Permit #2020010473
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00660-0360 |
| CONDITIONED SPACE: 1628 sqft |
| OPENED PORCH (WITH ROOF) : 316 sqft |
| OPENED PORCH (WITH ROOF) : 67 sqft |
| GARAGE: 496 sqft |
| Total Square Footage: 2507 sqft |
| Block: 00660 |
| Subdivision: 2153 - SECTION 26-PINE GROVE |
| Job Phone: 386-447-4151 |
| Location Address: 55 PIN OAK DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/31/2020 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: ROBERT, VERA M |
|
Address 10511 WILLOW PARK VW HOUSTON, TX 77070 |
| Lot: 0360 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
ERIC FRANCO
| Status | Location Address | State License Number | Phone |
| CANCEL |
840 DELTONA BLVD SUITE F-2 SANFORD, FL 32771 |
CCC1327280 (Exp: 08/31/2022) | 386-575-4007 |
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
GREGG A MCANALLY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE PALM COAST, FL 32092 |
CAC1815760 (Exp: 08/31/2022) | 904-829-8898 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/20/2021 | FINAL APPROVED | MMESSER |
| U-CROSS CONNECTION | 01/15/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -potabale irrigation now with PVB installed THIS IS A REINSPECTION A Pressure vaume breaker(PVB) not an atmosphere vacume breaker needs to be installed for the irrigation of potable water | |||
| U -UTILITY RESIDENTIAL FINAL | 01/15/2021 | FINAL APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION water meter assembly required to be rotated back to original alignment which was installed straight | |||
| U -UTILITY RESIDENTIAL FINAL | 01/07/2021 | Disapproved - NO FEE | LFITZGERALD |
| Note: water meter assembly required to be rotated back to original alignment which was installed straight | |||
| U-CROSS CONNECTION | 01/07/2021 | CANCELLED BY APPLICANT | LFITZGERALD |
| U-CROSS CONNECTION | 01/07/2021 | Disapproved - NO FEE | LFITZGERALD |
| Note: THIS IS A REINSPECTION A Pressure vaume breaker(PVB) not an atmosphere vacume breaker needs to be installed for the irrigation of potable water | |||
| ROW - FINAL APRON (AFTER POUR) | 01/06/2021 | APPROVED | KRUTH |
| Note: CULVERT PIPE IS GOOD | |||
| ROW - STORMWATER FINAL | 01/06/2021 | APPROVED | KRUTH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/05/2021 | APPROVED | GBERTOLA |
| FINAL SURVEY (OFFICE USE ONLY) | 01/05/2021 | APPROVED | GBERTOLA |
| ELECTRIC - EARLY POWER | 10/27/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 9:45 | |||
| ROW- PRE-APRON (PRE-POUR) | 10/07/2020 | APPROVED - AS NOTED | KHOWELL |
| Note: THIS IS A REINSPECTION * BENCH MARK ON SWALE PLAN DOES NOT MATCH SITE PLAN, SHOULD HAVE CALLED TIM BAKER AT THE CITY. SITE PLAN 25.95 THE SWALE PLAN SHOWS 25.85 WHICH IS WRONG BY NOT VERIFING BRENCH MARKS MATCH HAS CAUSED THE CULVERT PIPE TO BE OUT OF TOLERANCE. * REMOVE ASPHALT FROM APRON AND DIG APRON OUT AT THE ROAD TO A MINIMUM OF 5" AND COMPACT SOIL | |||
| ROW- PRE-APRON (PRE-POUR) | 09/30/2020 | Disapproved - NO FEE | KHOWELL |
| Note: * BENCH MARK ON SWALE PLAN DOES NOT MATCH SITE PLAN, SHOULD HAVE CALLED TIM BAKER AT THE CITY. SITE PLAN 25.95 THE SWALE PLAN SHOWS 25.85 WHICH IS WRONG BY NOT VERIFING BRENCH MARKS MATCH HAS CAUSED THE CULVERT PIPE TO BE OUT OF TOLERANCE. * REMOVE ASPHALT FROM APRON AND DIG APRON OUT AT THE ROAD TO A MINIMUM OF 5" AND COMPACT SOIL | |||
| U - SEWER TIE IN | 09/23/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 09/23/2020 | APPROVED | JGIBSON |
| PEP TANK INSTALLATION REQUEST | 08/17/2020 | APPROVED | CSTONE |
| INSULATION | 07/27/2020 | APPROVED | JBODEN |
| LATH/BRICK/ WATER BARRIER | 07/27/2020 | APPROVED | JBODEN |
| ALL ROUGH | 07/16/2020 | APPROVED | MMESSER |
| ROOF VALLEY & METAL | 06/18/2020 | APPROVED | MMESSER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/17/2020 | APPROVED | MMESSER |
