Permit #2019120896

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7015-00020-0950
Block: 00020
Subdivision: 2194 - SECTION 15-COUNTRY CLUB COVE
Job Phone: 904-282-5050
Location Address: 64 COCHISE CT
Type: ME - MECHANICAL
Issue Date: 12/30/2019
NOC: Unknown
Applicant name: MICHAEL R NIQUETTE
Owner: BORNREADY HOLDINGS PTY LTD TRUSTEE

Address

OCEAN SHORES

NSW 2483, 0

Address

15 MULI MULI AVE

NSW 2483, 0

Lot: 0950
Contracted Stated Job Value: ¤1,500.00
Job Description: 2 TON, 14 SEER HEATPUMP SPLIT EQUAL
Type: CN

Contractor

TOTAL AIR CARE INC
Status Location Address State License Number Phone Fax
CANCEL

PO BOX 2004

ORANGE PARK, FL 32065

CAC1815232 (Exp: 08/31/2022) 904-282-5050 904-291-5956

Inspection History

Type Request Date Result Inspector
HVAC FINAL 03/26/2020 FINAL APPROVED CPISCITELLI
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION MOCP RATING NOT MATCHING BREAKERS MFBC 1303. (Breaker for AHU in panel was changed but the breaker in attic was not changed to a 45AMP. Need to change breaker in attic to 45 AMP) Above was corrected on this permit
HVAC FINAL 03/11/2020 Disapproved -FEE REQUIRED CPISCITELLI
Note: THIS IS A REINSPECTION MOCP RATING NOT MATCHING BREAKERS MFBC 1303. (Breaker for AHU in panel was changed but the breaker in attic was not changed to a 45AMP. Need to change breaker in attic to 45 AMP)
HVAC FINAL 03/04/2020 Disapproved -FEE REQUIRED CPISCITELLI
Note: THIS IS A REINSPECTION. Breaker for AHU is still incorrect. The Minimum circuit amps @240V is 44AMP. The Max fuse is 45AMP. There is a 40AMP in panel. The breaker needs to be a 45AMP
HVAC FINAL 02/24/2020 Disapproved -FEE REQUIRED CPISCITELLI
Note: THIS IS A REINSPECTION. MOCP RATING NOT MATCHING BREAKERS MFBC 1303. ( Breakers are still incorrect. Changed the wrong breakers. changed the breakers for the main house unit not porch unit. Need 45 AMP for AHU and 25 AMP max for ODU)
HVAC FINAL 01/10/2020 Disapproved -FEE REQUIRED CPISCITELLI
Note: 1. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL (need the APPROVED AHRI on site at time of final) 2. MOCP RATING NOT MATCHING BREAKERS MFBC 1303( ODU calls for Max of 25 AMP. AHU calls for 45AMP @220v. The breakers need to be changed) 3. 3 inches ABOVE THE GROUND FBC, R, M1305.1.4.1 3inches ABOVE THE ADJOINING GROUND. (ODU is level with grade. Need to install a hurricane pad under unit) 4. PAN SIZE M1411.3.1 (1) AUXILIARY AND SECONDARY DRAIN SYSTEMS MUST NOT BE LESS THAN 3” LONGER AND WIDER.( Drain pan in attic it too small and unit is not inside pan. Need to install larger drain pan and center AHU in pan.)

Review History

Department Status Date In Date Out
MECH COMPLETE 12/30/2019 12/30/2019
Note: Released By: CPISCITELLI

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 03/11/2020
REINSPECTION FEE ¤40.00 03/04/2020
REINSPECTION FEE ¤40.00 02/24/2020
REINSPECTION FEE ¤40.00 02/20/2020
ADMIN FEE ¤20.00 12/30/2019
INSPECTION 40 ¤40.00 12/30/2019
SURCHARGE FS 533.721 ¤2.00 12/30/2019
SURCHARGE - FS 468.631 ¤2.00 12/30/2019
Fees Total Due: ¤0.00 Total Paid: ¤224.00