I want to search for...

Permit #2020011032

Permit Details

Status: CANCEL

Parcel Id: 19-11-31-0330-00000-00A0
Block: 00000
Subdivision: 2298 - AMERICAN VILLAGE
Location Address: 100 GREEN CIR
Type: BCR - BUILDING COMMERCIAL RESIDENTIAL -CONDO
NOC: NO DOCUMENTATION
Applicant name: LUIS JORGE MEDEIROS
Owner: HAMMOCK REAL ESTATE DEVELOPMENT LLC

Address

200 OCEAN CREST DRIVE #1111

PALM COAST, FL 32137

Lot: 00A0
Contracted Stated Job Value: ¤4,500,000.00
Job Description: 4 STORY CONDOMINIUM BUILDING 32 UNITS
Type: CN

Contractor

SUN STATE CUSTOM BUILDERS, LLC
Status Location Address State License Number
CANCEL

946 SHADICH DRIVE

ORANGE CITY, FL

CGC1519145 (Exp: 08/31/2022)

Sub Contractors

JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
JOSE E ORTIZ JR
Status Location Address Mailing Address State License Number Phone
CANCEL

4601 E MOODY BLVD

BUNNELL, FL 32110

SUITE B7

BUNNELL, FL 32110

RC29027619 (Exp: 08/31/2023) 386-503-6922

Inspection History

Type Request Date Result Inspector
FOUNDATION SURVEY - OFFICE USE ONLY
BLD - GREASE INTERCEPTOR PLUMBING & VENTING
PLUMBING 1ST ROUGH
PLUMBING 2ND ROUGH
GRAVITY SEWER
BLD - SEWER TIE IN
PLUMBING FINAL
HVAC ROUGH
HVAC FINAL
ELECTRIC 1ST ROUGH
ELECTRIC 2ND ROUGH
ELECTRIC FINAL
MONOLITHIC SLAB
SECOND FLOOR SLAB
ROOF SHEATHING / BRACE / TIE DOWN
INSULATION
BUILDING FINAL
FIREWALL
FIRE FINAL
EXTERIOR ARCHITECTURAL FEATURES
WATER METER INSTALLATION REQUEST
U - UTILITY COMMERCIAL FINAL

