I want to search for...

Permit #2020010278

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7007-00280-0110
CONDITIONED SPACE: 1822 sqft
GARAGE: 574 sqft
OPENED PORCH (WITH ROOF) : 48 sqft
OPENED PORCH (WITH ROOF) : 354 sqft
Total Square Footage: 2798 sqft
Block: 00280
Subdivision: 2185 - SECTION 7-FLORIDA PARK
Job Phone: (386)445-9393
Location Address: 65 FRANCIS LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/24/2020
NOC: RECORDED
Applicant name: ANTONIO JR AMARAL
Owner: DAMATA, MANUEL

Address

TRUSTEE

PALM COAST, FL 32137

Address

16 CONWAY COURT

PALM COAST, FL 32137

Lot: 0110
Contracted Stated Job Value: ¤212,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

AMARAL HOMES & POOLS, LLC
Status Location Address State License Number Phone
ACTIVE

13 Utility Drive

PALM COAST, FL 32137

CBC058062 (Exp: 08/31/2026) (386)445-9393

Sub Contractors

RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
ANTONIO AMARAL JR
Status Location Address State License Number
ACTIVE

1370 PALM HARBOR PKWY

PALM COAST, FL 32137

CCC058004 (Exp: 08/31/2026)

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/26/2020 FINAL APPROVED JBODEN
Note: THIS IS A REINSPECTION ) TEST CAPS ON FUTURE DWV…. P3005.1.5 PROVISIONS FOR FUTURE FIXTURES. REPLACE TEST CAPS WITH PERMANENT PLUG OR CAP FITTING (SCHEDULE 40) (NOT A TEST CAP)
BLD - BUILDING FINAL 10/23/2020 Disapproved - NO FEE WMILLER
Note: ) TEST CAPS ON FUTURE DWV…. P3005.1.5 PROVISIONS FOR FUTURE FIXTURES. REPLACE TEST CAPS WITH PERMANENT PLUG OR CAP FITTING (SCHEDULE 40) (NOT A TEST CAP)
U -UTILITY RESIDENTIAL FINAL 10/23/2020 FINAL APPROVED JHARDING
ROW - STORMWATER FINAL 10/21/2020 APPROVED RGROSS
ROW - FINAL APRON (AFTER POUR) 10/21/2020 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 10/12/2020 APPROVED RGROSS
FINAL SURVEY (OFFICE USE ONLY) 10/12/2020 APPROVED RGROSS
ROW- PRE-APRON (PRE-POUR) 08/19/2020 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION 8/19/20 - REMOVE THE FEW ORGANIC ROOTS STICKING UP ON THE LEFT SIDE OF THE CIRCULAR APRON. HEAVY RAIN IN THE FORECAST. BUILDER SHOULD DOUBLE CHECK ELEVATIONS BEFORE POURING. AFTER THAT READY TO POUR
U - SEWER TIE IN 08/12/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 08/12/2020 APPROVED JGIBSON
ELECTRIC - EARLY POWER 08/12/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 12:05
U-CROSS CONNECTION 08/12/2020 APPROVED - AS NOTED JHARDING
Note: Approved. No cross connections
ROW- PRE-APRON (PRE-POUR) 08/07/2020 CANCELLED BY APPLICANT RGROSS
LATH/BRICK/ WATER BARRIER 05/22/2020 APPROVED JDELBONIS
INSULATION 05/14/2020 APPROVED JDELBONIS
ALL ROUGH 05/07/2020 APPROVED JDELBONIS
ROOF VALLEY & METAL 04/24/2020 APPROVED JDELBONIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/21/2020 APPROVED - AS NOTED JDELBONIS
Note: roof sheathing only
TIE BEAM / LINTEL 03/27/2020 APPROVED JDELBONIS
FOUND SURVEY APPROVED (OFFICE) 03/26/2020 APPROVED TBAKER
MONOLITHIC SLAB 03/06/2020 APPROVED JDELBONIS
PLUMBING 1ST ROUGH UNDERGROUND 03/02/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 02/28/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 03/25/2020 03/26/2020
Note: Released By: TBAKER
ZON COMPLETE 01/17/2020 01/17/2020
Note: Released By: AMOBLEY
BLD COMPLETE 01/17/2020 01/18/2020
Note: Released By: JPI
SW1 COMPLETE 01/17/2020 01/23/2020
Note: Released By: CTROHA
UD1 COMPLETE 01/17/2020 01/23/2020
Note: Released By: AHALL
SWALE COMPLETE 01/13/2020 02/07/2020
Note: Released By: TBAKER
BLD HOLD 01/10/2020 01/14/2020
Note: Held By: JPI 1. Please add the label for a Vacuum Breaker on the hose bib. (R2902.4) 2. Provide safety device at water heater (tap and thermal expansion device). Add note. P607.3 3. On the product approval listing. Please list panel wall components (siding, soffits, e.g.) and structural components. 4. In future submittals, please provide the truss layout sheet on a unique sheet. 5. Add label with note at garage walls. R302.5.2 Duct penetration. Ducts in the garage and ducts penetrating the walls or ceilings separating the dwelling from the garage shall be constructed of a minimum No. 26 gage (0.48 mm) sheet steel, 1 inch (25.4 mm) minimum rigid nonmetallic Class 0 or Class 1 duct board, or other approved material and shall not have openings into the garage.
CUSVC COMPLETE 01/10/2020 01/14/2020
Note: Released By: HHAND
ELEC COMPLETE 01/10/2020 01/13/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 01/10/2020 01/13/2020
Note: Released By: TBAKER
LOCATE COMPLETE 01/10/2020 01/14/2020
Note: Released By: CSTONE
MECH COMPLETE 01/10/2020 01/13/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 01/10/2020 01/14/2020
Note: Released By: JPI
SW1 COMPLETE 01/10/2020 01/10/2020
Note: Released By: CTROHA
UD1 COMPLETE 01/10/2020 01/14/2020
Note: Released By: AHALL
ZON HOLD 01/10/2020 01/10/2020
Note: Held By: AMOBLEY Flood information incorrect on survey Please complete color sheet for review. Provide LRV's for colors being used and color of tile roof Right side of home facing a public right of way-Windows must have banding Please show setback from arc of circular driveway to property line. Must be at least 5ft Lot requires a total of 6 trees On landscape plan please specify tree and shrub types for review

