I want to search for...

Permit #2020010434

Permit Details

Status: COED

Parcel Id: 29-10-31-5540-00000-0620
CONDITIONED SPACE: 3342 sqft
CONDITIONED SPACE: 3368 sqft
GARAGE: 1035 sqft
OPENED PORCH (WITH ROOF) : 508 sqft
OPENED PORCH (WITH ROOF) : 508 sqft
OPENED PORCH (WITH ROOF) : 107 sqft
Total Square Footage: 8868 sqft
Block: 00000
Subdivision: 1005 - SANCTUARY SUBDIVISION
Job Phone: (386)445-9393
Location Address: 18 SABAL BEND
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/25/2020
NOC: RECORDED
Applicant name: ANTONIO JR AMARAL
Owner: AMARAL ANTONIO A & MARIA A H&W

Address

13 UTILITY DRIVE

PALM COAST, FL 32137

Address

LIFE ESTATE

PALM COAST, FL 32137

Lot: 0620
Contracted Stated Job Value: ¤500,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

AMARAL HOMES & POOLS, LLC
Status Location Address State License Number Phone
ACTIVE

13 Utility Drive

PALM COAST, FL 32137

CBC058062 (Exp: 08/31/2026) (386)445-9393

Sub Contractors

ANTONIO AMARAL JR
Status Location Address State License Number
ACTIVE

1370 PALM HARBOR PKWY

PALM COAST, FL 32137

CCC058004 (Exp: 08/31/2026)
RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/02/2021 FINAL APPROVED WMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. MODEL NUMBERS ON ENERGY CALCS 403.6.1 MODEL NUMBERS NOT MATCHING MODEL NUMBER ON UNIT/UNITS... NEED TO OBTAIN APPROVED REVISION OR PLACE APPROVED 2. missing covers on light boxes 3. missing covers on electric boxes 4. GFCI outlets not working (check all) 5. 105.11 Notice of termite protection. A permanent sign which identifies the termite treatment provider and need for reinspection and treatment contract renewal shall be provided. The sign shall be posted near the water heater or electric panel. 6. toilet not working in Jack and Jill bath upstairs 7. low water pressure sink upstairs 8. electric box not mounted (hanging out wall) holes in wall under stairs need to be sealed (access from garage) 9. no power at garbage disposal 10. need to check breakers on a/c and heat units after revision ADDED... need schedule 40 caps at sommer futer plumbing for summer kitchen
BLD - BUILDING FINAL 07/23/2021 Disapproved -FEE REQUIRED WMILLER
Note: 1. MODEL NUMBERS ON ENERGY CALCS 403.6.1 MODEL NUMBERS NOT MATCHING MODEL NUMBER ON UNIT/UNITS... NEED TO OBTAIN APPROVED REVISION OR PLACE APPROVED 2. missing covers on light boxes 3. missing covers on electric boxes 4. GFCI outlets not working (check all) 5. 105.11 Notice of termite protection. A permanent sign which identifies the termite treatment provider and need for reinspection and treatment contract renewal shall be provided. The sign shall be posted near the water heater or electric panel. 6. toilet not working in Jack and Jill bath upstairs 7. low water pressure sink upstairs 8. electric box not mounted (hanging out wall) holes in wall under stairs need to be sealed (access from garage) 9. no power at garbage disposal 10. need to check breakers on a/c and heat units after revision
BLD - BUILDING FINAL 07/23/2021 Disapproved - NO FEE WMILLER
