |
| Note: THIS IS A REINSPECTION FRONT DOOR LOCKED NO ACCESS AND NO SPECIAL INSTRUCTIONS OR COMBINATION FOR LOCK. CALLED MAX. 01-27-21... missing locking caps on o/c unit FBC.M 1411.6 valve in master shower leaking | |||
| PROJECT STATUS (OFFICE USE) | 01/27/2021 | Disapproved - NO FEE | RGROSS |
| Note: PROJECT STATUS ADDED BECAUSE THE STORMWATER INSPECTOR (ROBERT) THOUGHT THAT THE REGRADE PERMIT AQUIRED BY THE BUILDER WAS OUT OF REVIEW STATUS AND APPROVED. HOWEVER, THE REGRADE PERMIT IS STILL IN REVIEW. THEREFORE, THIS PROJECT STATUS WAS CREATED BY THE INSPECTOR UNTIL THE REGRADE PERMIT IS FULLY APPROVED. SEE REGRADE PERMIT 2021010675. | |||
| BLD - BUILDING FINAL | 01/26/2021 | Disapproved - NO FEE | FWILLIS |
| Note: FRONT DOOR LOCKED NO ACCESS AND NO SPECIAL INSTRUCTIONS OR COMBINATION FOR LOCK. CALLED MAX. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/26/2021 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 01/25/2021 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION FINAL SURVEY MUST BE APPROVED BEFORE THE FINAL STORMWATER CAN BE. 1/25/21 - FINAL SURVEY MUST BE APPROVED BEFORE THIS ONE CAN BE. | |||
| ROW - STORMWATER FINAL | 01/25/2021 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION FINAL SURVEY MUST BE APPROVED BEFORE THE FINAL STORMWATER CAN BE. 1/25/21 - FINAL SURVEY MUST BE APPROVED BEFORE THIS ONE CAN BE. 1/25/21 - RESCHEDULED SAME DAY BY INSPECTOR. BUILDER AQUIRED A REGRADE PERMIT 2021010675 TO CORRECT THE FAILED PROPERTY GRADE ISSUES. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/25/2021 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION FINAL SURVEY MUST BE APPROVED BEFORE THE FINAL APRON CAN BE. 1/25/21 - FINAL SURVEY MUST BE APPROVED BEFORE THIS ONE CAN BE. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/25/2021 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION FINAL SURVEY MUST BE APPROVED BEFORE THE FINAL APRON CAN BE. 1/25/21 - FINAL SURVEY MUST BE APPROVED BEFORE THIS ONE CAN BE. 1/25/21 - RESCHEDULED SAME DAY BY INSPECTOR. BUILDER AQUIRED A REGRADE PERMIT 2021010675 TO CORRECT THE FAILED PROPERTY GRADE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/25/2021 | Disapproved - NO FEE | RGROSS |
| Note: 1/25/21 - FINAL SURVEY MUST BE APPROVED BEFORE THIS ONE CAN BE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/25/2021 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION 1/25/21 - FINAL SURVEY MUST BE APPROVED BEFORE THIS ONE CAN BE. 1/25/21 - RESCHEDULED SAME DAY BY INSPECTOR. BUILDER AQUIRED A REGRADE PERMIT 2021010675 TO CORRECT THE FAILED PROPERTY GRADE ISSUES. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/25/2021 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION NOT GRADED TO THE APPROVED PROPOSED SITE PLAN AND AN UNAPPROVED PLYWOOD WALL WAS CONSTRUCTED IN THE EASEMENT ALONG THE LEFT PROPERTY LINE. BUILDER MADE A DEAL WITH CONRAD ON SITE TO AQUIRE A "REGRADE PERMIT" TO REMOVE THE WALL FROM THE EASEMENT AND REGRADE ACCORDING TO PLAN. NO REGRADE PERMIT IS ON RECORD. 1/25/21 - BUILDER DID AQUIRE A REGRADE PERMIT TO REMOVE THE PLYWOOD WALL AND REGRADE TO A 2 TO1 SLOPE ALONG THE LEFT PROPERTY LINE. SEE REGRADE PERMIT 2021010675. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/19/2021 | Disapproved - NO FEE | RGROSS |
| Note: NOT GRADED TO THE APPROVED PROPOSED SITE PLAN AND AN UNAPPROVED PLYWOOD WALL WAS CONSTRUCTED IN THE EASEMENT ALONG THE LEFT PROPERTY LINE. BUILDER MADE A DEAL WITH CONRAD ON SITE TO AQUIRE A "REGRADE PERMIT" TO REMOVE THE WALL FROM THE EASEMENT AND REGRADE ACCORDING TO PLAN. NO REGRADE PERMIT IS ON RECORD. | |||
| ROW - STORMWATER FINAL | 01/19/2021 | Disapproved - NO FEE | RGROSS |
| Note: FINAL SURVEY MUST BE APPROVED BEFORE THE FINAL STORMWATER CAN BE. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/19/2021 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION FINAL SURVEY MUST BE APPROVED BEFORE THE FINAL APRON CAN BE. | |||