Review History

Department Status Date In Date Out
MECH COMPLETE 08/14/2020 08/17/2020
Note: Released By: CPISCITELLI
BLD COMPLETE 08/14/2020 08/20/2020
Note: Released By: JPI
PLUM COMPLETE 08/14/2020 08/20/2020
Note: Released By: JPI
ARCHR COMPLETE 08/14/2020 08/21/2020
Note: Released By: BDAWSON
UD1 COMPLETE 07/22/2020 07/23/2020
Note: Released By: CJOHNSON
UD1 HOLD 07/15/2020 07/20/2020
Note: Held By: CJOHNSON You will need to provide all data and process on how the facility will track and make each unit accountable for its water use.
MECH HOLD 07/15/2020 07/20/2020
Note: Held By: CPISCITELLI Provide manufacturers specs for ventless dryers (second request)
BLD HOLD 07/15/2020 07/21/2020
Note: Held By: JPI 1. Please clarify when fire alarm shop drawings will be submitted. 2. A-401.00 wall sections- exterior wood frame wall is below adjacent exterior slab/grade. ([a] 107.2.1). Appears that this was not corrected on the wall section. 3. Clearly indicate the units which will comply with fha regulations. Identify on the plans the required accessible features. show required clear space in front of appliances. ([a] 107.2.1). Response to comments not complete, cannot located Accessibility notes on G-004, nor the schedule of units on A-506. 4. Product approval submittal is incomplete. Please provide PA numbers for mullions, underlayment and lap siding. 5. Provide a written response to the comments with revisions clouded on plan and page numbers of new details provided.
PLUM HOLD 07/15/2020 07/21/2020
Note: Held By: JPI 1. No additional comments at this time. Subject to building review approval.
ARCHR HOLD 07/15/2020 07/22/2020
Note: Held By: LMUSGROVE
UD1 HOLD 06/22/2020 06/23/2020
Note: Held By: CJOHNSON Civil and building plans do not match. Civil plans call out a meter room. Typically individual meters are required for each unit in a meter bank or meter room. I see that these are proposed to be sub-metered in the units. You will need to provide all data and process on how the facility will track and make each unit accountable for its water use.
PLUM HOLD 06/22/2020 07/06/2020
Note: Held By: JPI see building comments and provide a detailed response to building comments.
MECH HOLD 06/22/2020 07/06/2020
Note: Held By: CPISCITELLI 1. Provide Manufacturer's specs for ventless dryers 2. Provide UL Listing for Fire smoke dampers
FI1 COMPLETE 06/22/2020 07/08/2020
Note: Released By: WMILLER 1. Please provide Life Safety Plan for review, with locations of Extinguishers (including travel distance), Emergency Egress, Emergency Lighting, Travel distance from most remote locations, Travel Distance to an Exit Per FFPC 6th edition and AHJ 2. Please Show Extinguishers Per FFPC 6th edition and FBC 2017 Section 906 3. Please Place a note on the Title Page stating Separate permits for Fire Sprinklers, and Fire Alarms are required and will be obtained. 4. Please be advised The FP pages, and Fire Sprinkler page will be rejected from the submittal as they pertain to the Fire Sprinkler and must be reviewed under submittal for Fire Sprinklers. 5. Please provide FIRE Code Analysis and list FFPC Sixth Edition, 6. Please contact Jarrad Shupe (with Flagler County) at: 386-313-4281 in regards to Grid testing and installation of BDA (Bi-Directional Antenna) Per NFPA 1, Section 10.1 (6th edition), NFPA 72 (2013), and NFPA 1221 (2016). 7. Please identify all pages on cover page (sheet index is not complete) 8. Please place to following information for Knox Box on the Life safety page or cover sheet and define location in response letter: Please select FLAGLER COUNTY DEPT. of EMERGENCY MANAGEMENT, for jurisdiction or agency even though it is going in the city. This way it will get it keyed correctly. https://www.knoxbox.com/Products/Commercial-KnoxBoxes
ELEC COMPLETE 06/22/2020 06/29/2020
Note: Released By: JMUNSON
BLD HOLD 06/22/2020 07/06/2020
Note: Held By: JPI 1. Please provide a written response specifically to the 30 comments provided in the first review. The responses should denote the revised plans in response to the comment.
ARCHR HOLD 06/22/2020 07/08/2020
Note: Held By: BDAWSON Awaiting approved site development revised architecturals.
MECH HOLD 06/01/2020 06/05/2020