Note: THIS IS A REINSPECTION 1. MODEL NUMBERS ON ENERGY CALCS 403.6.1 MODEL NUMBERS NOT MATCHING MODEL NUMBER ON UNIT/UNITS... NEED TO OBTAIN APPROVED REVISION OR PLACE APPROVED 2. missing covers on light boxes 3. missing covers on electric boxes 4. GFCI outlets not working (check all) 5. 105.11 Notice of termite protection. A permanent sign which identifies the termite treatment provider and need for reinspection and treatment contract renewal shall be provided. The sign shall be posted near the water heater or electric panel. 6. toilet not working in Jack and Jill bath upstairs 7. low water pressure sink upstairs 8. electric box not mounted (hanging out wall) holes in wall under stairs need to be sealed (access from garage) 9. no power at garbage disposal 10. need to check breakers on a/c and heat units after revision ADDED... need schedule 40 caps at sommer futer plumbing for summer kitchen
ROW - FINAL APRON (AFTER POUR) 07/22/2021 APPROVED KRUTH
ROW - STORMWATER FINAL 07/22/2021 APPROVED KRUTH
U -UTILITY RESIDENTIAL FINAL 07/22/2021 FINAL APPROVED DHANEY
ROW- PAVER RESTRAINTS 07/12/2021 APPROVED KRUTH
ROW FIELD SURVEY /GRADING CERTIFICATION 07/12/2021 APPROVED KRUTH
U-CROSS CONNECTION 07/12/2021 APPROVED DHANEY
ROW- PRE-APRON (PRE-POUR) 07/12/2021 APPROVED - AS NOTED KRUTH
Note: THIS IS A REINSPECTION APPROVED FOR CONCRETE APRON ONLY. PAVER RESTRAINT NOT COMPLETED YET. completed
ROW- PAVER RESTRAINTS 07/09/2021 CANCELLED BY APPLICANT WEB
FINAL SURVEY (OFFICE USE ONLY) 07/09/2021 APPROVED GBERTOLA
ROW- PAVER RESTRAINTS 02/05/2021 APPROVED RGROSS
Note: READY TO POUR.
ROW- PRE-APRON (PRE-POUR) 02/04/2021 PARTIALLY APPROVED RGROSS
Note: APPROVED FOR CONCRETE APRON ONLY. PAVER RESTRAINT NOT COMPLETED YET.
ELECTRIC - EARLY POWER 01/28/2021 APPROVED - AS NOTED JMUNSON
Note: 1. Emailed FPL at 10:37 am 2. Need to submit revision for service upgrade by final
ELECTRIC - EARLY POWER 01/27/2021 Disapproved - NO FEE JMUNSON
Note: 1. Need to change 150 amp breaker to a 200 amp breaker. 2. Need to send in revision by final upgrading service to a 400 amp. Plans called for a 300 amp.
INSULATION 11/06/2020 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION
INSULATION 11/03/2020 CANCELLED BY APPLICANT WMILLER
GRAVITY SEWER TEST 11/02/2020 APPROVED MMESSER
U - SEWER TIE IN 11/02/2020 APPROVED MMESSER
ALL ROUGH 10/28/2020 APPROVED - AS NOTED TSTAUFFACHER
Note: Front door is back ordered. Should be in by insulation inspection. THIS IS A REINSPECTION Per Tony
ALL ROUGH 10/16/2020 CANCELLED BY APPLICANT WMILLER
Note: Per Tony
LATH/BRICK/ WATER BARRIER 10/06/2020 APPROVED MMESSER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/19/2020 APPROVED FWILLIS
Note: THIS IS A REINSPECTION Need only the roof sheathing part of inspection so that I can proceed with applying 1x2s for tile roof ROOF SHEATHING ONLY!! STILL NEED BRACES,TIES AND DOWN CELL.
ROOF VALLEY & METAL 07/24/2020 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/24/2020 PARTIALLY APPROVED FWILLIS
Note: Need only the roof sheathing part of inspection so that I can proceed with applying 1x2s for tile roof ROOF SHEATHING ONLY!! STILL NEED BRACES,TIES AND DOWN CELL.
WALL SHEATHING 07/14/2020 APPROVED MMESSER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/14/2020 CANCELLED BY APPLICANT MMESSER
Note: Please call Tony @ 386-931-4670 prior to going to the property. Thanks!
TIE BEAM / LINTEL 05/22/2020 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 05/14/2020 APPROVED TBAKER
MONOLITHIC SLAB 04/29/2020 APPROVED JDELBONIS
PLUMBING 1ST ROUGH UNDERGROUND 04/24/2020 APPROVED JDELBONIS