| PROJECT STATUS (OFFICE USE) | 01/15/2021 | APPROVED - AS NOTED | CTROHA |
| Note: THIS IS A REINSPECTION REAR GRADE IS NOT ACCORDING TO THE ORIGINALLY APPROVED SITE PLAN. DRAINAGE SUPPOSED TO FLOW FROM REAR TO THE FRONT. I met with Max on site to discuss the drainage in the rear of the property. He needs to create a berm in the back and drain the property to the front swale. I recommended he use the left property line as the drainage conveyance for the rear yard. He already has to disturb the area due to a wooden wall built to hold the dirt in place. Then form a 2:1 slope into the vacant lot. The right property line would need a swale from the rear to drain the right rear corner. Max will pull a seperate regrade permit for this work prior to c/o so his buyer can close on the house. | |||
| ROW - FINAL APRON (AFTER POUR) | 12/21/2020 | Disapproved - NO FEE | GBERTOLA |
| Note: FIRST YOU NEED FIELD SURVEY AFTER POUR ROW FINAL | |||
| ROW- PRE-APRON (PRE-POUR) | 10/02/2020 | APPROVED - AS NOTED | RGROSS |
| Note: ON SITE WITH SUPER. SPECTRUM TO MOVED CABLE BEFORE POURING. AFTER THAT...READY TO POUR. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/30/2020 | CANCELLED BY APPLICANT | WEB |
| U - SEWER TIE IN | 09/18/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 09/18/2020 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 09/02/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: emailed FPL at 1:52 PM | |||
| LATH/BRICK/ WATER BARRIER | 07/15/2020 | APPROVED | WMILLER |
| INSULATION | 07/15/2020 | APPROVED | WMILLER |
| ALL ROUGH | 07/10/2020 | APPROVED | MMESSER |
| ALL ROUGH | 06/26/2020 | CANCELLED BY APPLICANT | WEB |
| ROOF VALLEY & METAL | 05/29/2020 | APPROVED | JDELBONIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/21/2020 | APPROVED - AS NOTED | JDELBONIS |
| Note: THIS IS A REINSPECTION where plywood span is more than 24 inches need blocking (TABLE R803.1) 1 hanger above front door needs to be changed wating on it was shorted | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/15/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: where plywood span is more than 24 inches need blocking (TABLE R803.1) | |||
| TIE BEAM / LINTEL | 04/24/2020 | APPROVED | JDELBONIS |
| FOUND SURVEY APPROVED (OFFICE) | 04/23/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/17/2020 | APPROVED | JDELBONIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/09/2020 | APPROVED | JDELBONIS |
| WATER METER INSTALLATION REQUEST | 01/27/2020 | APPROVED | CSTONE |
| PROJECT STATUS (OFFICE USE) | Disapproved - NO FEE | RGROSS | |
| Note: REAR GRADE IS NOT ACCORDING TO THE ORIGINALLY APPROVED SITE PLAN. DRAINAGE SUPPOSED TO FLOW FROM REAR TO THE FRONT. |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 01/15/2021 | 01/15/2021 |
| Note: Released By: RGROSS | |||
| SW1 | HOLD | 01/15/2021 | 01/15/2021 |
| Note: Held By: CTROHA | |||
| SW1 | COMPLETE | 01/15/2021 | 01/15/2021 |
| Note: Released By: RGROSS BUILDER TO APPLY FOR A REGRADE PERMIT AND FINISH PROPER DRAINAGE CONVEYANCE AFTER HOUSE CLOSING. | |||
| SW1 | HOLD | 01/12/2021 | 01/13/2021 |
| Note: Held By: RGROSS Drainage Conveyance on the original Site Plan approved to drain from back to front was not followed. Conveyance, as graded, will impact properties in the rear. | |||
| ZON | COMPLETE | 01/12/2021 | 01/12/2021 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 01/12/2021 | 01/13/2021 |
| Note: Released By: TBAKER | |||
| UTL | COMPLETE | 01/12/2021 | 01/13/2021 |
| Note: Released By: LFITZGERALD | |||
| ENGIN1 | COMPLETE | 04/22/2020 | 04/23/2020 |
| Note: Released By: TBAKER Foundation Survey | |||
| ZON | COMPLETE | 04/22/2020 | 04/23/2020 |
| Note: Released By: AMOBLEY Foundation Survey | |||
| BLD | COMPLETE | 01/10/2020 | 01/14/2020 |
| Note: Released By: JPI | |||