Note: Held By: BBEMBRY Barbie, Jason and I met with Louis Medeiros yesterday in regards to the ongoing problems with his permit and getting the complete design plans uploaded. I think he may understand where the problem is now. We need to put all the pending reviews on HOLD so the permit will go back into the awaiting corrections mode so he can upload complete plans. Can you do this for me and send a notification email to all remaining reviewers including me, Josh, Fred, Chris and JPI, letting them know the reason. Thank you. Patrick Buckley Chief Building Official
BLD HOLD 06/01/2020 06/05/2020
Note: Held By: BBEMBRY Barbie, Jason and I met with Louis Medeiros yesterday in regards to the ongoing problems with his permit and getting the complete design plans uploaded. I think he may understand where the problem is now. We need to put all the pending reviews on HOLD so the permit will go back into the awaiting corrections mode so he can upload complete plans. Can you do this for me and send a notification email to all remaining reviewers including me, Josh, Fred, Chris and JPI, letting them know the reason. Thank you. Patrick Buckley Chief Building Official
PLUM HOLD 06/01/2020 06/05/2020
Note: Held By: BBEMBRY Barbie, Jason and I met with Louis Medeiros yesterday in regards to the ongoing problems with his permit and getting the complete design plans uploaded. I think he may understand where the problem is now. We need to put all the pending reviews on HOLD so the permit will go back into the awaiting corrections mode so he can upload complete plans. Can you do this for me and send a notification email to all remaining reviewers including me, Josh, Fred, Chris and JPI, letting them know the reason. Thank you. Patrick Buckley Chief Building Official
ELEC HOLD 06/01/2020 06/05/2020
Note: Held By: BBEMBRY Barbie, Jason and I met with Louis Medeiros yesterday in regards to the ongoing problems with his permit and getting the complete design plans uploaded. I think he may understand where the problem is now. We need to put all the pending reviews on HOLD so the permit will go back into the awaiting corrections mode so he can upload complete plans. Can you do this for me and send a notification email to all remaining reviewers including me, Josh, Fred, Chris and JPI, letting them know the reason. Thank you. Patrick Buckley Chief Building Official
UD1 HOLD 06/01/2020 06/04/2020
Note: Held By: CJOHNSON 1.Could not location sheet P-002 for booster pump information and detail 2.Civil and building plans do not match. Civil plans call out a meter room. Typically individual meters are required for each unit in a meter bank or meter room. I see that these are proposed to be sub-metered in the units. You will need to provide all data and process on how the facility will track and make each unit accountable for its water use.
ARCHR HOLD 06/01/2020 06/05/2020
Note: Held By: BBEMBRY Barbie, Jason and I met with Louis Medeiros yesterday in regards to the ongoing problems with his permit and getting the complete design plans uploaded. I think he may understand where the problem is now. We need to put all the pending reviews on HOLD so the permit will go back into the awaiting corrections mode so he can upload complete plans. Can you do this for me and send a notification email to all remaining reviewers including me, Josh, Fred, Chris and JPI, letting them know the reason. Thank you. Patrick Buckley Chief Building Official
FI1 HOLD 06/01/2020 06/05/2020
Note: Held By: BBEMBRY Barbie, Jason and I met with Louis Medeiros yesterday in regards to the ongoing problems with his permit and getting the complete design plans uploaded. I think he may understand where the problem is now. We need to put all the pending reviews on HOLD so the permit will go back into the awaiting corrections mode so he can upload complete plans. Can you do this for me and send a notification email to all remaining reviewers including me, Josh, Fred, Chris and JPI, letting them know the reason. Thank you. Patrick Buckley Chief Building Official
MECH HOLD 04/03/2020 04/06/2020