WATER METER INSTALLATION REQUEST 04/08/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 07/28/2021 07/28/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN HOLD 07/27/2021 07/27/2021
Note: Held By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM PLEASE RENAME THE FILE NAME TO SAY ENERGY CALCUS
BADMIN COMPLETE 07/27/2021 07/27/2021
Note: Released By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM
ELEC COMPLETE 06/28/2021 06/29/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 10/02/2020 10/09/2020
Note: Released By: PBUCKLEY
ELEC COMPLETE 10/02/2020 10/05/2020
Note: Released By: JMUNSON
PLUM COMPLETE 10/02/2020 10/09/2020
Note: Released By: PBUCKLEY
ZON COMPLETE 05/13/2020 05/13/2020
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 05/13/2020 05/14/2020
Note: Released By: TBAKER
ZON COMPLETE 03/23/2020 03/23/2020
Note: Released By: AMOBLEY
PLENV HOLD 03/19/2020 03/19/2020
Note: Held By: JMYERS The After Action Report has not been supplied for review. Please upload a copy of the report into the permitting portal for review.
ZON HOLD 03/19/2020 03/20/2020
Note: Held By: ELENS Repeat Comment: Please provide driveway widths at garage doors on both sides of the garage. (The last submittal has the driveway width of the garage door on the left side of the residence. Please provide the driveway width at the garage doors on the right side to demonstrate that it does not exceed the maximum width.)
UD1 COMPLETE 03/19/2020 03/24/2020
Note: Released By: LFITZGERALD
ENGIN1 COMPLETE 03/19/2020 03/24/2020
Note: Released By: TBAKER
SW1 COMPLETE 03/19/2020 03/20/2020
Note: Released By: CTROHA
PLENV COMPLETE 03/19/2020 03/19/2020
Note: Released By: JMYERS The After Action Report has been accepted.
PLENV HOLD 02/26/2020 02/26/2020
Note: Held By: JMYERS Comments not addressed. After Action Report must be submitted to show that the Gopher Tortoise has been successfully relocated.
ELEC COMPLETE 02/26/2020 02/28/2020
Note: Released By: JMUNSON
ZON HOLD 02/26/2020 02/27/2020
Note: Held By: AMOBLEY REPEAT COMMENT... Please provide driveway widths at garage doors on both sides of the garage on site plan
PLUM COMPLETE 02/26/2020 02/27/2020
Note: Released By: JPI
PLENV HOLD 02/18/2020 02/18/2020
Note: Held By: JMYERS The document submitted is a permit for the relocation of Gopher Tortoise. However, the hold cannot be removed until an After Action Report is submitted showing that the Gopher Tortoise has been successfully relocated.
ZON HOLD 02/18/2020 02/19/2020
Note: Held By: ELENS Please provide driveway widths at garage doors on both sides of the garage.
ELEC HOLD 02/18/2020 02/18/2020
Note: Held By: JMUNSON Need Load Calcs for the house. The Riser diagram needs to include the transfer switch and disconnect for the generator.
BLD COMPLETE 02/18/2020 02/20/2020
Note: Released By: JPI
PLUM HOLD 02/18/2020 02/20/2020
Note: Held By: JPI 1) Please show the exterior cleanout location and label the sewer pipe size. The diagram does not show the sewer. Typical legend for the c/o is a circle at the cleanout location.
PLFM COMPLETE 01/16/2020 01/16/2020
Note: Released By: JMYERS Based on the Site Plan submitted 1/15/2020, the structure will be outside of the SFHA. No elevation certificates will be required.
BLD HOLD 01/15/2020 01/16/2020
