I want to search for...
Permit #2020010484
Permit Details
Status: COED
| Parcel Id: 07-11-31-7022-00060-0200 |
| CONDITIONED SPACE: 3067 sqft |
| GARAGE: 704 sqft |
| OPENED PORCH (WITH ROOF) : 122 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| CONDITIONED SPACE: 802 sqft |
| Total Square Footage: 4743 sqft |
| Block: 00060 |
| Subdivision: 2217 - SECTION 22-WYNNFIELD |
| Job Phone: 386-447-4151 |
| Location Address: 62 WESTCEDAR LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/11/2020 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: BONGO, DAVID A |
|
Address 66 WESTCEDAR LANE PALM COAST, FL 32164 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤500,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
GREGG A MCANALLY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE PALM COAST, FL 32092 |
CAC1815760 (Exp: 08/31/2022) | 904-829-8898 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/18/2021 | FINAL APPROVED | WMILLER |
| U-CROSS CONNECTION | 02/16/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation-PVB installed | |||
| U -UTILITY RESIDENTIAL FINAL | 02/16/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: water meter pit too high-work order submitted by this inspector to customer service to have lowered | |||
| ROW - FINAL APRON (AFTER POUR) | 02/12/2021 | APPROVED | KRUTH |
| ROW - STORMWATER FINAL | 02/12/2021 | APPROVED | KRUTH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/11/2021 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 02/11/2021 | APPROVED | KRUTH |
| ROW- PRE-APRON (PRE-POUR) | 12/28/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION NEED TO PUMP WATER OUT OF THE FOOTERS FORM BOARD MISSING BY THE GARAGE LEFT UPPER SIDE MARK IT WITH PINK AND GREEN PAINT BY AT THE END OF THE APRON NEED TO SHAVE DOWN 1 INCH ON RIGHT SIDE APRON MARK WITH PINK SPRAY PAINT 12/28/20 - Corrections made. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/15/2020 | Disapproved - NO FEE | GBERTOLA |
| Note: NEED TO PUMP WATER OUT OF THE FOOTERS FORM BOARD MISSING BY THE GARAGE LEFT UPPER SIDE MARK IT WITH PINK AND GREEN PAINT BY AT THE END OF THE APRON NEED TO SHAVE DOWN 1 INCH ON RIGHT SIDE APRON MARK WITH PINK SPRAY PAINT | |||
| ELECTRIC - EARLY POWER | 09/23/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:46 am | |||
| GRAVITY SEWER TEST | 08/14/2020 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 08/14/2020 | APPROVED | JGIBSON |
| PEP TANK INSTALLATION REQUEST | 08/06/2020 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC-TUG | 08/06/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 11:10 | |||
| LATH/BRICK/ WATER BARRIER | 07/24/2020 | APPROVED | MMESSER |
| Note: THIS IS A REINSPECTION Staple fasteners to be 7/8" long, spaced not less than 6" (R703.7.1) | |||
| LATH/BRICK/ WATER BARRIER | 07/23/2020 | Disapproved - NO FEE | MMESSER |
| Note: Staple fasteners to be 7/8" long, spaced not less than 6" (R703.7.1) | |||
| INSULATION | 07/21/2020 | APPROVED | JBODEN |
| ALL ROUGH | 07/08/2020 | APPROVED - AS NOTED | JCOLASANTI |
| Note: Smoke detector 3' from fan blade (upstairs rear bedroom)....5' head presure (not enough water in pipe for test) check at insulation) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/26/2020 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION inspected sheathing on roof only, need to call in for braces, ties and engineering need correct holddowns for triple trusses first floor entrance area....need bolts 21" OC.... | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/24/2020 | Disapproved - NO FEE | JCOLASANTI |
| Note: THIS IS A REINSPECTION inspected sheathing on roof only, need to call in for braces, ties and engineering need correct holddowns for triple trusses first floor entrance area....need bolts 21" OC.... | |||
| ROOF VALLEY & METAL | 05/29/2020 | APPROVED | JCOLASANTI |
| ROOF VALLEY & METAL | 05/28/2020 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/19/2020 | PARTIALLY APPROVED | JCOLASANTI |
| Note: inspected sheathing on roof only, need to call in for braces, ties and engineering | |||
| TIE BEAM / LINTEL | 04/15/2020 | APPROVED | JCOLASANTI |
| TIE BEAM / LINTEL | 04/08/2020 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 04/07/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/26/2020 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/16/2020 | APPROVED | JGIBSON |
| ELECTRIC TEMP POLE | 02/28/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 2:00 | |||