| PLUM | COMPLETE | 01/10/2020 | 01/14/2020 |
| Note: Released By: JPI | |||
| ZON | COMPLETE | 01/10/2020 | 01/10/2020 |
| Note: Released By: AMOBLEY | |||
| UD1 | COMPLETE | 01/10/2020 | 01/14/2020 |
| Note: Released By: AHALL | |||
| ENGIN1 | COMPLETE | 01/10/2020 | 01/13/2020 |
| Note: Released By: TBAKER | |||
| SWALE | COMPLETE | 01/03/2020 | 02/04/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 12/27/2019 | 12/31/2019 |
| Note: Held By: JPI 1. Add label with note at garage walls. R302.5.2 Duct penetration. Ducts in the garage and ducts penetrating the walls or ceilings separating the dwelling from the garage shall be constructed of a minimum No. 26 gage (0.48 mm) sheet steel, 1 inch (25.4 mm) minimum rigid nonmetallic Class 0 or Class 1 duct board, or other approved material and shall not have openings into the garage. 2. Please add the label for a Vacuum Breaker on the hose bib. (R2902.4) 3. Provide safety device at water heater (tap and thermal expansion device). Add note. P607.3 4. Garage door entrance. R302.5.1 Other openings between the garage and residence shall be equipped with solid wood doors not less than 13/8 inches (35 mm) in thickness, solid or honeycomb core steel doors not less than 13/8 inches (35 mm) thick, or 20-minute fire-rated doors. Please label the door option. | |||
| CUSVC | COMPLETE | 12/27/2019 | 12/30/2019 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 12/27/2019 | 12/30/2019 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 12/27/2019 | 01/03/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 12/27/2019 | 01/02/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 12/27/2019 | 12/30/2019 |
| Note: Released By: CPISCITELLI | |||
| PLUM | HOLD | 12/27/2019 | 12/31/2019 |
| Note: Held By: JPI 1. The submittal contains 2 plumbing riser diagrams. Please delete one from the submittal. | |||
| SW1 | HOLD | 12/27/2019 | 12/30/2019 |
| Note: Held By: CTROHA Applicant must match existing elevations at the property line of improved lots and show proposed drainage conveyance inside the property line. Applicant needs to show a berm along the back right side of the property with a minimum 4:1 slope to the existing fence. Per the design standard 300.01 Backfilling against existing fencing is not permitted, unless that fence is encroaching on the property and an agreement cannot be reached with the adjoining property owner. | |||
| UD1 | COMPLETE | 12/27/2019 | 01/03/2020 |
| Note: Released By: AHALL | |||
| ZON | COMPLETE | 12/27/2019 | 12/27/2019 |
| Note: Released By: TDOAK |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 10/16/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤516.00 | 01/22/2020 |
| SITE PLAN 20 | ¤20.00 | 01/22/2020 |
| SURCHARGE FS 533.721 | ¤12.00 | 01/22/2020 |
| SURCHARGE - FS 468.631 | ¤18.01 | 01/22/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/22/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 01/22/2020 |
| SEWER INSPECTION | ¤25.00 | 01/22/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 01/22/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 01/22/2020 |
| METER - DEPOSIT | ¤60.00 | 01/22/2020 |
| WATER- TURN ON | ¤25.00 | 01/22/2020 |
| ADMIN FEE | ¤20.00 | 01/22/2020 |
| CONNECTION FEES | ¤1,002.88 | 01/22/2020 |
| ELECTRIC FEE | ¤214.80 | 01/22/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 01/22/2020 |
| IMPACT FEE FIRE | ¤223.38 | 01/22/2020 |
| IMPACT FEE PARKS | ¤849.24 | 01/22/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/22/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 01/22/2020 |
| MECHANICAL FEE | ¤214.80 | 01/22/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/22/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/22/2020 |
| PLAN CHECK FEE | ¤103.20 | 01/22/2020 |
| PLUMBING FEE | ¤214.80 | 01/22/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,785.22 |