Note: Held By: JPI 1. Please add the label for a Vacuum Breaker on the hose bib. (R2902.4) 2. Provide safety device at water heater (tap and thermal expansion device). Add note. P607.3 3. On the product approval listing. Please list panel wall components (siding, soffits, e.g.) and structural components. 4. Add label with note at garage walls. R302.5.2 Duct penetration. Ducts in the garage and ducts penetrating the walls or ceilings separating the dwelling from the garage shall be constructed of a minimum No. 26 gage (0.48 mm) sheet steel, 1 inch (25.4 mm) minimum rigid nonmetallic Class 0 or Class 1 duct board, or other approved material and shall not have openings into the garage. 5. On the General Structural Notes on Sheet GN.pdf. The current version reference for the FBC should be the 6th edition. 6. Please provide the design wind speed for the project. Based on the ASCE 7 Hazard Tool, the minimum speed recommended is 133mph. If this is already located within the plans, then please respond to this comment with its location.
CUSVC COMPLETE 01/15/2020 01/17/2020
Note: Released By: HHAND
ELEC HOLD 01/15/2020 01/16/2020
Note: Held By: JMUNSON Need Electrical Load Calculations. Need Riser Diagram and specs on the generator.
ENGIN1 COMPLETE 01/15/2020 01/16/2020
Note: Released By: TBAKER
LOCATE COMPLETE 01/15/2020 01/16/2020
Note: Released By: CSTONE
MECH COMPLETE 01/15/2020 01/16/2020
Note: Released By: CPISCITELLI
PLUM HOLD 01/15/2020 01/16/2020
Note: Held By: JPI 1) We could not locate the riser diagram in the submittal. We did see the General Notes, however, did not see the riser diagram. The review will continue after locating the riser diagram.
SW1 COMPLETE 01/15/2020 01/16/2020
Note: Released By: CTROHA
UD1 COMPLETE 01/15/2020 01/21/2020
Note: Released By: AHALL
ZON HOLD 01/15/2020 01/15/2020
Note: Held By: ELENS Site plan footprint does not match floor plan or landscape plan. Floor plan states multiple driveways. Please clarify.
PLENV HOLD 01/15/2020 01/15/2020
Note: Held By: JMYERS Gopher Tortoise have been noted in the vicinity of this project. Please provide a Gopher Tortoise survey done by a Qualified Environmental Professional that no Gopher Tortoise or their burrows are within 25ft of construction activities.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 08/02/2021
NEW RESIDENTIAL INSPECTIONS ¤1,662.00 03/25/2020
SITE PLAN 20 ¤20.00 03/25/2020
SURCHARGE FS 533.721 ¤33.78 03/25/2020
SURCHARGE - FS 468.631 ¤50.67 03/25/2020
STORM WATER PERMIT FEES ¤80.00 03/25/2020
3% TRANS IMPACT FEE CREDIT (¤91.77) 03/25/2020
SEWER INSPECTION ¤25.00 03/25/2020
SEWER CAPITAL FACILITY ¤4,596.07 03/25/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 03/25/2020
METER - DEPOSIT ¤60.00 03/25/2020
METER - DEPOSIT ¤60.00 03/25/2020
WATER-METER ¤434.59 03/25/2020
WATER-METER ¤434.59 03/25/2020
WATER- TURN ON ¤25.00 03/25/2020
ADMIN FEE ¤20.00 03/25/2020
CONNECTION FEES ¤25.00 03/25/2020
ELECTRIC FEE ¤558.60 03/25/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 03/25/2020
IMPACT FEE FIRE ¤223.38 03/25/2020
IMPACT FEE PARKS ¤849.24 03/25/2020
IMPACT FEE SCHOOL ¤3,600.00 03/25/2020
IMPACT FEE TRANSPORTATION ¤3,059.00 03/25/2020
MECHANICAL FEE ¤558.60 03/25/2020
WATER -IRRIGATION INSPECTION ¤25.00 03/25/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 03/25/2020
PLAN CHECK FEE ¤332.40 03/25/2020
PLUMBING FEE ¤558.60 03/25/2020
Fees Total Due: ¤0.00 Total Paid: ¤20,581.75