| WATER METER INSTALLATION REQUEST | 02/18/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 04/07/2020 | 04/07/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 02/06/2020 | 02/07/2020 |
| Note: Released By: ELENS | |||
| ZON | HOLD | 02/04/2020 | 02/05/2020 |
| Note: Held By: ELENS Repeat comment: The total area square footage calculations is incorrect. Please correct. (When I add it up, the "Total Area" comes to 3,955 (not 3944) Then add the Bonus room and the Total SF under room comes to 4757...not 4745)) | |||
| SWALE | COMPLETE | 02/03/2020 | 02/20/2020 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 01/29/2020 | 01/30/2020 |
| Note: Held By: ELENS Repeat comment: The total area square footage calculations is incorrect. Please correct and include the Bonus Room Area in the total. | |||
| ELEC | COMPLETE | 01/29/2020 | 01/30/2020 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 01/29/2020 | 01/30/2020 |
| Note: Released By: JPI | |||
| ENGIN1 | COMPLETE | 01/29/2020 | 02/03/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 01/16/2020 | 01/18/2020 |
| Note: Held By: JPI 1. Please provide product approval information for panel wall items and also wood connectors and wood anchors, on the product approval sheet. 2. Please add the label for a Vacuum Breaker on the hose bib. (R2902.4) | |||
| CUSVC | COMPLETE | 01/16/2020 | 01/16/2020 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 01/16/2020 | 01/17/2020 |
| Note: Held By: JMUNSON Need outlet in bathroom. NEC 2014 art 210.52 (D) | |||
| ENGIN1 | HOLD | 01/16/2020 | 01/21/2020 |
| Note: Held By: TBAKER No benchmark on survey | |||
| LOCATE | COMPLETE | 01/16/2020 | 01/16/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 01/16/2020 | 01/17/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 01/16/2020 | 01/18/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 01/16/2020 | 01/16/2020 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 01/16/2020 | 01/21/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 01/16/2020 | 01/16/2020 |
| Note: Held By: ELENS The total area square footage calculations is incorrect. Please correct and include the Bonus Room Area in the total. Another form of Articulation is required: LDC 13.03.03 Facade Design: Articulation.Facade articulation is required to add interest to a building. The following features shall be acceptable techniques of exterior articulation: 1. A base course or plinth course; banding, moldings, or string courses; quoins; oriels; cornices; arches; balconies; brackets; shutters; keystones; dormers; louvers as part of the exterior wall construction. 2. Quoins and banding shall wrap around the corners of the structure for at least two feet. 3. Banding placed around the windows and doors visible from the right-of-way, golf course,canals, lakes, or other similar highly visible areas. Window shutters may substitute for banding. 4. Horizontal banding continuing the length of the wall that faces a street, golf course,saltwater canal, or other similar highly visible areas. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| TRANSPORTATION IMPACT FEE | ¤40.74 | 02/18/2021 |
| TRANSPORTATION IMPACT FEE | ¤1,632.00 | 02/11/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 02/11/2020 |
| SEWER CREDIT | (¤850.00) | 02/11/2020 |
| SEWER INSPECTION | ¤25.00 | 02/11/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 02/11/2020 |
| WATER CREDIT | (¤60.00) | 02/11/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 02/11/2020 |
| METER - DEPOSIT | ¤60.00 | 02/11/2020 |
| WATER- TURN ON | ¤25.00 | 02/11/2020 |
| ADMIN FEE | ¤20.00 | 02/11/2020 |
| CONNECTION FEES | ¤1,002.88 | 02/11/2020 |
| ELECTRIC FEE | ¤360.00 | 02/11/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 02/11/2020 |
| IMPACT FEE FIRE | ¤223.38 | 02/11/2020 |
| IMPACT FEE PARKS | ¤849.24 | 02/11/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/11/2020 |
| MECHANICAL FEE | ¤360.00 | 02/11/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/11/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 02/11/2020 |
| PLAN CHECK FEE | ¤200.00 | 02/11/2020 |
| PLUMBING FEE | ¤360.00 | 02/11/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤1,000.00 | 02/11/2020 |
| SITE PLAN 20 | ¤20.00 | 02/11/2020 |
| SURCHARGE FS 533.721 | ¤21.20 | 02/11/2020 |
| SURCHARGE - FS 468.631 | ¤31.80 | 02/11/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/11/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,915.35 |