| ROOF SHEATHING | 06/12/2020 | APPROVED | MMESSER |
| FOUND SURVEY APPROVED (OFFICE) | 05/19/2020 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 05/19/2020 | APPROVED | MMESSER |
| MONOLITHIC SLAB | 05/12/2020 | APPROVED | MMESSER |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/04/2020 | APPROVED | JGIBSON |
| ELECTRIC TEMP POLE | 04/17/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 11:35 | |||
| WATER METER INSTALLATION REQUEST | 04/17/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 08/17/2020 | 08/17/2020 |
| Note: Released By: AMOBLEY | |||
| ZON | COMPLETE | 05/18/2020 | 05/18/2020 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 05/18/2020 | 05/19/2020 |
| Note: Released By: TBAKER | |||
| PLENV | COMPLETE | 03/31/2020 | 03/31/2020 |
| Note: Released By: JMYERS The After Action Report from FWC has been accepted. | |||
| PLENV | HOLD | 02/11/2020 | 02/12/2020 |
| Note: Held By: JMYERS Per FWC Officer, Gopher Tortoise burrow was impacted during clearing. Please provide permit from FWC that this has been remedied prior to continuing construction activities. | |||
| ZON | COMPLETE | 01/29/2020 | 01/30/2020 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 01/29/2020 | 01/30/2020 |
| Note: Released By: JPI | |||
| SWALE | COMPLETE | 01/21/2020 | 02/10/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 01/15/2020 | 01/17/2020 |
| Note: Held By: JPI 1. Please provide product approval information for panel wall items and also wood connectors and wood anchors, on the product approval sheet. 2. Please add the label for a Vacuum Breaker on the hose bib. (R2902.4) | |||
| CUSVC | COMPLETE | 01/15/2020 | 01/16/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 01/15/2020 | 01/17/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 01/15/2020 | 01/21/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 01/15/2020 | 01/16/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 01/15/2020 | 01/16/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 01/15/2020 | 01/17/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 01/15/2020 | 01/16/2020 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 01/15/2020 | 01/21/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 01/15/2020 | 01/16/2020 |
| Note: Held By: AMOBLEY Exterior color does not meet the definition of an earth tone and does not meet the LRV |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 01/20/2021 |
| TRANSPORTATION IMPACT FEE | ¤40.74 | 05/28/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 05/28/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 01/31/2020 |
| SEWER CREDIT | (¤1,466.00) | 01/31/2020 |
| SEWER INSPECTION | ¤25.00 | 01/31/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 01/31/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 01/31/2020 |
| METER - DEPOSIT | ¤60.00 | 01/31/2020 |
| WATER- TURN ON | ¤25.00 | 01/31/2020 |
| ADMIN FEE | ¤20.00 | 01/31/2020 |
| CONNECTION FEES | ¤1,002.88 | 01/31/2020 |
| ELECTRIC FEE | ¤190.20 | 01/31/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 01/31/2020 |
| IMPACT FEE FIRE | ¤223.38 | 01/31/2020 |
| IMPACT FEE PARKS | ¤849.24 | 01/31/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/31/2020 |
| MECHANICAL FEE | ¤190.20 | 01/31/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/31/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/31/2020 |
| PLAN CHECK FEE | ¤86.80 | 01/31/2020 |
| PLUMBING FEE | ¤190.20 | 01/31/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤434.00 | 01/31/2020 |
| SITE PLAN 20 | ¤20.00 | 01/31/2020 |
| SURCHARGE FS 533.721 | ¤10.45 | 01/31/2020 |
| SURCHARGE - FS 468.631 | ¤15.67 | 01/31/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/31/2020 |
| TRANSPORTATION IMPACT FEE | ¤1,632.00 | 01/31/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,223.87 |