I want to search for...
Permit #2020010244
Permit Details
Status: COED
| Parcel Id: 07-11-31-7011-00030-0110 |
| CONDITIONED SPACE: 1492 sqft |
| GARAGE: 459 sqft |
| OPENED PORCH (WITH ROOF) : 96 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| Total Square Footage: 2079 sqft |
| Block: 00030 |
| Subdivision: 2193 - SECTION 11-BELLE TERRE |
| Job Phone: 386-627-8993 |
| Location Address: 97 BERKSHIRE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/18/2020 |
| NOC: RECORDED |
| Applicant name: WILLIAM PIERCE STOUGHTON |
| Owner: DURAN WENDY M & JOSEPH P TRINKLE JTWROS |
|
Address 276 BEACHWAY DRIVE PALM COAST, FL 32137 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤130,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
STOUGHTON & DURAN CUSTOM HOMES LLC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1478 BUNNELL, FL 32110 |
CGC047560 (Exp: 08/31/2026) | 386-627-8993 | 866-576-9888 |
Sub Contractors
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| CANCEL |
17 UNIMAY CT BUNNELL, FL 32110 |
EC0002436 (Exp: 08/31/2022) | 386-931-2568 |
RICHARD LEE VONBROCKEN
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
1738 STATE AVE HOLLY HILL, FL 32117 |
CAC035516 (Exp: 08/31/2026) | (386)672-1950 | (386)672-1952 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
BRIAN CHRISTOPHER MULLEN
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 351158 PALM COAST, FL 0 |
CCC1330417 (Exp: 08/31/2026) | 386-385-8504 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/12/2021 | FINAL APPROVED | FWILLIS |
| ROW - STORMWATER FINAL | 05/12/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION hot patch needs to be done | |||
| BLD - BUILDING FINAL | 05/03/2021 | CANCELLED BY APPLICANT | WEB |
| U-CROSS CONNECTION | 04/29/2021 | APPROVED | DHANEY |
| U -UTILITY RESIDENTIAL FINAL | 04/29/2021 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 04/29/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: hot patch needs to be done | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/28/2021 | APPROVED | KRUTH |
| ROW - FINAL APRON (AFTER POUR) | 04/28/2021 | APPROVED | KRUTH |
| Note: THIS IS A REINSPECTION needs so then a finalsurvey before the after pour and row stormwater final can be done hot patch needs done | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/28/2021 | APPROVED | KRUTH |
| ROW - FINAL APRON (AFTER POUR) | 03/03/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: needs so then a finalsurvey before the after pour and row stormwater final can be done | |||
| ROW- PRE-APRON (PRE-POUR) | 03/01/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION *TOO MUCH MATERIAL IN THE POUR AREA. MINIMUM 4 INCHES THROUGHOUT THE POUR BEYOND THE ROW. *MATERIAL ALL OVER NEEDS MORE COMPACTION. ALL FILL IS SOFT AND FLUFFY AS IF JUST ADDED WITH NO COMPACTION. *CULVERT TO BE BURIED ONLY 50 % NOT 90 TO 95%. *NOT 4 INCHES THICK AT THE GARAGE AND PORCH ENTRANCE. pipe is out of tolerance It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/25/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THIS IS A REINSPECTION *TOO MUCH MATERIAL IN THE POUR AREA. MINIMUM 4 INCHES THROUGHOUT THE POUR BEYOND THE ROW. *MATERIAL ALL OVER NEEDS MORE COMPACTION. ALL FILL IS SOFT AND FLUFFY AS IF JUST ADDED WITH NO COMPACTION. *CULVERT TO BE BURIED ONLY 50 % NOT 90 TO 95%. *NOT 4 INCHES THICK AT THE GARAGE AND PORCH ENTRANCE. pipe is out of tolerance | |||
| ELECTRIC - EARLY POWER | 02/23/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 1:50 | |||
| ELECTRIC - EARLY POWER | 02/22/2021 | Disapproved - NO FEE | RMARTIN |
| Note: MISSING PANEL BLANKS IN GARAGE PANEL UN-USED OPENING, NEC 110.12A MISSING 4GANG SWITCH PLATE IN MASTER BATH | |||
| U - SEWER TIE IN | 02/18/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 02/17/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: U-SEWER WILL BE CALLED IN TOMMOROW | |||
| ROW- PRE-APRON (PRE-POUR) | 02/08/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: *TOO MUCH MATERIAL IN THE POUR AREA. MINIMUM 4 INCHES THROUGHOUT THE POUR BEYOND THE ROW. *MATERIAL ALL OVER NEEDS MORE COMPACTION. ALL FILL IS SOFT AND FLUFFY AS IF JUST ADDED WITH NO COMPACTION. *CULVERT TO BE BURIED ONLY 50 % NOT 90 TO 95%. *NOT 4 INCHES THICK AT THE GARAGE AND PORCH ENTRANCE. | |||
| ELECTRIC - EARLY POWER | 01/08/2021 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC-TUG | 01/08/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 10:10 am | |||
| LATH/BRICK/ WATER BARRIER | 12/10/2020 | APPROVED | FWILLIS |
| INSULATION | 12/08/2020 | APPROVED | FWILLIS |