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
TRANSPORTATION IMPACT FEE ¤40.74 10/29/2020
TRANSPORTATION IMPACT FEE ¤1,632.00 01/24/2020
3% TRANS IMPACT FEE CREDIT (¤48.96) 01/24/2020
SEWER CREDIT (¤1,923.85) 01/24/2020
SEWER INSPECTION ¤25.00 01/24/2020
SEWER CAPITAL FACILITY ¤4,596.07 01/24/2020
WATER CREDIT (¤41.19) 01/24/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 01/24/2020
METER - DEPOSIT ¤60.00 01/24/2020
WATER- TURN ON ¤25.00 01/24/2020
ADMIN FEE ¤20.00 01/24/2020
CONNECTION FEES ¤1,002.88 01/24/2020
ELECTRIC FEE ¤205.20 01/24/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 01/24/2020
IMPACT FEE FIRE ¤223.38 01/24/2020
IMPACT FEE PARKS ¤849.24 01/24/2020
IMPACT FEE SCHOOL ¤3,600.00 01/24/2020
MECHANICAL FEE ¤205.20 01/24/2020
WATER -IRRIGATION INSPECTION ¤25.00 01/24/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 01/24/2020
PLAN CHECK FEE ¤96.80 01/24/2020
PLUMBING FEE ¤205.20 01/24/2020
NEW RESIDENTIAL INSPECTIONS ¤484.00 01/24/2020
SITE PLAN 20 ¤20.00 01/24/2020
SURCHARGE FS 533.721 ¤11.40 01/24/2020
SURCHARGE - FS 468.631 ¤17.09 01/24/2020
STORM WATER PERMIT FEES ¤80.00 01/24/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,752.20