Note: Held By: CPISCITELLI Provide complete set of mechanical plans by Florida licensed professional Engineer. If Registered Design Professional wishes to claim exemption for 105.3.1.2, Then provide a statement as such that the project is eligible. Corrected plans must include dryervent schematics and fire penetration details, radiant ceiling dampers, copper line set fire penetration details, exhaust fan location, termination and fire penetration details. Also include cut sheets for radiant dampers, exhaust fans, dryervent boxes. Also need to revise plans to match ventilation. Both natural and mechanical fresh air are shown in the prints.
PLUM HOLD 04/03/2020 04/06/2020
Note: Held By: JPI 1. provide the current florida building code and subsections on the plumbing plans (1027.1).
UD1 HOLD 04/03/2020 04/08/2020
Note: Held By: CJOHNSON Provide plumbing plans
DSD COMPLETE 04/03/2020 04/03/2020
Note: Released By: DRAMIREZ
FI1 HOLD 04/03/2020 04/16/2020
Note: Held By: WMILLER Please upload properly signed and sealed documents for review. 1. Need Florida licensed architec or engineer 2. Signature has been reproduced on each page and must be signed individually. Provide original signed and sealed architectural drawings 6th ed. FBC 107 and Article 481 of Florida Statutes
ARCHR HOLD 04/03/2020 04/14/2020
Note: Held By: BDAWSON - Elevations differ from approved plans on site development permit. A modification to the site development permit will need to be applied for. - Provide elevations that call out all colors/finishes.
ELEC HOLD 04/03/2020 04/07/2020
Note: Held By: JMUNSON Provide complete set of Electrical plans by Florida licensed professional Engineer. If Registered Design Professional wishes to claim exemption for 105.3.1.2, Then provide a statement as such that the project is eligible. Corrected plans must include fire penetration details. Floor plans need to include all outlets ,smokes and GFCI protection. Need a Riser Diagram showing all wire sizes and service details. Submit a general panel schedule for the units and a equipment shedule.
BLD HOLD 04/03/2020 04/06/2020
Note: Held By: JPI 1. note- fire alarm shop drawings not included 4/6/20. ([f] 907.1) 2. note- soil report required per sheet s-1. 3. note- plans are sealed with a new york seal. 4. provide the current florida building code and subsections on the plans. 5. in general, throughout plans, format the code reference to the current florida building code 6th edition, 2017. 6. sheet g-001.00 a. plans state this building is within the hvhz b. code reference to fire sprinklers do not exist in the fbc. 7. please tag all wall types, separation walls, shaft walls, horizontal assemblies to ensure separation compliance with section (420.1). 8. please provide the complete ul details on the plans for rated assemblies, where options are given, select which specific will be used. show opening protection to attic where required. (703.2) 9. graphically show the proposed fire separation distance in the code analysis & to all property lines. the building scales to less than 30’ on the site plan, sheet g-001.00. (table 602.2) 10. a-401.00 wall sections- exterior wood frame wall is below adjacent exterior slab/grade. ([a] 107.2.1) 11. a-507.00 ada kitchen detail- provide dimensions heights to finished surfaces. 12. clearly indicate the units which will comply with fha regulations. identify on the plans the required accessible features. show required clear space in front of appliances. ([a] 107.2.1) 13. please reference & provide complete ul details on the plans, where options are given, select which specific will be used. (703.2) 14. show the draftstopping on the plans. (718.1) 15. interior wall and ceiling finish materials shall be classified for fire performance and smoke development, see (section 803.1). 16. provide the required interior floor finish and floor covering materials class, see (section 804.1). 