| ALL ROUGH | 12/04/2020 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: Tape vertical joints on vent pipes as discussed//check at insulation THIS IS A REINSPECTION Items not complete from last inspection ;; Complete work and call in when ready THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Please inspect TUG as well both for 97 & 101 Berkshire call TUG inspection when ready...seal snap lock on dryer vents up to roof deck. FBCR M1601......service wires need to be run at all rough.. 12/1/20 - Need Main Service Connected. work not donw...still need clips at rear bump out truss per plan detail and all notes above | |||
| ALL ROUGH | 12/03/2020 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: Items not complete from last inspection ;; Complete work and call in when ready THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Please inspect TUG as well both for 97 & 101 Berkshire call TUG inspection when ready...seal snap lock on dryer vents up to roof deck. FBCR M1601......service wires need to be run at all rough.. 12/1/20 - Need Main Service Connected. work not donw...still need clips at rear bump out truss per plan detail and all notes above | |||
| ALL ROUGH | 12/02/2020 | Disapproved - NO FEE | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Please inspect TUG as well both for 97 & 101 Berkshire call TUG inspection when ready...seal snap lock on dryer vents up to roof deck. FBCR M1601....no plans on site...service wires need to be run at all rough...need slider frame and front door installed or blocked... 12/1/20 - Need Main Service Connected. work not donw...still need clips at rear bump out truss per plan detail and all notes above | |||
| ALL ROUGH | 12/01/2020 | Disapproved - NO FEE | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Please inspect TUG as well both for 97 & 101 Berkshire call TUG inspection when ready...seal snap lock on dryer vents up to roof deck. FBCR M1601....no plans on site...service wires need to be run at all rough...need slider frame and front door installed or blocked... 12/1/20 - Need Main Service Connected. work not donw...still need clips at rear bump out truss per plan detail and all notes above | |||
| ALL ROUGH | 11/17/2020 | Disapproved - NO FEE | JCOLASANTI |
| Note: THIS IS A REINSPECTION Please inspect TUG as well both for 97 & 101 Berkshire call TUG inspection when ready...seal snap lock on dryer vents up to roof deck. FBCR M1601....no plans on site...service wires need to be run at all rough...need slider frame and front door installed or blocked... work not donw...still need clips at rear bump out truss per plan detail and all notes above | |||
| ALL ROUGH | 11/16/2020 | Disapproved - NO FEE | JCOLASANTI |
| Note: Please inspect TUG as well both for 97 & 101 Berkshire call TUG inspection when ready...seal snap lock on dryer vents up to roof deck. FBCR M1601....no plans on site...service wires need to be run at all rough...need slider frame and front door installed or blocked... | |||
| ROOF VALLEY & METAL | 10/30/2020 | APPROVED | JCOLASANTI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/27/2020 | APPROVED - AS NOTED | JCOLASANTI |
| Note: finish nailing strap Truss T11 in garage..need MTS 12 rafters to top plate bump out at kithen | |||
| FOUND SURVEY APPROVED (OFFICE) | 10/22/2020 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 09/09/2020 | APPROVED | JCOLASANTI |
| MONOLITHIC SLAB | 08/12/2020 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/03/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 07/21/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | HOLD | 04/26/2021 | 04/26/2021 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM MAIN CONTRACTOR NOT ACTIVE. CAN NOT ACCEPT ATTACHMENTS | |||
| BADMIN | COMPLETE | 04/26/2021 | 04/26/2021 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/21/2020 | 10/21/2020 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 10/21/2020 | 10/22/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 05/14/2020 | 05/14/2020 |
| Note: Released By: ELENS | |||
| BLD | COMPLETE | 05/14/2020 | 05/16/2020 |
| Note: Released By: JPI | |||
| ZON | HOLD | 02/11/2020 | 02/12/2020 |
| Note: Held By: ELENS Repeat Comment: Another form of articulation required in the front Land Development Code: 13.03.03. Facade design. B. Articulation.Facade articulation is required to add interest to a building. The following features shall be acceptable techniques of exterior articulation: 1. A base course or plinth course; banding, moldings, or string courses; quoins; oriels;cornices; arches; balconies; brackets; shutters; keystones; dormers; louvers as part of the exterior wall construction. 2. Quoins and banding shall wrap around the corners of the structure for at least two feet. 3. Banding placed around the windows and doors visible from the right-of-way, golf course,canals, lakes, or other similar highly visible areas. Window shutters may substitute for banding. 4. Horizontal banding continuing the length of the wall that faces a street, golf course,saltwater canal, or other similar highly visible areas. | |||
