Permit #2020010473

Permit Details

Status: COED

Parcel Id: 07-11-31-7026-00660-0360
CONDITIONED SPACE: 1628 sqft
OPENED PORCH (WITH ROOF) : 316 sqft
OPENED PORCH (WITH ROOF) : 67 sqft
GARAGE: 496 sqft
Total Square Footage: 2507 sqft
Block: 00660
Subdivision: 2153 - SECTION 26-PINE GROVE
Job Phone: 386-447-4151
Location Address: 55 PIN OAK DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/31/2020
NOC: RECORDED
Applicant name: GENE WARREN SLONE
Owner: ROBERT, VERA M

Address

10511 WILLOW PARK VW

HOUSTON, TX 77070

Lot: 0360
Contracted Stated Job Value: ¤200,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

FLORIDA GREEN CONSTRUCTION INC.
Status Location Address State License Number Phone
INACTIVE

870 E RETTA STREET

DELEON SPRINGS, FL 32130

CBC1260957 (Exp: 08/31/2026) 407-580-2657

Sub Contractors

ERIC FRANCO
Status Location Address State License Number Phone
CANCEL

840 DELTONA BLVD SUITE F-2

SANFORD, FL 32771

CCC1327280 (Exp: 08/31/2022) 386-575-4007
JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144
GREGG A MCANALLY
Status Location Address State License Number Phone
INACTIVE

3370 AGRICULTURAL CENTER DRIVE

PALM COAST, FL 32092

CAC1815760 (Exp: 08/31/2022) 904-829-8898
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/20/2021 FINAL APPROVED MMESSER
U-CROSS CONNECTION 01/15/2021 APPROVED - AS NOTED LFITZGERALD
Note: THIS IS A REINSPECTION -potabale irrigation now with PVB installed THIS IS A REINSPECTION A Pressure vaume breaker(PVB) not an atmosphere vacume breaker needs to be installed for the irrigation of potable water
U -UTILITY RESIDENTIAL FINAL 01/15/2021 FINAL APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION water meter assembly required to be rotated back to original alignment which was installed straight
U -UTILITY RESIDENTIAL FINAL 01/07/2021 Disapproved - NO FEE LFITZGERALD
Note: water meter assembly required to be rotated back to original alignment which was installed straight
U-CROSS CONNECTION 01/07/2021 CANCELLED BY APPLICANT LFITZGERALD
U-CROSS CONNECTION 01/07/2021 Disapproved - NO FEE LFITZGERALD
Note: THIS IS A REINSPECTION A Pressure vaume breaker(PVB) not an atmosphere vacume breaker needs to be installed for the irrigation of potable water
ROW - FINAL APRON (AFTER POUR) 01/06/2021 APPROVED KRUTH
Note: CULVERT PIPE IS GOOD
ROW - STORMWATER FINAL 01/06/2021 APPROVED KRUTH
ROW FIELD SURVEY /GRADING CERTIFICATION 01/05/2021 APPROVED GBERTOLA
FINAL SURVEY (OFFICE USE ONLY) 01/05/2021 APPROVED GBERTOLA
ELECTRIC - EARLY POWER 10/27/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 9:45
ROW- PRE-APRON (PRE-POUR) 10/07/2020 APPROVED - AS NOTED KHOWELL
Note: THIS IS A REINSPECTION * BENCH MARK ON SWALE PLAN DOES NOT MATCH SITE PLAN, SHOULD HAVE CALLED TIM BAKER AT THE CITY. SITE PLAN 25.95 THE SWALE PLAN SHOWS 25.85 WHICH IS WRONG BY NOT VERIFING BRENCH MARKS MATCH HAS CAUSED THE CULVERT PIPE TO BE OUT OF TOLERANCE. * REMOVE ASPHALT FROM APRON AND DIG APRON OUT AT THE ROAD TO A MINIMUM OF 5" AND COMPACT SOIL
ROW- PRE-APRON (PRE-POUR) 09/30/2020 Disapproved - NO FEE KHOWELL
Note: * BENCH MARK ON SWALE PLAN DOES NOT MATCH SITE PLAN, SHOULD HAVE CALLED TIM BAKER AT THE CITY. SITE PLAN 25.95 THE SWALE PLAN SHOWS 25.85 WHICH IS WRONG BY NOT VERIFING BRENCH MARKS MATCH HAS CAUSED THE CULVERT PIPE TO BE OUT OF TOLERANCE. * REMOVE ASPHALT FROM APRON AND DIG APRON OUT AT THE ROAD TO A MINIMUM OF 5" AND COMPACT SOIL
U - SEWER TIE IN 09/23/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 09/23/2020 APPROVED JGIBSON
PEP TANK INSTALLATION REQUEST 08/17/2020 APPROVED CSTONE
INSULATION 07/27/2020 APPROVED JBODEN
LATH/BRICK/ WATER BARRIER 07/27/2020 APPROVED JBODEN
ALL ROUGH 07/16/2020 APPROVED MMESSER
ROOF VALLEY & METAL 06/18/2020 APPROVED MMESSER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/17/2020 APPROVED MMESSER
ROOF SHEATHING 06/12/2020 APPROVED MMESSER
FOUND SURVEY APPROVED (OFFICE) 05/19/2020 APPROVED TBAKER
TIE BEAM / LINTEL 05/19/2020 APPROVED MMESSER
MONOLITHIC SLAB 05/12/2020 APPROVED MMESSER
PLUMBING 1ST ROUGH UNDERGROUND 05/04/2020 APPROVED JGIBSON
ELECTRIC TEMP POLE 04/17/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 11:35
WATER METER INSTALLATION REQUEST 04/17/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 08/17/2020 08/17/2020
Note: Released By: AMOBLEY
ZON COMPLETE 05/18/2020 05/18/2020
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 05/18/2020 05/19/2020
Note: Released By: TBAKER
PLENV COMPLETE 03/31/2020 03/31/2020
Note: Released By: JMYERS The After Action Report from FWC has been accepted.
PLENV HOLD 02/11/2020 02/12/2020
Note: Held By: JMYERS Per FWC Officer, Gopher Tortoise burrow was impacted during clearing. Please provide permit from FWC that this has been remedied prior to continuing construction activities.
ZON COMPLETE 01/29/2020 01/30/2020
Note: Released By: AMOBLEY
BLD COMPLETE 01/29/2020 01/30/2020
Note: Released By: JPI
SWALE COMPLETE 01/21/2020 02/10/2020
Note: Released By: TBAKER
BLD HOLD 01/15/2020 01/17/2020
Note: Held By: JPI 1. Please provide product approval information for panel wall items and also wood connectors and wood anchors, on the product approval sheet. 2. Please add the label for a Vacuum Breaker on the hose bib. (R2902.4)
CUSVC COMPLETE 01/15/2020 01/16/2020
Note: Released By: HHAND
ELEC COMPLETE 01/15/2020 01/17/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 01/15/2020 01/21/2020
Note: Released By: TBAKER
LOCATE COMPLETE 01/15/2020 01/16/2020
Note: Released By: CSTONE
MECH COMPLETE 01/15/2020 01/16/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 01/15/2020 01/17/2020
Note: Released By: JPI
SW1 COMPLETE 01/15/2020 01/16/2020
Note: Released By: CTROHA
UD1 COMPLETE 01/15/2020 01/21/2020
Note: Released By: AHALL
ZON HOLD 01/15/2020 01/16/2020
Note: Held By: AMOBLEY Exterior color does not meet the definition of an earth tone and does not meet the LRV