17. provide the fire performance and smoke development, for the insulation. ([a] 107.2.1) 18. please show the locations of the portable fire extinguishers on the plans. ([f] 906.1) 19. show mail room accessibility. (1101.1) 20. provide an occupant count for each level, tabulate the required and provided sizing of doors, stair, corridors, all portions of the egress system with the occupant count. show on plans. (1001) 21. egress plans- g-003.00 a. show the exit signs & required illumination. (1001, 1013) b. total length of the provided common path. (1006.1) c. provide the proposed exit access travel distance from the most remote point on the plans- the total distance from the most remote point to the public way. (1017.3) 22. label the emergency escape & rescue openings. (1030.1) 23. show a complete egress plan of the lobby level- (1001) a. provide an occupant count, assign a function for the lobby in accordance with section (1004.1). b. show the total cumulative number of occupants for this level. (1004.1). c. show the required number of exits based on the occupant count. (1006.1). d. show the required and provided door widths on the egress plans, show hardware required for the main exit. (1005.1, 1010.1.10) 24. stairs a. provide information for the handrail and fall protection. (1014, 1015) b. provide general information for the proposed rise, run. (1004) 25. exterior exit stair- the plan view of the upper floor shows an enclosed stairway, elevations show an open stair. revise to show the correct layout. please provide a code analysis to ensure the stairway meets the exterior exit stair requirements of section (1027.1). 26. roof plan- all materials will need to be specified on the plans. (1503.1) 27. provide a consistant wind speed between the architectural & structural dwgs. sheets g-001.00 & s-1. 28. connection of stair to building & foundation required (1027.1). 29. provide design wind pressures for building zones 1 thru 5 (1027.1). 30. product approvals were not provided. required for all components & cladding- windows, doors, siding, roof materials, ect. show attachment method for each (1027.1).
MECH HOLD 04/03/2020 04/06/2020
Note: Held By: CPISCITELLI Provide complete set of mechanical plans by Florida licensed professional Engineer. If Registered Design Professional wishes to claim exemption for 105.3.1.2, Then provide a statement as such that the project is eligible. Corrected plans must include dryervent schematics and fire penetration details, radiant ceiling dampers, copper line set fire penetration details, exhaust fan location, termination and fire penetration details. Also include cut sheets for radiant dampers, exhaust fans, dryervent boxes. Provide equipment schedule and typical installation details for units and ductwork. Provide hurricane strapping details for roof top equipment. Also need to revise plans to match ventilation. Both natural and mechanical fresh air are shown in the prints.
BLD HOLD 03/23/2020 03/23/2020
Note: Held By: BBEMBRY Not all original comments have been addressed. 1. The plans submitted are not digtially signed and sealed. 2. The plan file need to be named according to the plans sheet name only. (please refer to the document submittal requirements on the portal) - example: EN-003.00 3. Product approval sheet is required.
ARCHR HOLD 01/28/2020 02/04/2020
Note: Held By: BBEMBRY From: Barbie Bembry Sent: Tuesday, February 4, 2020 2:25 PM To: 'SUNSTATECUSTOMBUILDERS@GMAIL.COM' <SUNSTATECUSTOMBUILDERS@GMAIL.COM> Cc: Jason DeLorenzo <JDeLorenzo@palmcoastgov.com>; Patrick Buckley <PBuckley@palmcoastgov.com>; Jeanne Montaruli <JMontaruli@palmcoastgov.com>; Libby Musgrove <LMusgrove@palmcoastgov.com>; Marga DeFreitas <MDeFreitas@palmcoastgov.com>; Scott Thomas <sthomas@palmcoastgov.com> Subject: 100 Green Circle - 4 Story Condominium building The submittal for 100 Green Circle needs corrections before we can begin review. (4 story condominium building) It appears that two entire sets of plan are submitted as one file under the document type ‘energy calculations’ and ‘product approval’ and “roofing worksheet’. Please submit paged individually. Your file names should be in accordance with the document requirements naming convention. http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf Plans must be digitally signed and sealed. Upload the product approval sheet. Upload energy calculations Upload a roofing worksheet You can find the checklist for commercial construction here - https://www.palmcoastgov.com/government/building/contractordocumentdetails/132 The civil plans will be removed from the permit package, they are reviewed and approved through the site development review process.
BLD HOLD 01/28/2020 02/04/2020