| BLD | HOLD | 02/11/2020 | 02/14/2020 |
| Note: Held By: JPI 1. On the product approval worksheet, please complete sections for siding, lintel, underlayment (if not on the roofing worksheet) and structural components with product approval numbers. | |||
| PLUM | COMPLETE | 02/11/2020 | 02/14/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 02/11/2020 | 02/13/2020 |
| Note: Released By: CTROHA | |||
| SWALE | COMPLETE | 01/13/2020 | 02/07/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 01/09/2020 | 01/09/2020 |
| Note: Held By: JPI 1. On the roofing worksheet, please provide the underlayment type. 2. On the product approval worksheet, please complete sections for siding, lintel, underlayment (if not on the roofing worksheet) and structural components. 3. Provide safety device at water heater (tap and thermal expansion device). Add note. P607.3. 4. Please add the label for a Vacuum Breaker on the hose bib. (R2902.4) 5. Garage door entrance. R302.5.1 Other openings between the garage and residence shall be equipped with solid wood doors not less than 13/8 inches (35 mm) in thickness, solid or honeycomb core steel doors not less than 13/8 inches (35 mm) thick, or 20-minute fire-rated doors. Please label the door option. 6. Add label with note at garage walls. R302.5.2 Duct penetration. Ducts in the garage and ducts penetrating the walls or ceilings separating the dwelling from the garage shall be constructed of a minimum No. 26 gage (0.48 mm) sheet steel, 1 inch (25.4 mm) minimum rigid nonmetallic Class 0 or Class 1 duct board, or other approved material and shall not have openings into the garage. | |||
| CUSVC | COMPLETE | 01/09/2020 | 01/09/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 01/09/2020 | 01/10/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 01/09/2020 | 01/13/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 01/09/2020 | 01/13/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 01/09/2020 | 01/10/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | HOLD | 01/09/2020 | 01/09/2020 |
| Note: Held By: JPI 1. Please submit the plumbing riser diagram. The review will continue after receiving the diagram. | |||
| SW1 | HOLD | 01/09/2020 | 01/10/2020 |
| Note: Held By: CTROHA 300.01 sec A part c9 states Backfilling against existing fencing is not permitted, unless that fence is encroaching on the property and an agreement cannot be reached with the adjoining property owner. It is permitted to slope from the top of a berm to the existing elevation at the property line at no greater than a 4:1 slope Must match existing elevations at the property line of an improved lot | |||
| UD1 | COMPLETE | 01/09/2020 | 01/14/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 01/09/2020 | 01/09/2020 |
| Note: Held By: AMOBLEY Another for of articulation required in the front Landscape plan must specify sod type and if irrigation will be installed Landscape plan must show AC pad and that it will be screened with 7 gallon shrubs Must have a minimum of 16 foundation plantings with at least eight along the front and four along each side |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| STORMWATER REINSPECTION FEE | ¤40.00 | 05/26/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 05/26/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 05/26/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 05/26/2021 |
| REINSPECTION FEE | ¤40.00 | 05/26/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤380.00 | 06/18/2020 |
| SITE PLAN 20 | ¤20.00 | 06/18/2020 |
| SURCHARGE FS 533.721 | ¤9.42 | 06/18/2020 |
| SURCHARGE - FS 468.631 | ¤14.13 | 06/18/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/18/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 06/18/2020 |
| SEWER INSPECTION | ¤25.00 | 06/18/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 06/18/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 06/18/2020 |
| METER - DEPOSIT | ¤60.00 | 06/18/2020 |
| WATER- TURN ON | ¤25.00 | 06/18/2020 |
| ADMIN FEE | ¤20.00 | 06/18/2020 |
| CONNECTION FEES | ¤1,002.88 | 06/18/2020 |
| ELECTRIC FEE | ¤174.00 | 06/18/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 06/18/2020 |
| IMPACT FEE FIRE | ¤223.38 | 06/18/2020 |
| IMPACT FEE PARKS | ¤849.24 | 06/18/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/18/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 06/18/2020 |
| MECHANICAL FEE | ¤174.00 | 06/18/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/18/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 06/18/2020 |
| PLAN CHECK FEE | ¤76.00 | 06/18/2020 |
| PLUMBING FEE | ¤174.00 | 06/18/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,693.90 |