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 01/20/2021
TRANSPORTATION IMPACT FEE ¤40.74 05/28/2020
CONTRACTOR CHANGE ¤40.00 05/28/2020
3% TRANS IMPACT FEE CREDIT (¤48.96) 01/31/2020
SEWER CREDIT (¤1,466.00) 01/31/2020
SEWER INSPECTION ¤25.00 01/31/2020
SEWER CAPITAL FACILITY ¤4,596.07 01/31/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 01/31/2020
METER - DEPOSIT ¤60.00 01/31/2020
WATER- TURN ON ¤25.00 01/31/2020
ADMIN FEE ¤20.00 01/31/2020
CONNECTION FEES ¤1,002.88 01/31/2020
ELECTRIC FEE ¤190.20 01/31/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 01/31/2020
IMPACT FEE FIRE ¤223.38 01/31/2020
IMPACT FEE PARKS ¤849.24 01/31/2020
IMPACT FEE SCHOOL ¤3,600.00 01/31/2020
MECHANICAL FEE ¤190.20 01/31/2020
WATER -IRRIGATION INSPECTION ¤25.00 01/31/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 01/31/2020
PLAN CHECK FEE ¤86.80 01/31/2020
PLUMBING FEE ¤190.20 01/31/2020
NEW RESIDENTIAL INSPECTIONS ¤434.00 01/31/2020
SITE PLAN 20 ¤20.00 01/31/2020
SURCHARGE FS 533.721 ¤10.45 01/31/2020
SURCHARGE - FS 468.631 ¤15.67 01/31/2020
STORM WATER PERMIT FEES ¤80.00 01/31/2020
TRANSPORTATION IMPACT FEE ¤1,632.00 01/31/2020
Fees Total Due: ¤0.00 Total Paid: ¤15,223.87