Note: Held By: BBEMBRY From: Barbie Bembry Sent: Tuesday, February 4, 2020 2:25 PM To: 'SUNSTATECUSTOMBUILDERS@GMAIL.COM' <SUNSTATECUSTOMBUILDERS@GMAIL.COM> Cc: Jason DeLorenzo <JDeLorenzo@palmcoastgov.com>; Patrick Buckley <PBuckley@palmcoastgov.com>; Jeanne Montaruli <JMontaruli@palmcoastgov.com>; Libby Musgrove <LMusgrove@palmcoastgov.com>; Marga DeFreitas <MDeFreitas@palmcoastgov.com>; Scott Thomas <sthomas@palmcoastgov.com> Subject: 100 Green Circle - 4 Story Condominium building The submittal for 100 Green Circle needs corrections before we can begin review. (4 story condominium building) It appears that two entire sets of plan are submitted as one file under the document type ‘energy calculations’ and ‘product approval’ and “roofing worksheet’. Please submit paged individually. Your file names should be in accordance with the document requirements naming convention. http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf Plans must be digitally signed and sealed. Upload the product approval sheet. Upload energy calculations Upload a roofing worksheet You can find the checklist for commercial construction here - https://www.palmcoastgov.com/government/building/contractordocumentdetails/132 The civil plans will be removed from the permit package, they are reviewed and approved through the site development review process.
DSD HOLD 01/28/2020 02/04/2020
Note: Held By: BBEMBRY From: Barbie Bembry Sent: Tuesday, February 4, 2020 2:25 PM To: 'SUNSTATECUSTOMBUILDERS@GMAIL.COM' <SUNSTATECUSTOMBUILDERS@GMAIL.COM> Cc: Jason DeLorenzo <JDeLorenzo@palmcoastgov.com>; Patrick Buckley <PBuckley@palmcoastgov.com>; Jeanne Montaruli <JMontaruli@palmcoastgov.com>; Libby Musgrove <LMusgrove@palmcoastgov.com>; Marga DeFreitas <MDeFreitas@palmcoastgov.com>; Scott Thomas <sthomas@palmcoastgov.com> Subject: 100 Green Circle - 4 Story Condominium building The submittal for 100 Green Circle needs corrections before we can begin review. (4 story condominium building) It appears that two entire sets of plan are submitted as one file under the document type ‘energy calculations’ and ‘product approval’ and “roofing worksheet’. Please submit paged individually. Your file names should be in accordance with the document requirements naming convention. http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf Plans must be digitally signed and sealed. Upload the product approval sheet. Upload energy calculations Upload a roofing worksheet You can find the checklist for commercial construction here - https://www.palmcoastgov.com/government/building/contractordocumentdetails/132 The civil plans will be removed from the permit package, they are reviewed and approved through the site development review process.
ELEC HOLD 01/28/2020 02/04/2020
Note: Held By: BBEMBRY From: Barbie Bembry Sent: Tuesday, February 4, 2020 2:25 PM To: 'SUNSTATECUSTOMBUILDERS@GMAIL.COM' <SUNSTATECUSTOMBUILDERS@GMAIL.COM> Cc: Jason DeLorenzo <JDeLorenzo@palmcoastgov.com>; Patrick Buckley <PBuckley@palmcoastgov.com>; Jeanne Montaruli <JMontaruli@palmcoastgov.com>; Libby Musgrove <LMusgrove@palmcoastgov.com>; Marga DeFreitas <MDeFreitas@palmcoastgov.com>; Scott Thomas <sthomas@palmcoastgov.com> Subject: 100 Green Circle - 4 Story Condominium building The submittal for 100 Green Circle needs corrections before we can begin review. (4 story condominium building) It appears that two entire sets of plan are submitted as one file under the document type ‘energy calculations’ and ‘product approval’ and “roofing worksheet’. Please submit paged individually. Your file names should be in accordance with the document requirements naming convention. http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf Plans must be digitally signed and sealed. Upload the product approval sheet. Upload energy calculations Upload a roofing worksheet You can find the checklist for commercial construction here - https://www.palmcoastgov.com/government/building/contractordocumentdetails/132 The civil plans will be removed from the permit package, they are reviewed and approved through the site development review process.
FI1 HOLD 01/28/2020 02/04/2020
