I want to search for...
Permit #2020010278
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7007-00280-0110 |
| CONDITIONED SPACE: 1822 sqft |
| GARAGE: 574 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| OPENED PORCH (WITH ROOF) : 354 sqft |
| Total Square Footage: 2798 sqft |
| Block: 00280 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: (386)445-9393 |
| Location Address: 65 FRANCIS LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/24/2020 |
| NOC: RECORDED |
| Applicant name: ANTONIO JR AMARAL |
| Owner: DAMATA, MANUEL |
|
Address TRUSTEE PALM COAST, FL 32137 |
|
Address 16 CONWAY COURT PALM COAST, FL 32137 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤212,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
AMARAL HOMES & POOLS, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
13 Utility Drive PALM COAST, FL 32137 |
CBC058062 (Exp: 08/31/2026) | (386)445-9393 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
ANTONIO AMARAL JR
| Status | Location Address | State License Number |
| ACTIVE |
1370 PALM HARBOR PKWY PALM COAST, FL 32137 |
CCC058004 (Exp: 08/31/2026) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/26/2020 | FINAL APPROVED | JBODEN |
| Note: THIS IS A REINSPECTION ) TEST CAPS ON FUTURE DWV…. P3005.1.5 PROVISIONS FOR FUTURE FIXTURES. REPLACE TEST CAPS WITH PERMANENT PLUG OR CAP FITTING (SCHEDULE 40) (NOT A TEST CAP) | |||
| BLD - BUILDING FINAL | 10/23/2020 | Disapproved - NO FEE | WMILLER |
| Note: ) TEST CAPS ON FUTURE DWV…. P3005.1.5 PROVISIONS FOR FUTURE FIXTURES. REPLACE TEST CAPS WITH PERMANENT PLUG OR CAP FITTING (SCHEDULE 40) (NOT A TEST CAP) | |||
| U -UTILITY RESIDENTIAL FINAL | 10/23/2020 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 10/21/2020 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 10/21/2020 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/12/2020 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 10/12/2020 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 08/19/2020 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION 8/19/20 - REMOVE THE FEW ORGANIC ROOTS STICKING UP ON THE LEFT SIDE OF THE CIRCULAR APRON. HEAVY RAIN IN THE FORECAST. BUILDER SHOULD DOUBLE CHECK ELEVATIONS BEFORE POURING. AFTER THAT READY TO POUR | |||
| U - SEWER TIE IN | 08/12/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 08/12/2020 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 08/12/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 12:05 | |||
| U-CROSS CONNECTION | 08/12/2020 | APPROVED - AS NOTED | JHARDING |
| Note: Approved. No cross connections | |||
| ROW- PRE-APRON (PRE-POUR) | 08/07/2020 | CANCELLED BY APPLICANT | RGROSS |
| LATH/BRICK/ WATER BARRIER | 05/22/2020 | APPROVED | JDELBONIS |
| INSULATION | 05/14/2020 | APPROVED | JDELBONIS |
| ALL ROUGH | 05/07/2020 | APPROVED | JDELBONIS |
| ROOF VALLEY & METAL | 04/24/2020 | APPROVED | JDELBONIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/21/2020 | APPROVED - AS NOTED | JDELBONIS |
| Note: roof sheathing only | |||
| TIE BEAM / LINTEL | 03/27/2020 | APPROVED | JDELBONIS |
| FOUND SURVEY APPROVED (OFFICE) | 03/26/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/06/2020 | APPROVED | JDELBONIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/02/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 02/28/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/25/2020 | 03/26/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 01/17/2020 | 01/17/2020 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 01/17/2020 | 01/18/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 01/17/2020 | 01/23/2020 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 01/17/2020 | 01/23/2020 |
| Note: Released By: AHALL | |||
| SWALE | COMPLETE | 01/13/2020 | 02/07/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 01/10/2020 | 01/14/2020 |
| Note: Held By: JPI 1. Please add the label for a Vacuum Breaker on the hose bib. (R2902.4) 2. Provide safety device at water heater (tap and thermal expansion device). Add note. P607.3 3. On the product approval listing. Please list panel wall components (siding, soffits, e.g.) and structural components. 4. In future submittals, please provide the truss layout sheet on a unique sheet. 5. Add label with note at garage walls. R302.5.2 Duct penetration. Ducts in the garage and ducts penetrating the walls or ceilings separating the dwelling from the garage shall be constructed of a minimum No. 26 gage (0.48 mm) sheet steel, 1 inch (25.4 mm) minimum rigid nonmetallic Class 0 or Class 1 duct board, or other approved material and shall not have openings into the garage. | |||
| CUSVC | COMPLETE | 01/10/2020 | 01/14/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 01/10/2020 | 01/13/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 01/10/2020 | 01/13/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 01/10/2020 | 01/14/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 01/10/2020 | 01/13/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 01/10/2020 | 01/14/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 01/10/2020 | 01/10/2020 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 01/10/2020 | 01/14/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 01/10/2020 | 01/10/2020 |
| Note: Held By: AMOBLEY Flood information incorrect on survey Please complete color sheet for review. Provide LRV's for colors being used and color of tile roof Right side of home facing a public right of way-Windows must have banding Please show setback from arc of circular driveway to property line. Must be at least 5ft Lot requires a total of 6 trees On landscape plan please specify tree and shrub types for review |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| TRANSPORTATION IMPACT FEE | ¤40.74 | 10/29/2020 |
| TRANSPORTATION IMPACT FEE | ¤1,632.00 | 01/24/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 01/24/2020 |
| SEWER CREDIT | (¤1,923.85) | 01/24/2020 |
| SEWER INSPECTION | ¤25.00 | 01/24/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 01/24/2020 |
| WATER CREDIT | (¤41.19) | 01/24/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 01/24/2020 |
| METER - DEPOSIT | ¤60.00 | 01/24/2020 |
| WATER- TURN ON | ¤25.00 | 01/24/2020 |
| ADMIN FEE | ¤20.00 | 01/24/2020 |
| CONNECTION FEES | ¤1,002.88 | 01/24/2020 |
| ELECTRIC FEE | ¤205.20 | 01/24/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 01/24/2020 |
| IMPACT FEE FIRE | ¤223.38 | 01/24/2020 |
| IMPACT FEE PARKS | ¤849.24 | 01/24/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/24/2020 |
| MECHANICAL FEE | ¤205.20 | 01/24/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/24/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/24/2020 |
| PLAN CHECK FEE | ¤96.80 | 01/24/2020 |
| PLUMBING FEE | ¤205.20 | 01/24/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤484.00 | 01/24/2020 |
| SITE PLAN 20 | ¤20.00 | 01/24/2020 |
| SURCHARGE FS 533.721 | ¤11.40 | 01/24/2020 |
| SURCHARGE - FS 468.631 | ¤17.09 | 01/24/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/24/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,752.20 |