Note: Held By: BBEMBRY From: Barbie Bembry Sent: Tuesday, February 4, 2020 2:25 PM To: 'SUNSTATECUSTOMBUILDERS@GMAIL.COM' <SUNSTATECUSTOMBUILDERS@GMAIL.COM> Cc: Jason DeLorenzo <JDeLorenzo@palmcoastgov.com>; Patrick Buckley <PBuckley@palmcoastgov.com>; Jeanne Montaruli <JMontaruli@palmcoastgov.com>; Libby Musgrove <LMusgrove@palmcoastgov.com>; Marga DeFreitas <MDeFreitas@palmcoastgov.com>; Scott Thomas <sthomas@palmcoastgov.com> Subject: 100 Green Circle - 4 Story Condominium building The submittal for 100 Green Circle needs corrections before we can begin review. (4 story condominium building) It appears that two entire sets of plan are submitted as one file under the document type ‘energy calculations’ and ‘product approval’ and “roofing worksheet’. Please submit paged individually. Your file names should be in accordance with the document requirements naming convention. http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf Plans must be digitally signed and sealed. Upload the product approval sheet. Upload energy calculations Upload a roofing worksheet You can find the checklist for commercial construction here - https://www.palmcoastgov.com/government/building/contractordocumentdetails/132 The civil plans will be removed from the permit package, they are reviewed and approved through the site development review process.
PLUM HOLD 01/28/2020 02/04/2020
Note: Held By: BBEMBRY From: Barbie Bembry Sent: Tuesday, February 4, 2020 2:25 PM To: 'SUNSTATECUSTOMBUILDERS@GMAIL.COM' <SUNSTATECUSTOMBUILDERS@GMAIL.COM> Cc: Jason DeLorenzo <JDeLorenzo@palmcoastgov.com>; Patrick Buckley <PBuckley@palmcoastgov.com>; Jeanne Montaruli <JMontaruli@palmcoastgov.com>; Libby Musgrove <LMusgrove@palmcoastgov.com>; Marga DeFreitas <MDeFreitas@palmcoastgov.com>; Scott Thomas <sthomas@palmcoastgov.com> Subject: 100 Green Circle - 4 Story Condominium building The submittal for 100 Green Circle needs corrections before we can begin review. (4 story condominium building) It appears that two entire sets of plan are submitted as one file under the document type ‘energy calculations’ and ‘product approval’ and “roofing worksheet’. Please submit paged individually. Your file names should be in accordance with the document requirements naming convention. http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf Plans must be digitally signed and sealed. Upload the product approval sheet. Upload energy calculations Upload a roofing worksheet You can find the checklist for commercial construction here - https://www.palmcoastgov.com/government/building/contractordocumentdetails/132 The civil plans will be removed from the permit package, they are reviewed and approved through the site development review process.
UD1 HOLD 01/28/2020 02/04/2020
Note: Held By: BBEMBRY From: Barbie Bembry Sent: Tuesday, February 4, 2020 2:25 PM To: 'SUNSTATECUSTOMBUILDERS@GMAIL.COM' <SUNSTATECUSTOMBUILDERS@GMAIL.COM> Cc: Jason DeLorenzo <JDeLorenzo@palmcoastgov.com>; Patrick Buckley <PBuckley@palmcoastgov.com>; Jeanne Montaruli <JMontaruli@palmcoastgov.com>; Libby Musgrove <LMusgrove@palmcoastgov.com>; Marga DeFreitas <MDeFreitas@palmcoastgov.com>; Scott Thomas <sthomas@palmcoastgov.com> Subject: 100 Green Circle - 4 Story Condominium building The submittal for 100 Green Circle needs corrections before we can begin review. (4 story condominium building) It appears that two entire sets of plan are submitted as one file under the document type ‘energy calculations’ and ‘product approval’ and “roofing worksheet’. Please submit paged individually. Your file names should be in accordance with the document requirements naming convention. http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf Plans must be digitally signed and sealed. Upload the product approval sheet. Upload energy calculations Upload a roofing worksheet You can find the checklist for commercial construction here - https://www.palmcoastgov.com/government/building/contractordocumentdetails/132 The civil plans will be removed from the permit package, they are reviewed and approved through the site development review process.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMIN COMMERCIAL ¤60.00
BUILDING DISCOUNT 100% (¤38,265.00)
ELECTRIC FEE ¤2,760.00
3% FIRE IMPACT FEE CREDIT (¤214.44)
IMPACT FEE FIRE ¤7,148.16
IMPACT FEE PARKS ¤27,175.68
IMPACT FEE TRANSPORTATION ¤56,416.00
MECHANICAL FEE ¤2,760.00
PERMIT FEE ¤24,750.00
3% PARKS IMPACT FEE CREDIT (¤815.27)
PLAN CHECK FEE ¤5,175.00
PLUMBING FEE ¤2,760.00
SURCHARGE FS 533.721 ¤2.00
SURCHARGE - FS 468.631 ¤2.00
3% TRANS IMPACT FEE CREDIT (¤1,692.48)
Fees Total Due: ¤88,021.65 Total Paid: ¤0.00